Loading…
Loading…
8,505 results • Best match
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY IMPROVEMENT OF CONDRETE ROAD OF LEFT EMBANKMENT ATP OF RIVER DARAKESWAR FOR A LENGTH OF 780M IN BETWEEN CH. 4.15KM TO 5.70KM and INCLUDIND RESETING OF BRICK and BOULDER PI
Flood protection and mitigation work for reducing vulnerability of people by Restoration of Left Embankment including Inspection Path of River Darakeswar A.T.P From 5.75 Km to 6.55 Km. Near Rail Bridge for a total length of 800.00m Within Arambagh M
Urgent flood protection and mitigation work over Left Ex Zamindary Embankment of River Jhumi Darakeswar near Jana Para for a length of 45.00 m to reduce vulnerability of people due to very heavy rainfall and high discharge at Mouza Baganala Block
Flood protection and mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon kotal from 17.04.22 to 19.04.22 in between Ch. 9.660 km. to Ch. 9.688 km for a length of 28.00 m.
Flood Protection and mitigation work for reducing vulnerability of people by restoration of Right ExZamindary Embankment of river Darakeswar from ch 5.07km to 5.16 km Near Hanagora for a length of 90 m G.P Thakuranichak Block Khanakul I District H
Flood protection and mitigation work for reducing vulnerability of people by restoration of Inspection Path to the Left Embankment of River Darakeswar for a length of 1120 m from LALERDANGA TO RAGHUNATHPUR PANJAPARA From Ch. 22.65 Km. to Ch. 23.77 K
Flood Protection and mitigation work for reducing vulnerability of people by restoration of Left Embankment of river Darakeswar in between, Ch. 7.00 km to Ch. 8.60 km Talpukur to Girjatala for a length of 1600 m within Arambagh Municipality and Sal
Flood protection and mitigation work for reducimg vulnerability of area due to damaged of Sundarban Embankment effected during full moon kotal from 17.04.2022 to 19.04.2022 inbetween ch.26.540 km and ch.26.84 km. for a length of 300.00m at Chemaguri
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 7.536 KM. to 7.626 KM. for a length of 90.00 Mtr. at Balipur Kalitala G.P. Balipur Block Khanakul I D
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.5.570 km. to Ch. 5.670 km for a
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EMBANKMENT OF RIVER DARAKESWAR FOR A LENGTH OF 280M AT NEAR MANIKPAT RLI BERAPARA FROM CH. 15.40 TO 15.68 KM G.P. SALEPUR I BLOCK ARAMBAGH DIST. HOOGH
Flood protection and mitigation work and reducing vulnerability of people,for permanent closure of breach occured over Left Ex-Zamindary Embankment of Jarura Khal for a length of 30 Meter near Simultala Sluice at Mouza-Nandapura in Block and PS-Saba
Urgent flood protection and mitigation work by repairing slip in between Biharichak Sluice to 10Vent Sluice on L Embankment of Bhosra Khal for 200M due to rainfall and high discharge from15.07.25 to 18.07.25 at Mouza-Chak Prayag in Block-Debra
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during Cyclone JAWAD on 05.12.2021 from Ch.3.000 km. to Ch. 3.310 km for a length of 310.00 m. at Mouza - Uttar Narayanganj facin
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment including Inspection Path of river Sankari Jhumi In between ch 9.550 km to10.150 km at Balidanga for a total length of 600 m within G.
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EXZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 180M AT JAGATPUR RLI 4 FROM CH. 8.40KM TO 8.58KM G.P. JAGATPUR BLOCK KHANAKUL II DIST. HOO
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during cyclone, JAWAD on 05.12.2021 for a length of 550.00 m. near Sudhan Das houses kheya ghat at Mouza - Mousuni east along riv
Flood protection and mitigation work on left embankment of river New Cossye damaged due to heavy to very heavy rainfall from 28.07.2021 to 30.07.2021 near PHE pump house for a length of 31 m in Mouza Tilandapur within Panskura Municipality
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during cyclone JAWAD on 05.12.2021 from Ch.3.850 km. to Ch. 3.950 km for a length of 100 m. at Mouza - Harekrishnapur facing riv
Urgent flood protection and mitigation work by repairing slip of R Embankment of River Cossye TE1H1 at ch.24.5Km for length of 90M occurred due to rainfall and discharge during the period from 15.07.25 to 18.07.25 at Mouza.Shaldhori in Block Debra
Flood protection and mitigation work for reducing vulnerability of people by strengthening of Left Embankment of River Darakeswar for a length of 1200.00 meter at Dharakundu to Ghasua in between Ch. 18.00 Km to 19.200 Km Within G.P.- Salepur-II
Flood Protection and mitigation work for reducing vulnerability of people for Subsidence Slope failure to Left Embankment of Debi khal near house of Sachin Jana for a length of 25.00. meter by using EUC bullah pilling at Mouza -Dubrjpur, Block
Flood Protection and mitigation work for reducing vulnerability of people by making Final closure at two nos breaches left and right embankment of Maja Damodar Khal for a total length 60.00 Mtr. at Jhamtia and Kasmoli, Block-Amta-II, District- How.
Flood Protection and mitigation work for reducing vulnerability of people for Subsidence Slope failure to Left Embankment of Debi khal near house of Tapan Bhakta for a length of 16.00. meter by using EUC bullah pilling at Mouza -Dubrjpur, Block
Flood Protection and mitigation work for reducing vulnerability of people by making Final closure at breach point on River side Panchaet ring bundh for a length of 40.00 Mtr. of Hurhura left flood embankment. Mouza-Solbhaga G.P- G.B Chitnan, Block
Urgent flood protection and mitigation work by sevear slip (150.00 M length) repair and Strengthening (150.00 M) over Ex-Zamindary Embankment (L/S) of river Shilabati near house of Bimal Puilla to reduce vulnerability of people due to very heavy rai
Flood Protection and mitigation work for reducing vulnerability of people by restoration of Left ExZamindary Embankment of river Darakeswar from ch 0.675 km to 0.895 km 200 M Near barobabar Mandir and from ch 1.77km to 1.97km 200M Near Roypuku and
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during cyclone JAWAD on 05.12.2021 from Ch.16.00 km. to Ch. 16.145 km for a length of 145 m. at Mouza - Durganagar facing river
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.0.700 km. to Ch. 0.890 km for a
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.0.450 km. to Ch. 0.590 km for a
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of Upper Harinakhali Khal from 13.470 KM. to 13.545 KM. for a length of 75.00 Mtr at Harua G.P. Chiladangi Block Pursurah Dist
Flood protection and mitigation work for reducing vulnerability of people by making Permanent closure at breach point of Right Embankment of River Darakeswar for a length of 50 m at Dighra Roypara G.P Bali Block Goghat I P.S. Goghat Dist. Hooghly.
Flood Protection and mitigation work for reducing vulnerability of people by restoring damaged CC Embankment in between Ch 68.00 Km to Ch 71.50 Km at Mouza Murshid nagar Rasikgang Nimtala in Block Daspur I PS Daspur and Dist Paschim Medinipur
Flood Protection and mitigation work for reducing vulnerability of people for Subsidence Slope failure to Left Embankment of Debi khal near house of Debasis Barman for a length of 30.00. meter by using EUC bullah pilling at Mouza -Dubrjpur, Block
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.22 to 19.04.22 damagd brick block pitching inbetween Ch.3.70 km to 3.90 km for a length of 15
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.8.550 km. to Ch. 8.650 km for a
Emergent flood protection and mitigation work on Rup Right Schedule D embankment damaged due to high tide on 14.08.2022 for a length of 160 m near house of Tarun Kuilya at Mouza Bar Amritberia Block Mahisadal under East Midnapore Division
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.6.200 km. to Ch. 6.362 km for a
Flood protection and Mitigation work for reducing vulnerability of people due to damage of embankment occurred during Purnima Kotal from Rati Mistri to Sujit Mondal house at m/Kalidaspur facing R/b of r/Sarsa in Block and P.S. Gosaba.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 4.092 KM. to 4.168 KM. for a length of 76.00 Mtr. at Digruighat Manasa Mandir G.P Shyampur Block Pursu
Flood protection and mitigation work and reducing vulnerability of people by restoration of Right Ex Zamindari embankment of River Mundeswari from 6.825 Km. to 6.945 Km. for a length of 120.00 Mtr. at Paschim Durgapur High School G.P. Tantishal Bl
Flood protection and mitigation work for reducimg vulnerability of area due to damaged of Sundarban Embankment effected during full moon kotal from 17.04.2022 to 19.04.2022 inbetween ch.26.540 km and ch.26.84 km. for a length of 300.00m at Chemaguri
Flood protection and mitigation work for reducing vulnerability of areas due to damaged of Sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch. 28.610 km to 28.850 km for a length of 240 m at Mouza Brajaballavp
Flood protection and mitigation work for reducing vulnerability of people by strengthening of Shaikpur Circuit Embankment of River Darakeswar within Mahisgot Bhukta para and Mahisgot Senapati para for a length of 150 m in between 4.20 km to 4.35 k
Flood protection and mitigation work for reducing vulnerability of puple due to damage of Sundarban embankment affected during Cyclone JAWAD on 05/12/2021 For a length of 297.00 m near Frezerganj Coastal Police station along Bay of Bengal and 150
Flood Protection and mitigation work for reducing vulnerability of people by Restoration of Left side of Ex-Zamindari Embankment, River Rupnarayan from 0.000 Km to 0.145 Km for a length of 145 m at Bandar Jelepara ( Kalitala) G.P. Dhannyaghori, Block
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 near Sitarampur AILA from ch. 5.670 km to 5.880 km for a length of 210 m
Flood protection and mitigation work for reducing vulnerability of people by making Permanent closure at breach point of Right Embankment of River Darakeswar for a length of 50 m at Dighra Nilkuti G.P Bali Block Goghat I P.S. Goghat Dist. Hooghly.
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EXZAMINDARI EMBANKMENT OF RIVER DARAKESWAR FOR A LENGTH OF 60M AT MAJHIPARA FROM CH. 11.32 KM TO 11.38 KM G.P. DHANNYAGHORI BLOCK KHANAKUL II DIST. HOO
Flood protection and mitigation work for reducing vulnerability of areas due to damaged of Sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch. 0.700 km to 0.720 km and Ch. 0.450 Km. to Ch. 0.610 km.