Loading…
Loading…
8,506 results • Best match
Flood protection and mitigation work for reducing vulnerability of people due to damages of Sundarban Embankment affected during New Moon Spring Tide from 07/09/21 to 08/09/21 synchronized with Easternly wind from Ch. 7.50 Km to Ch. 7.650 Km. for a l
Flood protection and mitigation work for reducing vulnerability of people due to damages of Sundarban Embankment affected during New Moon Spring Tide from 07/09/21 to 08/09/21 synchronized with Easternly wind from Ch. 14.30 Km to Ch. 14.55 Km. for a
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment of river Darakeswar from ch 2.670 km to 2.945 km 275 m at Bali Simultala to Purbapara and from ch 4.665 km to 4.90 km 235 m at Jagatpur Berap
Flood Protection and mitigation work for reducing vulnerability of people by restoration of Left Ex Zamindary Embankment of river Darakeswar from Ch. 4.615 km to 4.745 km 130 M Near Patrapara from Ch. 5.07 km to 5.19 km 120 M Near Ranapara from Ch.
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment of river Sankari from ch 5.250 km to 5.450 km 220 m at Jagatpur Panditpara to Trimohani ferighat and from ch 6.35km to 6.75 km 400 m at Jagat
Flood protection and mitigation work for reducing vulnerability of people by restoration of Inspection path of left embankment of river Darakeswar from Helipad to B.K. nursury gate on ATP from Ch. 2.90 Km. to Ch. 3.30 Km. for a length of 400 mtr. wit
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment of river Sankari Jhumi from ch 8.30 km to 8.50 km 200 m at Damodarpur Mondalpara and from ch 9.20 km to 9.40 km 200 m at Komra Ghoshpara fo
Flood protection and mitigation work for reducing vulnerability of people due to damages of Sundarban Embankment affected during New Moon Spring Tide from 07/09/21 to 08/09/21 synchronized with Easternly wind from Ch. 19.20 Km to Ch. 19.57 Km. for a
Flood protection and mitigation work for reducing vulnerability of people due to damages of Sundarban Embankment affected during New Moon Spring Tide from 07/09/21 to 08/09/21 synchronized with Easternly wind from Ch. 7.30 Km to Ch. 7.45 Km. for a le
Flood protection and mitigation work for reducing vulnerability of people due to damages of Sundarban Embankment affected during New Moon Spring Tide from 07/09/21 to 08/09/21 synchronized with Easternly wind from Ch. 5.30 Km to Ch. 5.60 Km. for a le
Raising and strengthening of Pond embankment with protection by Tali Piling with Earth work of Majed Ali pond side at Hansia Under Deganga-I Gram Panchayat ID-40066503
Supply of materials for Bamboo pilling for Construction of earthen embankment from Colony to Shyamlal Sannyasi Mora Raidhak River within Barokodali-II GP, Under Tufanganj-II Block
Supply of different materials for construction of Boulder Pitched Embankment from the land of MihirjamalMiah Under Bara Atiabari II GP within Dinatha I PS AAP NO 080502011808
Excavation of Alampur Water Detention Structure WDS including Construction Embankment Inlet outlet at Mouza Alampur JL107 in Block Bamongola under WBADMI Project in the District of Malda
Supply of different materials for strengthing embankment for Sudhir Das house to Habibar Miah house near Dharola river under Putimari-II GP within DinahtaI PS AAP No080516021609
CIVIL WORK- a) CONST OF COMMUNITY SHED AT GOPALPUR SHIB MANDIR b) EMBANKMENT OF MURIKHAL FROM KANAIRANA HOUSE TO RAMESWAR SAREN HOUSE AT GOPALPUR NATUN ADIBASI PARA
STRENGTHENING OF EMBANKMENT BY PILLING IN FRONT OF HEMKANT HOUSE, AT WARD NO-11 (BOOTH NO-162) SCHEME ID -APAS/01/075/161/0007 WITHIN DOMKAL MUNICIPALITY
EMBANKMENT OF POND FROM BAHALIA LAXMINDRA ROUTH HOUSE TO ANUP AICH HOUSE AND CONSTRUCTION OF CONCRETE ROAD CHAITANYA ROUTH HOUSE TO UTTAM SEN HOUSE BESIDE THIS POND
Supply of Different Materials of for strength embankment for Swapan Sutrachar to Krishna Barman under Putimari-I GP within Dinahta-I Dev. Block and APP No. 080516031601
Maintenance of existing embankment and Construction of Pucca Drain from H/O Sapan Mandal to River Site at Madari VI, Under Minakhan Gram panchayat ,Minakhan DEV,Block
STRENGTHENING OF EMBANKMENT BY PILLING INFRONT OF ASAN SK PUKURPAR AT WARD NO-03 (BOOTH NO- 02) SCHEME ID - APAS/01/075/2/0002 WITHIN DOMKAL MUNICIPALITY
Crossing of underground rising main pipe line along embankment of LMBC through congested slum area Ochiven Pally from Chain age 3.32 KM(approx.) to 3.09 KM(Approx.)
Supply of materials for Bamboo pilling for Construction of earthen embankment from house of Abed Ali to Chhaiyad Ali within Barokodali-II GP, Under Tufanganj-II Block
Construction of Approach PCC Road and Concrete Block Parking Area with Earthen Embankment for U-H and WC at Mahananda Pally, Ward No. - 22 within Englishbazar Municipality.
Crossing of underground rising main pipe line along embankment of LMBC through congested slum area Ochiven Pally from Chain age 3.78 KM(approx.) to 3.55 KM(Approx.)
Supply of materials for Bamboo pilling for Construction of earthen embankment from house of Joydeb Barman to Bisram Ghar via Kader Ali within Under Tufanganj-II Block
Creation with One Year Maintenance of Embankment Plantation near Laxmi Babur Bhery Kestopur Canal Side, Bamanghata Gram Panchayat within EKW Area under NCAP Scheme over 10 KM
Supply of materials for Bamboo pilling for Construction of earthen embankment from the Bagan of Premananda Das to Chamta Border via Baga within Under Tufanganj-II Block
Construction of PCC Road with Embankment Protection Wall from the house of Shankar Das towards near the house of Khilari Thakur at Sansad-DTK-XXVI, Mouja- Duttapukur
Repairing of Concrete Road from River Embankment towards house of Tapasi Singh, Mouza Uttar Battala JL 131 Ben Benefitted 450 Nos Len 90 M App Rs. 200000
CONSTRUCTION OF CONCRETE ROAD FROM NARAYAN SING HOUSE TO RIVER EMBANKMENT (MEURIPARA) MOUZA- RAJPURA,JLNO-479,PLOT NO-115,LENGTH-100 MTR APAS/01/227/2/0004
Providing embankment, cutting earth drain, cleaning garbage and bush at lncline no 1, lncline no 2 and lncline no 3 of Patmohana Colliery under BMP group,SDPA
Improvement of road with Interlocking Concrete Block Pavements (ICBP) with CC Drain from Pakurtola more to Teesta Embankment in ward no 2 under Jalpaiguri Municipality. (Lot-02)
Construction of Guard wall with pucca drain at pond embankment of Sahoo Para Kali Temple at Lalpur Sansad (Activity Code 114236340) XV FC- Tied Fund (2025-26)
Cutting of Branch for Singaron Jore Including Rubble Masonry Wall and Heightening of Embankment at Kondakulli of Quarry No. 02 of New Kenda OCP under Kenda Area
Breech Closing of Earthen Embankment at Mouza-Shiorboni near Siorboni Pick-Up weir of Jirapara Gram Panchayat Under Garhbeta-II Panchayat Samity, in the District Paschim Medinipur.
SUPPLY OF MATERIALS FOR BAMBOO PILLING , STRANGTHENING OF EARTHEN EMBANKMENT WITH FROM THE HOUSE NITAI DEBNATH TO THE HOUSE OF KURAN SAHA VIA LAND OF DHALU PANDIT
Supply of different materials for strengthing embankment for Biren Das house to Krishna Das house near Dharola river under Putimari-II GP within DinahtaI PS AAP No080516021605
Garidhura-Mirik-Simanabusty Road, Restoration work for Raincut damaged of road flank and embankment occurred due to heavy rain at Ch. 31.10 Km and Ch. 31.20 Km under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Improvement of Milanpally bank protection work from Ch1.20 km to Ch2.10 km (length 900 M) and Biren Basty embankment from Ch. 0.00 km to Ch.0.95 km (length 950 M) along right bank of river Teesta within Block Rajganj,PS-Bhorer Aalo,Dist-Jalpaiguri
M/R to damaged Sundarban Embankment (toe and bank protection) by dumping of earth filled poly bags in nylon crate at Mouza Birajnagar from 4.65 km. to 4.74 km. facing right bank of river Durgaduani in Block and P.S. Gosaba, Dist. South 24 Parganas.
Bank protection work at various places on the Right bank of River Mahananda and MR to Sambalpur Circuit embankment in between Ch 5.20 Km to 6.00 Km for a total length of 100 m at G.P Maharajpur , Block-Ratua-II, P.S.-Pukhuria, Dist.-Malda
Road bank protection and repairing work at different place under GP area Supply of Material Only
RENOVATION OF POND ALONG WITH BANK PROTECTION AT NEW TOLLGUNGE NORTH IN WARD-114 BR-XI
BANK PROTECTION BY BULLAH PILLING AT 2NOSREE COLONY SANTAR PUKUR IN WARD NO 99, BR-X
River Bank Protection Work at Right Bank of Jaldhaka River at Bindu Bazar in P.S. Jhalung.
River Bank Protection Work at Both Banks of Gairibas Khola near Rangbari Area in P.S. Jhalung.
River Bank protection work at Left Bank of Laitey Khola under Yangmakum G.P. in P.S. Kalimpong
Field Work for the Bank Protection Study including Geotechnical Investigation and Preparation of Soil Exploration Report
Construction of Retaining walls for River bank protection and allied works at Baidyabati, Hooghly (2nd call).