Loading…
Loading…
8,505 results • Best match
Flood protection and mitigation work to reduce vulnerability of people by Restoration of slip/slope failures over Right Ex-Zamindary Embankment of Banskona Khal for a length of 60 Meter at river side in between house of Kanai Bera and Pranabesh Bera
Flood protection and Mitigation work for reducing vulnerability of people due to damage of embankment occurred during Purnima Kotal from H/o Kartik Mondal to Paritosh for 375 mtr at m/Kalidaspur facing R/b of r/Kapura in Block and P.S. Gosaba.
Flood protection and mitigation work for reducing vulnerability of areas due to damaged of Sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch. 4.600 km to 4.060 km for a length of 460 m for making ring bandh
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment including Inspection Path of river Sankari Jhumi from ch 10.20 km to 10.83 km at soai for a total length of 630 m within G.P Bali Block
Flood protection and mitigation work for reducing vulnerability of people by Restoration of Right Embankment of River Mundeswari From 3.30 Km to 3.58 Km for a length of 280 m at Mandarchak RLI G.P. Natibpur II Block Khanakul II P.S. Khanakul Dist
Flood Protection and mitigation work for reducing vulnerability of people by making Final closure of initial closure at breach point on River side Panchaet ring bundh of Hurhura left flood embankment for a length of 20.00 Mtr. near Das Para. Mouza-T
Flood protection and mitigation work for reducing vulnerability of people due to damages of Sundarban Embankment affected during New Moon Spring Tide from 07/09/21 to 08/09/21 synchronized with Easternly wind from Ch. 10.700 Km to Ch. 11.000 Km. for
Flood Protection and mitigation work for reducing vulnerability of people by restoration of slip / subsidence failure to Right Ex-Zamindary Embankment(R/S) of Amrakhali Khal near Manmath Barman House for a length of 25 M occurred due to very heary ra
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch. 2.505 km. to Ch. 2.895 km for a length of 390 m. at Mouza - Bagdanga
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.5.650 km. to Ch. 5.780 km for a length of 130 m. at Mouza -Patibunia
Flood protection and mitigation work on right embankment of Kharichak Khal damaged due to heavy to very heavy rainfall from 28.07.2021 to 30.07.2021 near house of Mahadeb Sau, Ajay Maji and Purno Singh for a length of 80 m in Mouza Arror
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment of river Sankari from ch.5.77 km to 5.92 km for a length of 150 m at Jagatpur Swasan Ghat to Radhaballavpur Shibmondir G.P. Bali Block G
Flood protection and mitigation work for reducing vulnerability of people by Restoration of Left Embankment including Inspection Path of River Darakeswar A.T.P From 1.20 Km to 1.30 580 Near Balikhad and from 1.75 km to 1.85 km 100M Near B.K Roy Polt
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during cyclone JAWAD on 05.12.2021 from Ch.34.10 km. to Ch. 34.325 km for a length of 225 m. at Mouza - Nadavanga facing river M
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment including Inspection Path of river Sankari Jhumi from ch 10.20 km to 10.83 km at soai for a total length of 630 m within G.P Bali Block
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment of river Darakeswar from ch.3.05 km to 3.40km for a length of 350 m at Bali Jelepara to Dr. Prankrishnas chamber within G.P. Bali Block Go
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.6.00 km. to Ch. 6.15 km for a length of 150 m. at Mouza -Patibunia
Flood Protection and mitigation work and reducing vulnerability of people at Different streches of Damodar Right embankment from 7.850 KM. to 7.980 KM. for a length of 130.00 Mtr. near Bhangamora ICDS Centre from 9.075 KM. to 9.258 KM. for a length
Flood protection and mitigation work for reducing vulnerability of people by restoration of Inspection Path to the Left Embankment of River Rupnarayan for a length of 500 m from Dhyannagori Samantapara to Swasmalpara from Ch 3.00 Km to Ch. 3.50 Km w
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during Cyclone JAWAD on 05.12.2021 from Ch.1.000 km. to Ch. 1.135 km for a length of 135.00 m. at Mouza - Namkhana facing river H
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment of river Darakeswar from from ch 1.45 km to 1.92 km Digra Majipara to Natunbazar for a total length of 470 m within G.P Bali Block Goghat
Flood protection and mitigation work for reducing vulnerability of people by making Restoration of Right Embankment of River Mundeswari From 2.20 Km to 2.47 Km for a length of 270 m at Bouripara RLI G.P. Natibpur II Block Khanakul II P.S. Khanakul D
Flood Protection and mitigation work and reducing vulnerability of people at Different streches of Damodar Right embankment from 19.808 KM. to 19.940 KM. for a length of 82.00 Mtr. at Pursurah Mukherjee Para from 25.640 KM. to 25.902 KM. for a len
Flood Protection and mitigation work to Alleviate vulnerablity of people due to damage of Embankment occured on 18.07.23 in between 11.65 km to 11.90 km at M/Kumirmari facing L/B of R/Sarsa in Block - Gosaba ,P.S.-Chotomollakhali Coastal ,U/JID .
Flood protection and mitigation work for reducing vulnerability of areas due to damaged of Sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch. 3.00 km to 3.500 km for a length of 500 m at Mouza Gobindapur Abad
Urgent flood protection and mitigation work for slip (150.00 M length) repair over Ex-Zamindary Embankment (R/S) of river Darakeswar near L N High School to reduce vulnerability of people due to very heavy rainfall and high discharge from 29/07/21
Flood protection and mitigation work for reducing vulnerability of people due to damages of Sundarban Embankment affected during New Moon Spring Tide from 07/09/21 to 08/09/21 synchronized with Easternly wind from Ch. 10.400 Km to Ch. 10.800 Km. for
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment of river Sankari from ch.5.50 km to 5.70km for a length of 200 m at Jagatpur Pry. school to Muchivita G.P. Bali Block Goghat I Distric
Flood Protection and mitigation work and reducing vulnerability of people at Different streches of Damodar Right embankment from 14.770 KM. to 15.020 KM. for a length of 250.00 Mtr. at Deulpara Mannapara from 16.560 KM. to 16.711 KM. for a length o
Flood protection and mitigation work for reducing vulnerability of people by restoration of Inspection Path to the Left Embankment of River Darakeswar for a length of 750 m from Ramnagar Bundh to Salepur RLI From Ch. 10.80 Km. to Ch. 11.55 Km. withi
Flood Protection and Mitigation work due to damage of embankment occurred during SCS SITRANG on 24.10.2022 in between Ch. 20.05 Km. to 20.45 Km. at m/Lahiripur facing l/b of r/Rangabelia, Block- Gosaba, P.S.- Chotomollakhali Coastal, Dist.- S 24 Pgs
Flood protection and mitigation work for reducing vulnerability of people by making Permanent closure at breach point of Left Embankment of River Darakeswar From 2.71 Km to 2.74 Km for a length of 30 m at Doulatpur Sheed farm Within Arambagh Municipa
Urgent flood protection and mitigation work by slip (270.00 M length) repair over Ex-Zamindary Embankment (L/S) of river Shilabati inbetween RLI to house of Basu Kotal and house of Sukumar Kar to Club, to reduce vulnerability of people due to very
Flood protection and mitigation work to reduce vulnerability of people by Restoration of 1 (one) number slip/slope failures over Right Ex-Zamindary Embankment of Amrakhali Khal for a length of 30 Meter at river side at Bishnupur bazar occured due to
Flood protection and mitigation work for reducing vulnerability of people by strengthening of Left Ex Zamindari Embankment of River Darakeswar from 0.60 Km to 0.67 Km for a length of 70 m at Raghunathpur Aadak Para G.P. Ghoshpur Block Khankul I P.S
Flood Protection and mitigation work for reducing vulnerability of people by Restoration of Left side of Ex-Zamindari Embankment, River Rupnarayan from 0.280 Km to 0.430 Km for a length of 150 m also ditch portion porquepine of 125 m at Bandar Je
Flood Protection and mitigation work for reducing vulnerability of people by restoration of right embankment including Inspection Path of river Sankari Jhumi from ch 10.20 km to 10.83 km at soai for a total length of 630 m within G.P Bali Block
Flood protection and mitigation work for reducing vulnerability of people by making Permanent closure at breach point of Left Embankment of River Darakeswar From 17.90 Km to 17.97 Km for a length of 70 m at Daharkundu Bera Para G.P. Salepur II Bloc
Flood Protection and Mitigation work due to damage of embankment occurred during SCS SITRANG on 24.10.2022 in between Ch. 40.50 Km. to 40.70 km. at m/ Kachukhali facing l/b of r/Bidya, Block and P.S.- Gosaba, Dist.- South 24 Pgs under JID.
Flood protection and mitigation work to reduce vulnerability of people by Restoration of 1 (one) number slip/slope failures over Left Ex-Zamindary Embankment of Ganapath Khal for a length of 40 Meter at river side near house of Dulal Ghorai occured d
Flood Damaged Repairing of Road T06 - Saparda (Package No WB-03-206) under Chhatna Block
Flood Damaged restoration work of the Road from T03-Mongalpur to Palashi under Indus Block
Flood Damaged restoration work of the Road from L025-Poalgere to Jamuna under Kotulpur Block
Flood Damaged restoration work of the Road from Hatitola - Vettia - Somsar -Roll under Indus Block
Flood Damaged Repairing of Road L024 - Gidhuria (Package No.-WB-03-203) under Chhatna Block.
Flood Damaged restoration work of the Road from T10-Chaltaknda to ODR under Joypur Block
Emergency restoration of flood affected road namely L032-Gujrath Gomti Gora to Chunga Danga Rana Para also known as Chaudanga to Adhikaripara WB 08 ADB 194 A
Maintenance of existing embankment and Construction of P.C.C. Pavement from Purano Jame Masjid to H/O Goffer Molla with Pilling at Balihati V Under Minakhan gp, Minakhan DEV. BLOCK
M/R to damaged Sundarban Embankment by toe and bank protection in between 0.00 km. to 0.070 km. along the Right Bank of river Hogol at mouza Ramchandrakhali in Block and P.S. Basanti, Dist. South 24 Parganas under Joynagar (I) Division (2nd Call).
Toe and bank protection and mitigation work due to damage of embankment occurred during Amabashya kotal in between Ch. 3.90 Km. to 4.10 Km. at m/ Kalidaspur facing r/b of r/ Kapura, Block- Gosaba, P.S.- Chotomollakhali Coastal, Dist.- South 24 Pgs.