Loading…
Loading…
8,507 results • Best match
Repairing and Painting to the Boundary wall of Office premieess of the Mahananda Embankment Sub-Division Harishchandrapur, Malda
Maintenance and Repair to bank protection of river Hooghly near out fall of Budge Budge Balughat sluice for a length of 75.00 m, Mouza Badekalinagar, within ward no 16 of Budge Budge Municipality, P.S Budge Budge Dist- South 24 Pgs. during the year
Emergent bank protection at upstream side of R.C.C. Bridge (Ch. 6500.00 m) near the house of Kachi Mistry from Ch. 6410.00 m to Ch. 6440.00 m at Right bank of Charial Diversion Khal within Pujali Municipality, P.S. Pujali, Dist. South 24 Parganas
Bank Protection work at down stream of L.R.P Bridge at Paschim Chakchaka area along the right bank of river Raidak-II for a length of 1500 M in mouza Paschim Chakchaka under KamakhyaguriI GP in Block and PS Kumargram,Dist. Alipurduar underRIDFXXV
Bank protection to the right bank of river Mahananda at Harirampur Length-870.00 m , at Kuchila Length 310.00 m and at Mujibur Rahamanpara near Raninagar Length 450.00 for a total length of 1630.00 m in Block Ratua II, PS Pukhuria, Dist Malda
Extension of Bank Protection work along right bank of river Sankosh for a length of 750 m at the D/S of Existing Protection Work at Bittibari Area in Mouza-Madhya Haldibari under Kumargram GP in Block and PS- Kumargram, Dist-Alipurduar
Re-excavation of old Monikhali khal by means of pontoon mounted excavator from DD-1 khal to outfall at Hooghly river (Length 5045 M) including bank protection works within Ward No. 8, 17, 18, 19 of Maheshtala Municipality, Dist - South 24 Pgs
Permanent Road Restoration Works of the Road, Damaged due to Laying of 600 mm dia DI/MS Water Supply Pumping Main and Shifting of the existing Water Line Drainage including Bank Protection Work of the Road Side Ponds from Boalia Paschim Kalibar
Re-excavation of Defunct Monikhali Khal from ch.0.00 m to ch.590.00 m and Parnashree Khal from ch.0.00 m to ch. 370.00 m by means of pontoon mounted excavator along with bank protection of Defunct Monikhali Khal on both banks
Maintenance and Repair to bank protection of river Hooghly in Between Garments park and Kalipur Ashok club for a length of 100.00 m, Mouza Jaychandipur, within ward no 5 of Budge Budge Municipality, P.S Budge Budge Dist- South 24 Pgs. during the year
Eroded bank protection to the the R/B of river Damodar for a length of 330 m at Mouza- Beshia in Block and P.S-Sonamukhi ,Dist- Bankura under Amarkanan Irrigation Sub Division within Damodar Canal Division during the year 2026-27 (2nd Call).
Bank Protection by bullah piling from Ch.0.00 M to Ch. 215.00 M and renovation of adjacent road for a length of 65 m along the left bank of New Moni Khali Khal near Zinzira Bazar within Mahestala Municipality, Dist- South 24 Parganas.
Bank Protection work on Right bank of river Mahananda in between HO Lutfur to HO Samrul and from HO Wasta to downwards for a total length of 70 m at village Ellahabad in Maharajpur G.P in P.S.-Pukhuria, Block-Ratua-II, Dist- Malda
1CC Road from Basudeb Paik house to Gopal Chakraborty house at DHANDALI 2Construction of CC Road from Pareshnath Dolui house to Pradip Bhoumik House3CC road from Burning ghat to Coloney Culvert in Dhandali
Urgent protection and repair of damaged embankment for a length of 100 m from Ch.27.00 Km to Ch.27.10 Km of M.C Embankment,R/B of river Palaspai due to damage caused by Severe cyclonic Storm YAAS at mouza- Gobindanagar in G.P. Nandanpur-II,
MR along with Oiling Greasing replacing of rubber seal of 16 No Sluices in different places over L and R Ex Zam Embankment of Kalimonop Khal L Ex Zam Emb of Debi Khal and Kaliaghai Left Embankment in btn Mouzas Kerur Nimki Mohar Uttar Nimkimahar
M/R to Chel Kumlai avulsion preventing embankment for a length of 3.0km on the L/B of river Chel and Mal town Protective embankment for a length of 0.9km on the R/B of river Mal in P.S. and Block-Mal, Dist.-Jalpaiguri.
Restoration of 2 (two) number slip/slope failures over Right Embankment of Deuli river for a length of 50 Meter at country side near Bangaldari Sluice and a length of 16 Meter at country side near house of Sukhchand Mondal over Left Embankment of Kal
FPM for Damodar Right Embankment from Begho Hana to Sajhmntala for a length of 7.00 K.M and Mundeswari Left Embankment from 00.00 k.m to 7.00 k.m for the period from June 2025 to October 2025 of Kanla Hd Qtr Section under JISD of LDID
Restoration of subsidence of embankment cum inspection path adjacent to 6 vent sluice for a length of 11 mtr along with protection work for a length of 17 mtr at Matla tagging embankment at Dabu Irrigation Campus in vill Dabu under GP Nikarighata in
Construction of Dwarf Embankment along Chetua Circuit (CC) Embankment of River Shilabati, Old Cossye, Kanki, Palaspai Rupnarayan River from Ch. 1.00 km to ch. 1.900 km, Ch. 3.600 km to 6.000 km, Ch. 6.600 km to 6.850 km, Ch. 20.900 km to 21.550 k
I/R to flood protection and mitigation work for reducing vulnerabilities of people due to damages 01 No.Single vent 90 cm. dia. Hume pipe sluice u/s of Moni closer river of Moni at Mouza Radha Kantapur, Raidighi (I) Sub-Division under JID (2nd Call)
Urgent flood protection and mitigation work by repairing slip in at Ch13.8 km on R Bank of Old Cossye TE2H2 for length of 75 M due to rainfall, discharge during the period from 18.06.25 to 21.06.25 at Mouza Tituan in Block Debra, P.S Debra
Flood protection and mitigation work due to Purnima Kotal from 03.06.2023 to 07.06.2023 in between 6.900 Km to 7.025 Km, 8.525 Km to 8.700 Km, 9.725 Km to 9.800 Km at mouza Kalidaspur facing right bank of river Sarsa in Block Gosaba, PS- Ch Coastal.
Flood Protection and mitigation work due to damages of S/E Ch.5.20 Km. to 5.40Km, Ch.8.50 Km. to Ch. 8.90Km and Ch.2.80 Km. to Ch. 3.00 Km at M/Kaikhali and Kantamari facing R/Nabipukur and Matla Block- Kultali and P.S- Kultali
Flood Protection and mitigation work to Alleviate vulnerability of people due to damage occured on 19.07.23 from 45.10 km to 45.15 km and from 45.35 to 45.45 km at M/Birinchibari facing R/B of R/Bidya in Block Basanti, P.S. Jharkhali Coastal, U/JID
Flood protection and Mitigation work and reducing vulnerabilities of people as a measure of emergent repairing of ghoghs (3 nos) in between 2.70 Km. and 2.85 Km. in M/ Dongajhora along river Matla in Block and PS Kultali, Dist.-(S) 24 Pgs under JID
Flood Protection and Mitigation Work damages to the S/E occured from dtd-17.06.2023 to 20.06.2023 in between 16.5 km to 16.7km near Mollar Mukh along the R/B R/Moni at M/Kumrapara, in G.P-Kumrapara U/Raidighi (I) Sub-Divn of JID
Flood Protection and Mitigation Work damages to the S/E occured from dtd-17.06.2023 to 20.06.2023 from 18.35 km to 18.49km for a length of 140.00 mtr facing R/B of R/Nukchora in M/Kailashpur, of GP - Nanadakumarpur, Block - Mathurapur II, Under JID
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left bank of Lower Harinakhali Khal from 7.260 KM. to 7.385 KM. for a length of 125.00 Mtr. at Arunda village from 6.320 KM. to 6.550 KM. for a length of 230
Urgent flood protection and mitigation work by repairing slip in between ch11 km to ch12.5 km on R Bank of Old Cossye TE2H2 for length of 60 M due to rainfall, discharge from 18.06.25 to 21.06.25 at Mouza Tinuan, Kamalpur, Mirjapur in Block Debra
Urgent flood protection and mitigation work by reapiring slip in between ch10 to ch 9 km on R bank of Old Cossye TE2H2 for length of 40 M due to rainfall discharge during period from 18.06.25 to 21.06.25 at Mouza Amdanagar, Bhimpur in Block Debra
Flood Protection and Mitigation work due to Purnima kotal from 03.06.22 to 07.06.22 at Mouza Uttardanga near Shraboni Sangha from 14.280 Km to 14.880 km for a length of 600.00 mtr along Right bank of river Bidya, Block and PS Gosaba, Dist. S 24 Pg
Urgent flood protection and mitigation work by repairing slip in between ch24.75 km to ch25.36 km on R Bank ofr New Cossye TE1H1 for length of 150 M due to rainfall, discharge during period from 16.07.25 to 18.07.25 at Mouza Shaldhori in Block Debra
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left bank of River Mundeswari in between 26.460 KM. to 26.550 KM. for a length of 75.00 Mtr. at Digruighat and from 26.957 KM. to 27.053 KM. for a length of
Urgent flood protection and mitigation work by repairing slip in between ch 0 to ch5.65 km on R Bank of Cossye TE1H1 for length of 100 M due to rainfall discharge from 15.07.25 to 18.07.25 at Mouza Akra, Raiso, Kuliara Markandapur Block Kharagpur-II
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left bank of Lower Harinakhali Khal from 9.275 KM. to 9.475 KM. for a length of 200.00 Mtr. at Par Chabbishpur and from 9.750 KM. to 10.100 KM. for a length
Flood protection and mitigation work for reducing vulnerability of people by strengthening of Shaikpur Circuit of River Darakeswar From Ch. 2.35 km to 2.68 km Near Kulat Maitypara and From Ch. 2.96 km to 3.28 Near Pal Para for a Total length of 665 m
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Right bank of Hurhura Khal in between 2.460 KM. to 2.600 KM. for a length of 130.00 Mtr. at Talgope Balpai G.P. Natibpur II in between 6.150 KM. to 6.300 KM
I/R to flood protection and mitigation work due to damages of embk. in between ch 18.10 km to ch 18.37 km facing R/B of R/Nukchora in M/Kailashpur in Block-Mathurapur-II,P.S-Raidighi under JID in the dist.of 24 Pgs(S)
Urgent flood protection mitigation work by slope protection on river side at Gopalpur (For a length of 175.00 m) of Right Bank of river Cossye to reduce vulnerability of people due to very heavy rainfall high discharge from13/09/21 to 18/09/21
Urgent flood protection and mitigation work by protection of river bank at L bank of New Cossye TE3H2 at Ch.22.3 Km for length of 175 M occurred due to rainfall discharge from 14.07.25 to 18.07.25 at Mouza Bishnupur, Block Debra, Dist Paschim Medini
Flood Protection and mitigation work due to heavy rainfall from 26.06.23 to 30.06.23 Purnima Kotal from 05.07.23 to 10.07.23 in between 12.00 km to 12.35 km at mouza Dayapur facing R B of river Sazna in Block PS- Sundarban costal ,Dist- South 24 Par
I/R to flood protection and mitigation work to damages of embk. in between ch 5.50 km to ch 5.75 km facing R/B of river Raidighi in mouza-Kumrapara Block-Mathurapur II,P.S-Raidighi under JID in the dst. of 24 Pgs(S)
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left bank of Upper Harinakhali Khal from 3.565 KM. to 3.605 KM. for a length of 40.00 Mtr. at Tokipur from 0.445 KM. to 0.605 KM. for a length of 160.00 Mtr.
Urgent flood protection and mitigation work by repairing slip at ch.4 km on R Embkt of Old Cossye TE2H2 for length of 50 M due to heavy rainfall and high discharge during period from 18.06.25to 21.06.25 at at Mouza Bhawanipur in Block Debra
Flood protection and Mitigation work and reducing vulnerabilities of people as a measure of emergent repairing of ghoghs (3 nos) in between 2.60 Km. and 2.80 Km. in M/ Balaharania along R/Nabipukur in Block and PS Kultali, Dist.- (S)24 Pgs under JID
Flood Protection and Mitigation work to alleviate vulnerability of people due to damaged S/E from 18/06/23 to 21/06/23 in betwn 0.80 km to 0.90 km in M/Radhaballavpur R/hogal in Block and P.S.-Basanti, U/JID. (2nd Call)
I/R to flood protection and mitigation work due to damages of emb. Occurred near Jhurur Taka(length165.00m in between ch.58.85K.M. to ch.59.05K.m)facing R/Mridangabhanga at M/ Kedarpur,Block and P.S Patharpratima under JID in the dist. of 24 Pgs(S)
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left bank of River Mundeswari in between 24.820 KM. to 25.000 KM. for a length of 130.00 Mtr. at Dhanpota from 20.185 KM. to 20.321 KM. for a length of 136.