PLEASE SEE THE TENDER DOCUMENTS AND NIT FOR WORK DETAILS
This estimate is prepared to construct a Pharmacy store and Dining room for patients and bystanders near Ward - 2. The provisions included in the estimate are Earth work, Brick work, Plastering, Painting, tiling, Aluminium works etc.
Demolishing brick work Solid block masonry Centering Shuttering RCC works Plastering Tiling Aluminium works for doors and windows Particle board work Providing MS hollow tube framework GI sheet work Painting False ceiling with calcium silicate tiles
REPAIRS OR REPLACEMENT TO FLOOR, ROOF PLASTER, SANITARY FITTINGS, JOINERY, TILING, ROAD, PATH, HARD STANDING, COMPUND WALL, FENCING SEWAGE, DRAIN AND WELCOME OR PERIODICAL SERVICES AT CGDHQ-4 KOCHI UNDER AGE B AND R (CG) KOCHI
Earth work excavation, PCC, RCC, RR masonry, Laterate masonry, Solid block masonry, wood work, MS grill, plastering, painting, Tiling, cladding, PVC door, Name board, Space frame(Ball Node Type), Poly carbonate sheet, Electrical and plumbing work
Earthwork excavation PCC RCC works Filling dept and contractors earth Laterate Solid block and RR masonry Plastering Painting Tiling work Aluminium works for doors and windows Fixing pre laminated particle board aluminium composite panel cladding etc
It is proposed to construct three toilets adjacent to the existing wash area.The main provisions included in the estimate are solid block work, tiling works, plumbing works, sanitory fittings, painting works, pvc door, septic tank etc.
AS PER BOQ AND TENDER DOCUMENT
BUILDING
Earthwork excavation,Ring Bund, Bailing out water, PCC for Abutmrent,Irish, canal Base, wing wall and tile side locking, M15 for abutment , Wing wall,M30 for slab and, m20 for bedblock,Parapet Tile locking , Steel Reinforcement, Tile work for appro
The Toilet block Buildingfor Boys and Girls roof Height 240 cm The building is proposed R C C Framed structure with R C C raft foundation, T beams, Grade Beam, solid block masonry for superstructure aluminium ventilator tile work urinal area
This estimate is proposed for the second Phase for a length of 800m from 2.200 to 3.000 Km The items proposed are Excavation for road work,GSB,M20concreting.Interlock tile work,berm strengthening,Provision for CC drains important road safety works
This proposal include 15cm GSB and 15 cm WMM including raising the existing road with WMM and road surfacing with 40mm close graded chipping carpet with a width of 4.m and tile work .Traffic safety items road markings, studs etc
Police quarters Fortkochi is constructed during the year 1976 There is 6 blocks of four storied building with 16 quarters in each block This estimate is prepared to paint the outside portion of the 6 blocks and tile work in steps
construction of new culvert, and CC Drain , widening work at narrow portions. Carriage way improvements works are, widening carriage way,Earth work , GSB 15cm thick, WMM 10cm thick ,50mm BM, 30mm BC, Tile work Temple compound, Irish drains oad safety
Items included in the estimate are earth work,pcc,solid block,cc,steel,rcc, filling earth, gisheet, painting,plastering, tile work plumbing man coolie, carpenter,al work ,frp door and shutter,lock,aldrop,rcc ring,cover slab , ,man hole etc.
The provisions included are dismantling old unused toilet Earth work for new toilet RCC Raft and beam for foundation RCC Roof slab toilet tile work fittings FRP doors plumbing works and also acid wash and fixing toilet fitting on office
It is proposed to construct up stair of the existing building and provide light roofing by G.I. sheet on steel truss work. The work includes Earthwork excavation, PCC, CC 1.2.4, Solid CC block masonry, Plastering, Painting ,vitrified tile work etc
Bottle trap, PPC Cement, Waterproofing compound, Latex, CPVC pipe 15 mm, CPVC pipe 20 mm, CPVC pipe 25 mm, CPVC fittings, Brass angle valve 15 mm, Brass stop cock, UPVC soil pipe 110 mm, UPVC waste pipe 75 mm, UPVC waste pipe 50 mm, UPVC fittings, ... Vitrified floor tiles , ... Vitrified wall tiles , ...
This estimate included in DR and RR masonry for Foundation and Basement , Brick work in Superstructure , painting , Electrification and flooring in rooms
The provision included in the estimate are PCC flooring, Matt finished tiles GI structural work and purlin and GI sheet roofing etc.
KLC Section 3 Urgent maintenance works of flooring cupboard repairing ,sanitary fittings etc in Room NO 703 Chandragiri block in MLA hostel
The proposed project involves Roofing maintenance, Painting, Flooring, False ceiling, Electrification and Plumbing works and other repairing works etc of Maniyarankudy campshed
The estimate is for the construction of conference hall with record room Main provisions included are side walls with concrete blocks, MS grills, plastering, sheeted roofing above record room, vitrified floor tiling, interlock in yard and passage
Demolishing PCC/Soling,Earth work excavation,R.R work,Shuttering and steel work for RCC,RCC/PCC work,Solid block Masonry and plastering,Vitrified /Ceramic tiling,Wood /uPVC Joinery works,Plumbing,sanitary works,Applying Priming coat,Electrical works
In this estimate provision for Solid block masonry side wall,Stage costruction,Floor tiling work,truss work with GI sheet roofing,inside false ceiling,plastering,painting etc is included. LS provision for electrification included in the estimate.
Clearing the site Earth work in excavation by mechanical means CC 1 4 8 Random rubble masonry Centering and shuttering RCC work Earth Filling Steel reinforcement for RCC work solid block masonry Plastering Work tiles Work
Building work
BUILDING MAINTENANCE
AS PER BOQ AND TENDER DOCUMENTS
AS PER TENDER DOCUMETS
Maintenance work
DISMANTLING tield roofing,wood frames,doors and windows,brick works Fixing frames steel frame works doors and windows fixing,plastering ,flooring,colour washing,
Construction of platforms for motors and pumps, Parapet wall works, plastering, flooring, Painting, canal Construction,cistern construction,encasing Laying of PVC pipelines etc
Earthwork for foundation CC M25 mix for plinth beam slab etc solid blocks plastering works painting antiskid ceramic flooring plumbing and sanitary works
Foundation and structural works, Masonry works, Flooring Joinery works, Plumbing, Finishing works and Inauguration Stone, Truss work for Tower portion and Electrification Works
kuttikavala,tile work and irish work recommenede in this estimate.Due to insufficient width for providing drain,irish p r o p o s e d i n t h i s a r e a t o s o l v e waterlogging
solid block wall,wall tile,floor tile sanitary fittings, Provide new ceramic tile work for wall and floor,aluminium work for F R P d o o r f o r toilet,Plastring,Painting,Painting with tile guard paint, Necessary sanitary fittings etc
Demolishing brick works , Demolishing RCC works, Painting , Tile work , False ceiling etc New wiring installation at the lab and library are proposed to charge from this DB.3 nos of AC points are proposed at library near to the lab.One 4 Module etc
The items included in this estimate are Aluminium partitions in front portion, MDF for cubicle Aluminium door and windows for kitchen , solid block , tile work ,GI sheet roof for passage ,wash basin, long body tap. CPVC pipe for hot waste water from
Dismantling of brick work, windows and floor tile. Brick work for drainage side wall and toilet walls. Pre cast cover slab and RCC Lintel work. Providing cupboard doors and wall shelf. Toilet wall and floor tiling works. Plumbing works.
Clearing the site Earth work in excavation by mechanical means CC 1 4 8 Random rubble masonry DR Packing Centering and shuttering RCC work Earth Filling Steel reinforcement for RCC work solid block masonry Plastering Work tiles Work
This work an constructed as framed structure solid block masonry Finishing works such as Plastering painting Flooring Stainless steel item for ramp hand rails