Loading…
Loading…
3,191 results • Best match
MP-LADS-2022-23-Construction of Assembly Hall with truss-work roofing and interlocking CC blocks flooring in the yard of Govt U P School Kunnakkurudy, Mazhuvannoor GPGeneral Civil Work
Items included in the estimate are Dismantling the existing damed tile by engaging man mazdoor, WMM for base course, Relaying the existing good tile and providing 100mm interlocking tilesand concrete for tile arrester
Includes Civil Works Plumbing works and Electrical works.
AS PER BOQ AND TENDER DOCUMENTS
Renovation to District Animal Husbandry Office.
Maintenance of existing fiber pond hall, sheet roofing, re flooring, plumping, Foundation with DR masonry,Basement with RR masonry, RCC Plinth beam, Super structure with solid block masonry, doors and ventilators.
This estimate includes Laying of new roof truss for Work Shed shed etc Dismantling of existing roof truss for shed Work shed etc Solid block for Work shed Flooring painting etc
The work includes only structure of building except masonry works lintels sunshade joineries plastering flooring finishing works electrification etc Structure has been analysed and designed for two storey with wind effect
Providing False Ceiling, Aluminium Partition for godown and new Toilet for KMSCL , painting, providing false ceiling and vitrified flooring of office building for KSBC, providing scooter shed and other maintenance works.
The provisions included are dismantling and demolishing works, works of aluminium doors and windows, partition works, works of storage racks, flooring, painting, sanitary and water supply works, supplying office furniture etc.
demolishing brick work rubble dismantling door earthwork earth filling Centering and shuttering PCC RCC Steelreinforcement brickwork plastering work MS grill UPVC door and windows and ventilator works Plumbing works flooring Painting
PWD STAFF QUARTERS VIDYANAGAR KASARAGOD-SPECIAL R E P A I R S W O R K S - PAINTING,FLOORING,SHEET ROOFING AND OTHER REPAIRS WORKS TO AEE QUARTERS -Composite Work
Annual Plan-MG Road - 2022-23-Project 529/23 - Karalakam ward - Retiling of (1) kalarickal janardhana jn road (2) plakkil road (3) paalakulam koloth road (4) mupparammil road(5) karalakam kuttichira road (6) re concreting of chirayil
AS PER BOQ AND TENDER DOCUMENTS
Provisions of the estimate are providing false cieling to office room , Providing concrete blocks for raising thwall
Dismantling tiledroof wood work doors ademolishin brick work aaaaaaaaaaaaaaaaaaaastuctural works brick work Plastering supplying and fixing doors and windows brick work roofing flooring plastering finishing works providingfixing Tiron frames d and w
The estimate includes providing Framework for False Ceiling, pVC Wooden Grain Panel Board as False Celing, Painting, Interior Flooring of the Building and Toilet , Interocking and providing rain water gutter. the pas
Preparation of drawings, appropriate design for treasury functioning, estimate (as in PRICE), execution of all Civil works including Strong room,Server room, Plumbing, Electrical, Electronics works, Flooring, Diesel Generator, Furnishing, CCTV, STP,
Provisions included in the estimate are for maintenance of toilet , providing flooring to two record rooms, providing well cap to the existing well and providing steel stair for existing village office building.
Construction of First floor and finishing of Ground floor . Items such as RCC Work, Masonry, Plastering ,Painting, Steel Doors and windows work Flooring, plumbing and sanitary fittings and separate toilet block, etc included
GENERAL Special Repairs to District Jail Mananthavadi Filling expansion joint and Painting the compound wall Flooring work in female block and interlock work in female and male block-Work General Civil Work 1
earth work excavation for foundation CC for foundation base RCC is used for column footing column structure,plinth beam and roof slab.laterite masonry is provided for wall.ceramic tile is used for toilet flooring.
provision for driving coconut piles dr flooring m25 slab and raft,etc for proper completion of project and also includes provision for DR wing wall OHM delineator post guard stone for road safety
AS PER BOQ AND TENDER DOCUMENT
RCC for column, main slab, beam, solid block masonry, plastering with cement mortar, flooring with vitrified tile for hall, cermic glazed floor and wall tile for toilet block and painting on interior and exterior.
The proposal is for constructing work shed with structural steel roof with galvanised iron profile sheets 0.50mm Solid block foundation100mm thick brick wall Above brick wall grill provided for proper ventilation and light. flooring.
This estimate proposed RCC framed structure and raft strip footing, walls are proposed in solid block masonry . doors are proposed in wooden doors , windows and ventilators are in alumium structures . plastering ,painting ,flooring etc
The provisions included in this work are wooden flooring for renovation of dais, textured interior painting, painting of wall and ceiling, synthetic enamel paint for steel chairs, window Venetian blinds for window curtain etc.
slab . RCC M25 design mix flooring of 15cm thickness is proposed above the existing yard for a length of 70m maintaining a slope towards the wharf. Provisions for cleaning drain is also added in
This estimate included the provision for the construction of the balance portion of Second floor of HSE building, Truss work at the terrace floor, flooring of first and second floor of HSE building, etc .
The Estimate includes provisions for earth work excavation DR Foundation RR Basement load bearing structure with height of 2.5m Solid block masonry for super structure plastering flooring painting grill work for venilators PVC doors
AS PER BOQ AND TENDER DOCUMENTS
Civil work
AS PER BOQ AND TENDER DOCUMENTS
Dismantling roofing ceiling wall steel work Steel work for truss purlin GI sheet roofing Galvanised steel sheet Earthwork excavation RR and Laterate masonry Plastering filling earth CC flooring Painting renewing glass planes fixing rolling shutter
Aluminium work and ACP for partition work 25 mm dia 50 mm dia pvc pipe for internal and external drainageferrow cement ready made soak pit for waste waterDismantling plasteringvetrified tile for flooring and engaging coolie
Dismantling of existing spot lab, toilet and PCC floor carefully. Excavation laying PCC, RCC floor, column and lintel. Fabrication and erection of truss TATA YST310 and galvalume roofing. Providing false flooring, ceiling. Construction of cable
dismantling for damaged doors and windows, damaged roof sheet and roof members,patch plastering,flooring with vitrified tile,FRP door for toilet and other doors, GI section for roof and corrugated sheet, painting,sanitry fitting
Maintenance work
DR masonry for foundation, R.R masonry for basement and M20 concrete for all reinforced concrete works. Also all joinery works are shown in wood.ceramic tile proposed for flooring due to fund limitation. emulsion Painting also included.
Construction of new single storeyed framed structure of plinth area 113.32 m2. Foundations with reinforced cement concrete works, walls with solid block masonry, wood work,flooring,painting, construction of a compound wall with gate,electrical, etc
It is framed structure and mainly includes earth work, PCC 1 4 8, RCC 1 1.5 3, Random Rubble Masonry, Solid Block masonry, Cement plastering, painting, Flooring with cement grout etc.Electrification are not included the estimate.
Ring Bund Bailing out water Earth work coconut pile Earth work filling DR packing CC RCC Steel reinforcement Centering and shuttering Shutter for check dams RR solid block masonry flooring structural steel work rolling shutter etc
The necessary provisions for two toilets with ramp such as Earth work for foundation, CC for Foundation, M 20 mix for plinth beam, slab etc., Solid Blocks, Plastering works, Painting Ceramic flooring Plumbing and sanitary works.