Loading…
Loading…
5,098 results • Best match
Tajganj, Room No. 49, Bar Wali Gali, flooring work by C.C. from Chandrabhans house to Ajit house
Flooring work by CC in lane no. 9 and 10 in Hariparvat Zone, Room no. 07, Kaushalpur.
Tajganj, room number-22, construction of flooring by CC from Dataram to Raghuveer house in Rahul Nagar.
Zone-3 Tajganj Room No.-61, Khwaspur, from Kushwaha to Tyre Wale, construction work of CC flooring.
Supply of Building material,Painting and Flooring work at N.S.S.Building in campus of Sampurnanand Sanskrit University Varanasi
NAGAR PANCHAYAT ACHALGANJ ME KANHA GAUSHALA, PASHU SHELTER HOME ME COW SHADE KE ANDAR RCC, FLOORING KARYA.
Zone-3 Tajganj Room No.-70, Construction work of C.C. flooring in the streets under Hastinapuri, Madhunagar.
Flooring work by CCC from Amina house to Pappu house in Tajganj, Room No. 61, New Khwaspur.
SPECIAL REPAIR TO FLOORING OF SCHOOL BLDGS AT CENTRAL SCHOOL UNDER AGE BR II AT GE FAIZBAD
Zone-3 Tajganj Room No.-97 CC from Vanshidhar house in Neetibagh to Goswami house. flooring work
Construction work of C.C. flooring from Sameena Nurse to Transformer in Khwaspura, Cell No. 61, Zone-3.
10 - Vitrified Flooring, Renovation, Upgradation and minor alteration work in Resi No. AB-1 at University Campus
SPECIAL REPAIR TO FLOORING JOINERY SANITARY AND WATER SUPPLY ITEMS OF SINGLE OFFRS ACCN AT SAF CAMP
CONSTRUCTION OF OUTDOOR SPORTS FACILITIES AND M.P. HALL FLOORING OF PROF. RAJENDRA SINGH (RAJJU BHAIYA) UNIVERISTY PRAYAGRAJ
Providing of paver block in front of Kitchen in place of damaged bricks flooring (As per Scope)
Unbranded As per BHEL Doc no. HPE/STDSPEC/FALSE FLOOR Rev: 00 (Attached) False Flooring System (BHEL)
Provision of toilet block and repair to BNPL flooring at F.F Post Office Bldg. sec 16, Noida
Repairing of Auditorium Hall flooring of at Dr. Ram Manohar Lohiya Parikalp BhawanTelibagh, Lucknow. (Lot No.06)
D/o Village (Repair of flooring, roof, toilet AND Boundary wall in Primary school in Barola) Noida
Construction of flooring by RCC near the office near Bindukatra police post under Tajganj zone. (Part-1)
Lohamandi Zone, Room No. 76 Construction of CC flooring from Moti Palace Hotel to Chaudhary Sahib house.
CERTAIN REPAIR OF PLASTERING, FLOORING AND OTHER BR EM WORK IN TECHNICAL AREA AT AF STATION BAREILLY
Zone-3, Tajganj, Room No. 70 Near the Tomb of Tal Firoz Khan CC flooring construction work.
SPECIAL REPAIR TO ROOF,FLOORING ,JOINERY AND CONNECTED WORKS AT KV NO 1 UNDER GE (AF) GORAKHPUR
8821 REPAIRS TO JOINERY, PLASTERING, PLUMBING, FLOORING, PLINTH PROTECTION AND BRICK WORK ETC. AT AF STATION, BAREILLY
REPAIR OFSUNKEN FLOORING RUSTED PIPELINES AND CONNECTED WORKS IN AGV AND CHARARI AREA AT AFS CHAKERI KANPUR
Providing and fixing PVC flooring and painting in Room No. 102 H, DJAC Building, at IIT Kanpur
Mastic Flooring work (DBM, BC and Mastic work from Irrigation drain to India TV, Sector-85) Noida
Kota flooring in ground floor corridor & road repair of Kendriya Vidyalaya No. 2 JLA at Cannt, Bareilly
FIXING STRIP FOR DECOUPLING ELEMENTS FOR FLOORING, as per Drawing: LZ41118 ALT a, Packing Instruction: WOODEN BOX
FIXING STRIP FOR DECOUPLING ELEMENTS FOR FLOORING, as per Drawing: LZ41118 ALT a, Packing Instruction: WOODEN BOX
FIXING STRIP FOR DECOUPLING ELEMENTS FOR FLOORING, as per Drawing: LZ41118 ALT a, Packing Instruction: WOODEN BOX
Tajganj Zonal Office Construction of CC flooring in Sohalla No. 22, from Satish house to Valmiki house.
Unbranded As per BHEL Doc no. HPE/STDSPEC/FALSE FLOOR Rev: 00 (Attached) False Flooring System (BHEL)
Unbranded As per BHEL Doc no. HPE/STDSPEC/FALSE FLOOR Rev: 00 (Attached) False Flooring System (BHEL)
REPAIR / REPLACEMENT OF SANITARY FITTINGS, PLUMBING WORK , FLOORING, TILING, PLASTERING WORK, SUNKEN TREATMENT IN DOMESTIC AND TECH AREA AT AF STN SARSAWA UNDER GE(AF) SARSSAWA
Gomtinagar phase 2 stith awas no D 114 type 4 me kitchen platform per black granite kitchen wardrobe, kitchen wall tiles aangan ki boundary wall marammat rangai putai ka karya avem aangan ki shatigrast farsh marammat ka karya
Cabinetganj colony stith awas no. D-4 me shatigrast plaster ki marammat karana, snangrah/ shauchalya me floor avem wall tiles lagana, baramde ki shatigrast farsh ki marammat karna bathroom me shatigrast darwaze badalna avem anya awashyak vibhinn mara
REPAIR REPLACEMENT OF FLOOR WALL TILES FALSE CEILING PLUMBING AND SANITARY FITTINGS ETC IN 801 ENGR REGT 411(I) ENGR COY NCC UNITS 7 PARA SOM MALL ROAD OFFICERS MESS ETC UNDER AGE BRI OF GE EAST AGRA
GomtiNagar phase-2 Mantri awas stith aawas no-A-307 type- 5 me adhyasan parivartan ke Karan shatigrast bathroom ki wall tiles badalna va shatigrast kitchen navinikaran, wardrobe, shatigrast khidki darwaze ki marammat, do kamron ki shatigrast vitrifie
REPAIR/MAINT OF ROOF SHEET, PLASTER, BRICK WORK, TILING, SANITARY FITTING, JOINERY AND MISC WORKS IN CERTAIN RESTRICTED AREA (SG) AT SARSAWA UNDER GE (AF) SARSAWA
REPAIR/MAINT OF ROOF SHEET, PLASTER, BRICK WORK, TILING, SANITARY FITTING, JOINERY AND MISC WORKS IN CERTAIN RESTRICTED AREA (PTS) AT SARSAWA UNDER GE (AF) SARSAWA
REPAIR/MAINT OF ROOF SHEET, PLASTER, BRICK WORK, TILING, SANITARY FITTING, JOINERY AND MISC WORKS IN CERTAIN RESTRICTED AREA (ARC) AT SARSAWA UNDER GE (AF) SARSAWA
Development of Village (Painting , sanitary fitting, Tile work and Other Maint. Work in Community Centre, Shamshan Ghat, Valmiki Panchayat Ghar, HCL Toilet of Village Sarfabad and Community center in Sector-73) Noida
Tile work in rooms and various repair works in Block No. 15 16 17 19 20 21 22 23 24 and 25 of Type 3 Jail Road PWD Colony Lucknow (Group-B)
CC drain and interlocking tile work in the abadi portion of Nabavganj urban part (ODR) in Bareilly district Under Dharmarth Scheme in the financial year 2025-26 (including maintenance for 05 years)
Ward No. 23 Construction of Room, Bath room, Boundary Wall, Interlocking Passage, Earth Filling work, Plumbing, electrical work, False ceiling, Floor and Wall Tile work in Shamshan Ghat at Moradabad Chandausi Road.
REPAIR TO FLOORING BRICKWORK PLASTERING LEAKAGE SEEPAGE ROOFING JOINERY TILINGOF WALL FLOORING SANITARY AND PLUMBING WORKS OF OTM ACCN OF 6 MTN DIV EMP COY PRO UNIT AND GARUD OFFRS MESS AREA AT MIL STATION BAREILLY UNDER GE EAST BAREILLY
Construction of C.C. flooring in the courtyard of Kanteshwar Mahadev temple located in Loha Mandi zone room number- 26, construction of flooring work by interlocking tathals in Tyagi Wali Gali of Rui Ki Mandi and painting work in Shri Krishna Gaushal
REFER TENDER DOCUMENT