Dismantling, Fabrication and Erection of damaged 300mm M.S. ash disposal line No:I and II from sleeve joint No:92 to 124 with new MS pipe and ash disposal line-III 180 Degrees rotation from sleeve joint No:92 to 124 of stage-III inside the tunnel and clearing and cleaning of accumulated ash in the closed tunnel for the year 2025-26.
Providing 3 No.Poclains on hire basis with engine capacity of atleast 136 HP and bucket capacity of 0.91 Cum for loading the pond ash into the pond ash user vehicles at Dr. NTTPS Stage-III ash Pond for 12 hrs per day per poclain for the period of 12(twelve) months from actual date of commencement of work
Supply of FaL-G /Cement Fly ash solid Blocks with Compressive strength not less than 50 Kg Sq.cmto Beneficiaries specified plot in any Layout of Eluru Eluru Corporation Pedapadu Pedavegi Denduluru Pentapadu
Emergency Replacement, Rectification and Fabrication of MS/CI pipes & Tyton/sleeve gaskets, MS bends of three ash disposal lines of Stage-I /Dr.NTTPS during the year 2022-2023.
Custom Bid for Services - Contract Proposal for laying of Pipeline for Dry ash handling system Similar Category Operation and Maintenance Power House/Power Plant
DR.MVR RTPP- STAGE-IV- EM&MRT- PROCUREMENT OF "ESCORT" MAKE FLUIDIZING BLOWER HEATERS FOR THE ASH HANDLING PLANT IN 600MW UNIT- OFFER- REQ- REG
Procurement of Spares for Flowmore make HP Seal Water Pump and LP Seal Water Pump in New Wet Ash Handling System of Stage-IV
Procurement of Spares for Flowmore make HP Seal Water Pump and LP Seal Water Pump in New Wet Ash Handling System of Stage-IV
Procurement of Fal-G / Cement Fly ash Solid Blocks with compressive strength not less than 50 KG/Sq.cm for construction of houses under Navaratnalu Pedalandariki Illu Programme in all constituencies of Ananthapuramu District.
Procurement of Fal-G / Cement Fly ash Solid Blocks with compressive strength not less than 50 KG/Sq.cm for construction of houses under Navaratnalu Pedalandiriki Illu Programme in all constituencies of Anantapuramu District
Procurement of Fal-G / Cement Fly Ash Solid Blocks with Compressive strength not less than 50 Kg/Sq.cm for construction of houses under Navarathnalu Pedalandariki Illu Programme in all Constituencies of Ananthapuramu District.
SPARES-100258543_ITEM_10_M5656036003, ITEM_20_M5656036001, ITEM_30_M5656556166, ITEM_40_M5656036007, ITEM_50_M5656036021, ITEM_60_M5656036022, ITEM_70_M5656036035, ITEM_80_M5656036006, ITEM_90_M5656036002, ITEM_100_M5656036000, ITEM_110_M5656556168, ITEM_120_M5656556167
Anticipated/Emergency breakdown maintenance of 3Nos Ash Disposal lines of Stage-III/Dr.NTTPS from Ash pump house to ash pond as and when required during the year 2018-19.
Anticipated/Emergency breakdown maintenance of 3Nos. ash disposal lines of Stage-III/Dr.NTTPS from ash pump house to ash pond as and when required during the year 2025-26
Anticipated/Emergency breakdown maintenance of 3Nos. ash disposal lines of Stage-III/Dr.NTTPS from ash pump house to ash pond as and when required during the year 2024-25
Anticipated break down rectification works and maintenance works to be carried out on 3nos Ash disposal lines of Stage - II as and when required during the year 2021-22
Operation and Maintenance works of ash handling plant, Stage-II (2X210 MW) of RTPP for the period from 01-04-2017 to 31-03-2018.
Supply of Filter Bags for Buffer hopper and Vent filter and Cages for Buffer Hopper of Ash Handling System of Stage-IV(1 x 500MW)
RTPP-OandM-Civil-Maintenance of Stage-II and III Water Pretreatment Plants and Stage-III Ash Handling Plant for the period from 01.04.2019 to 31.03.2020.
Providing 3 No.Poclains on hire basis with engine capacity of atleast 136 HP and bucket capacity of 0.91 Cum for loading the pond ash into the pond ash user vehicles at Dr. NTTPS Stage-III ash Pond for 12 hrs per day per poclain for the period of twelve months from actual date of commencement of work or from 01.04.2020 to 31.03.3021
Dr.NTTPS-Re routing of wet ash disposal lines of Stage I,II & III across national highway-30 at outside the premises of Dr.NTTPS adjacent to colonies filter water pump house
Dr.NTTPS - Rotation of existing 300 mm dia M.S Ash disposal pipe line No.II of Stage III along Bund No.II of Stage III Ash Pond from Ch. 0.00M to Ch. 500.00M.
Anticipated/Emergency breakdown maintenance of 3 Nos ash disposal lines of Stage-III/Dr.NTTPS from ash pump house to ash pond as and when required during the year 2023-24
Repair to existing damaged major drain with Solid Flyash brick work at old club road North side in Div No5 under AE- 13 Section LLR
Repair and Reconditioning of two numbers of damaged/worn out Aeromatic make Vacuum pumps of model 140 of Ash Handling System for the year 2022-23.
RTPP-Civil-O&M-Attending miscellaneous civil repair works in Stage-I, II & III Ash handling system and Water pretreatment plants for the year 2019-20.
Repair and Reconditioning of two numbers of damaged/worn out Aeromatic make Vacuum pumps of model 140 of Ash Handling System for the year 2022-23.
RTPP-Civil-O&M-Attending miscellaneous civil repair works in Stage-I, II & III Ash handling system and Water pretreatment plants for the year 2022-23
Dr MVR RTPP Civil Attending miscellaneous civil repair works in Stage I II III Ash handling system and water pretreatment plants for the year 2024 25
Repair and Reconditioning of two numbers of damaged worn out Aeromatic make Vacuum pumps of model 140 of Ash Handling System for the year 2022 23.
Dr MVR RTPP Civil Attending miscellaneous civil repair works in Stage I II III Ash handling system and water pretreatment plants for the year 2024 25
Upkeeping of buildings and areas of Common Auxiliaries division,Stage-III and Lifting & transportation of fly ash dumped from pending ESP hoppers of Units 5&6 as and when required during the year 2024-25
Procurement of paints for use in the fly ash system,630KV Transformers and the HT/LT Switch gear panel at A&B Colonies,I&C Division,CHP Division,turbine division and electrical equipment unit side
Upkeeping of buildings and areas of Common Auxiliaries division,Stage-III and Lifting & transportation of fly ash dumped from pending ESP hoppers of Units 5&6 as and when required during the year 2024-25
Procurement of paints for use in the fly ash system,630KV Transformers and the HT/LT Switch gear panel at A&B Colonies,I&C Division,CHP Division,turbine division and electrical equipment unit side
AMC for overhauling of double roll clinker grinder and Hydro Ejectors (Jet pump) and replacement of clinker grinder ropes of Unit-3 and 4 bottom ash system whenever necessary during the year 2025-26
Anticipated break down rectification works and maintenance works to be carried out on 3nos ash disposal lines of Stage II / Dr NTTPS as and when required during the year 2023 24
Anticipated break down rectification works and maintenance works to be carried out on 3nos ash disposal lines of Stage-ii / Dr NTTPS as and when required during the year 2023-24
Supply of FaL-G Cement Fly ash solid Blocks with Compressive strength notless than 50 Kg Sq.cm to Beneficiaries specified plot in any Layout of any Mandal of Madanapalli Division of Chittoor District of Andhra Pradesh
Lifting & Transportation of ash, soot etc., collected in the fly ash system areas and disposal off the same at suitable place as per the instructions of the Engineer-in-charge during the financial year 2017-18
Lifting & Transportation of ash, soot etc., collected in the fly ash system areas and disposal off the same at suitable place as per the instructions of the Engineer-in-charge during the financial year 2017-18
Supply of Fal-G Cement fly ash solid blocks with compressive Strength not less than 50 Kg SQ Cm to beneficiaries Specified plot in any layouts of any Assembly Constituency in Prakasam District of Andhra Pradesh
Supply of Fal-G Cement fly ash solid blocks with compressive Strength not less than 50 Kg SQ Cm to beneficiaries Specified plot in any layouts of any Assembly Constituency in Prakasam District of Andhra Pradesh
Supply of Fal-G Cement fly ash solid blocks with compressive Strength not less than 50 Kg SQ Cm to beneficiaries Specified plot in any layouts of any Assembly Constituency in Prakasam District of Andhra Pradesh
Construction of Fly Ash Brick Drain at PF Office Road and Dust Filling to Road Shoulders at PF Office Road & Gardens 2nd Line Cut Road in Div. No.35 under AE-2 Section, Guntur Municipal Corporation.
Dr. MVR RTPP-M12-CAM-Stage2-Procurement of HP water pump to replace existing ZM II 630/03 model pump for usage in ash handling plant-reg
Dr.NTTPS-Re routing of wet ash disposal lines of Stage I, II & III across national High way-30 at out side the premises of Dr.NTTPS adjacent to colonies filter water pump house
Dr.NTTPS-Ashpond-Laying of MS pipelines of 400mm in place of damaged existing ash disposal pipe lines of ADL-I&II of Stage-I along khilla road of stage-III ash pond
Dr.NTTPS-Laying of MS pipelines of 300mm/400mm in place of damaged existing ash disposal pipe lines of ADL-III of stage-I&III along dyke no.II of stage-III ash pond
Supply of FaL-G Cement Fly ash solid Blocks with Compressive strength not less than 50 Kg Sq.cm to Beneficiaries specified plot in any Layout of any Mandal of Chittoor Division of Chittoor District of Andhra Pradesh