Loading…
Loading…
1,062 results • Best match
Supply of FaL-G Cement Fly ash solid Blocks with Compressive strength not less than 50 Kg Sq.cm to Beneficiaries specified plot in any Layout of any Mandal of Tirupathi Division of Chittoor District of Andhra Pradesh
Modification of Silo I II from Dry fly ash to semi wet ash system for un loading to open Trucks through rotary unloader in emergencies including Supply Erection and Commissioning of Unit7 (500MW) Stage IV Dr NTTPS
Custom Bid for Services - PAINTING OF ADL AND AWRC PIPES AND STRUCTURES IN ASH HANDLING SYSTEM AT NTPC SIMHADRI Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Deployment of manpower for special maintenance assistance in ash handling area at NTPC Simhadri for 2 years Similar Category Manpower Outsourcing Services - Minimum wage
Repair and Reconditioning of two numbers (1 & 5) of damaged/worn out Aeromatic make vacuum pumps of model 140 of Ash Handling System during the year 2021-22.
Repair and Reconditioning of two numbers (1 & 5) of damaged/worn out Aeromatic make vacuum pumps of model 140 of Ash Handling System during the year 2021-22.
Lifting and Transportation of ash, soot etc from the Fly ash system areas and disposal off the same at suitable place as per the instructions of Engineer in charge as and when required during the F.Y.2016-17
Modification of Silo I & II from Dry fly ash to semi wet ash system for un loading to open Trucks through rotary unloader in emergencies including Supply Erection and Commissioning of Unit 7 (500MW) Stage-IV Dr NTTPS
Modification of Silo I & II from Dry fly ash to semi wet ash system for un loading to open Trucks through rotary unloader in emergencies including Supply Erection and Commissioning of Unit 7 (500MW) Stage-IV Dr NTTPS
Modification of Silo I & II from Dry fly ash to semi wet ash system for un loading to open Trucks through rotary unloader in emergencies including Supply Erection and Commissioning of Unit 7 (500MW) Stage-IV Dr NTTPS
Desiltation of flyash Removal from Mylavaram Reservoir South Canal Chainage from Km.23.900 to Km.27.000 and Jammu clearance from Km.20.000 to Km.27.000 in Kadapa District
Procurement Of Valve Disc For 100NB & 200 NB Double Disc Valves , Valve Disc And Valve Seat For Ash Extraction Valves ,50 NB Bi Directional Valves For Ash Handling System
Maintenance of Bottom Ash Clinker Grinders, Ash Slurry Disposal Pumps, HP Water Pumps, Cooling Water Pumps, Seal water pumps, 300NB MS Ash slurry discharge pipe line in ash pond up for the year from 01.04.2019 to 30.06.2019
Maintenance of Bottom Ash Clinker Grinders, Ash Slurry Disposal Pumps, HP Water Pumps, Cooling Water Pumps, Seal water pumps, 300NB MS Ash slurry discharge pipe line in ash pond up for the year from 01.04.2019 to 30.06.2019
Anticipated/Emergency break down maintenance of 3Nos Ash disposal lines from Ash Pump House to Ash Pond of Units 5&6 of Stage-III/Dr.NTTPS as and when required during the year 2019-20.
Anticipated/Emergency break down maintenance of 3Nos Ash disposal lines from Ash Pump House to Ash Pond of Units 5&6 of Stage-III/Dr.NTTPS as and when required during the year 2021-22.
Anticipated/Emergency break down maintenance of 3Nos Ash disposal lines from Ash Pump House to Ash Pond of Units 5&6 of Stage-III/Dr.NTTPS as and when required during the year 2019-20.
Anticipated/Emergency break down maintenance of 3Nos Ash disposal lines from Ash Pump House to Ash Pond of Units 5&6 of Stage-III/Dr.NTTPS as and when required during the year 2021-22.
Custom Bid for Services - 200147868 Contract for Fabrication, Erection of Platforms & Dismantling of Structure/Pipes at Fly Ash Handling Areas Stage-I/II for two years at NTPC Simhadri Similar Category Operation and Maintenance Power House/Power Plant
Operation and maintenance of 250MT capacity and other facilities for extraction of Dry Fly Ash from 2nd field,3rd, 4th,5thand 6th fields of ESPs of Stage-I(Unit I&II) of RTPP from 01.09.2017 to 31.03.2018(7 months)
Lifting and Transportation of ash soot etc collected in the fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer in charge during the financial year 2018 19
Lifting and Transporting of ash, soot etc., collected in the ESP Fly ash System and other areas and disposal of the same at suitable place as per the instructions of Engineer in charge during the financial year 2021-22
Lifting and Transporting of ash, soot etc., collected in the ESP Fly ash System and other areas and disposal of the same at suitable place as per the instructions of Engineer in charge during the financial year 2021-22
Lifting and Transporting of ash, soot etc., collected in the ESP Fly ash System and other areas and disposal of the same at suitable place as per the instructions of Engineer in charge during the financial year 2021-22
Lifting and Transporting of ash, soot etc., collected in the ESP Fly ash System and other areas and disposal of the same at suitable place as per the instructions of Engineer in charge during the financial year 2021-22
PROCUREMENT OF V BELTS SPC-4250 FOR IAC NO.6 COMPRESSOR HOUSE AND FOR D-85-D AND D-135-8 PUMPS OF ASH PUMP HOUSE AND ASH HANDLING SYSTEM
Lifting and Transporting of ash, soot etc., collected in the Unit-2 ESP Fly ash System and other areas and disposal of the same at suitable place as per the instructions of Engineer in charge during the financial year 2021-22
Supply of FaL-G or Cement Fly ash solid Blocks with Compressive strength not less than 50 Kg per Sq.cm to Beneficiaries specified plot in any Project Site or Layout of any Mandal in SPSR Nellore District of Andhra Pradesh.
Round the Clock direct connection of the coarse ash, fly ash, soot etc from ESP Hoppers by placing the tractor below the hoppers and disposing that suitable place as per the instructions of Engineer In charge during the year 2016-17
2nd stage-Supply of FaL G Cement Fly ash solid blocks of compressive strength not less than 50 Kg Sq cm to beneficiaries specified plots in any Project site Layout site in any mandal of Srikakulam District in Andhra Pradesh
Replacement of wornout 200 NB and 250 NB MSERW pipe lines of fly ash Conveying lines A,B,C and D from ESP hoppers to upto silo during the COH/AOH of 500 MW ,unit-7 during the year 2024-25.
SDSTPS-Lifting & Transportation of Ash, soot etc., collected in the ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23
SDSTPS-Lifting & Transportation of Ash, soot etc., collected in the ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23
Anticipated/Emergency break down maintenance of 3Nos Ash disposal lines from Ash Pump House to Ash Pond of Units 5 and 6 of Stage-III/Dr.NTTPS as and when required during the year 2020-21.
Dr NTTPS Maintenance of drainage system, associated civil works of Stage 1 Ash Pond, miscellaneous civil works and maintenance of Ash Disposal Lines at Ash Ponds Stage 1 and 3 for the year 2020 21
Dr NTTPS Maintenance of Drainage system associated civil works of Stage I Ash pond miscellaneous civil works and maintenance of ash disposal lines at ash ponds stage I and III for the year 2021-22
Dr NTTPS Maintenance of Drainage system associated civil works of stage I Ash pond miscellaneous civil works and maintenance of ash disposal lines at ash ponds stage I and III for the year 2021-22
Custom Bid for Services - Please quote total amount inclusive of GST for Fabrication Erection of Platforms Dismantling of Structure Pipes at Ash Handling Stage III for two years at NTPC Simhadri
DrNTTPS-C&M-IV-Maintenance of drainage system associated civil works of Stage-I ash pond,miscellaneous civil works and maintenance of ash disposal lines at ash pond stg-I&III for the year 2022-23
DrNTTPS-C&M-IV-Maintenance of drainage system associated civil works of Stage-I ash pond,miscellaneous civil works and maintenance of ash disposal lines at ash pond stg-I&III for the year 2022-23
Anticipated Emergency break down maintenance of 3Nos Ash disposal lines from Ash Pump House to Ash Pond of Units 5 and 6 of Stage III Dr NTTPS as and when required during the year 2022-23
DrNTTPS-C&M-IV-Maintenance of drainage system associated civil works of Stage-I ash pond,miscellaneous civil works and maintenance of ash disposal lines at ash pond stg-I&III for the year 2022-23
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from ESP Hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the Engineer-in-Charge during the year 2019 20
Round the clock direct collection of the coarse ash fly ash soot etc from ESP hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the engineer in charge during the year 2018-19
Round the clock direct collection of the coarse Ash, fly ash, soot etc., from ESP hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2023-24
SUPPLY OF VARIOUS NOZZLE ASSEMBLY OF BOTTOM ASH HOPPERS
SDSTPS - Providing man power for carrying out the Operation & Mechanical Maintenance works of the total Ash Handling System for a period of 12 months from 01.04.2017 to 31.03.2018 including T&P and Consumables.
Removal and transportation of spilled over ash under ESPs, Silos, under Hydrobins Bottom ash hopper area, to the designated area as of Unit-7 boiler or designated area within the plant premises of Dr.NTTPS, by trucks/tractors/trailers during the year 2024-25
Round the clock direct collection of coarse ash, fly ash, soot etc., from ESP hoppers by placing the tractor below the hoppers and disposal of the same at suitable place as per the instructions of Engineer- in- charge for the financial year 2016-17
SDSTPS-Round the clock direct collection of the coarse Ash, fly ash, soot etc., from ESP hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23