Loading…
Loading…
1,062 results • Best match
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT - 1 & 2 C&D pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2025-26
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from Unit-2 A&B Pass ESP hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2025-26
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from Unit-2 A&B Pass ESP hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Outsourcing of Services for operation, Maintenance and Up-keeping works pertaining to Wet ash handling system/Stg-IV/ Dr.NTTPS for a period of One year i.e. from 01.04.2025 or from date of commencement of work to 31.03.2026
Reconstruction of collapsed compound wall on west and south sides and Providing of flyash brick masonry drain, Masonry sump, 5 HP centrifugal monoblock pumps and CC Ramp at the entrance gate at 132KVSS Tirupathi in Chittoor district.
Rotation of 400mm NB MS/CI pipes through 180 degrees/90 degrees in various locations from PD.No.490 to 650, PD.No.650 to 928 and PD.No.928 to 1498 on 3 Nos ash disposal lines of stage-II/ Dr.NTTPS during the year 2017-18
Carrying out the replacement of worn out 300NB MS ERW pipes , bends and sleeve couplings on fly ash conveying lines and laying of pipe racks for conveying lines of SILO's of AHP/STAGE-1/SDSTPS during the annual overhauls of either unit-1 or 2 during the year 2023-24
Carrying out the replacement of worn out 300NB MS ERW pipes , bends and sleeve couplings on fly ash conveying lines and laying of pipe racks for conveying lines of SILO's of AHP/STAGE-1/SDSTPS during the annual overhauls of either unit-1 or 2 during the year 2023-24
Lifting & Transportation of floor ash soot etc collected in the Unit-2 AB Pass ESP hoppers and conveying line areas of ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2025-26
Lifting & Transportation of floor ash, soot etc., collected in the Unit-2 AB Pass ESP hoppers and conveying lines areas of ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Lifting & Transportation of floor ash soot etc collected in the Unit-2 CD Pass ESP hoppers and conveying area lines of ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in-charge during the financial year 2025-26
SUPPLY OF 200NB KNIFE GATE VALVES WITH CHAIN REQUIRED FOR FLY ASH/AHP/STAGE-I
Anticipated breakdown rectification works on Ash disposal pumps, Seal water pumps and Ash disposal series inside the pump house and upto PD.No.1 of Ash disposal pump house of Stage- II/Dr.NTTPS as and when required during the year 2026-27 from the date of commencement to 30.09.2026.
SUPPLY OF MS BOLTS AND NUTS FOR SLEEVES FOR ASH DISPOSAL LINES
PROCUREMENT OF DELPD MAKE GEAR PUMP COOLERS FILTERS FOR STG2 BOTTOM ASHSERIES PUMP FLUID COUPLING AHD NTPC MOUDA
SDSTPS -Stage-I(2X800 MW) - Up keeping of buildings, cleaning of toilets and Maintenance of Avenue/flowering plants in the Coal handling and Ash handling plant areas for the period from 01.07.2019 or actual date of commencement of work to 31.03.2020
SDSTPS -Stage-I(2X800 MW) - Up keeping of buildings, cleaning of toilets and Maintenance of Avenue/flowering plants in the Coal handling and Ash handling plant areas for the period from 01.07.2019 or actual date of commencement of work to 31.03.2020
Replacement of badly eroded 400mm NB CI Pipes and bends with new 406mm OD MS ERW / CI pipes and bends or rectified bends after raising the MS Channel /existing pedestals from Loc. No.570 to Loc.No.760 on 3Nos ash disposal liens of Stage-I / Dr.NTTPS.
Name of Work Rreplacement of eroded and worn out 406 OD MS/ERW pipes with new 406mm OD MS/ERW pipes from PDno.01 to 404for a length of about 5000 mtrs on 3 Nos ash disposal lines-1,2&3 of stage-1/DR.NTTPSduring the year2025-26.
PROCUREMENT OF V-BELTS(D-298)FOR ECS-I AND II / STAGE.I AND V-BELTS FOR AC PLANT AND COMPRESSOR HOUSE SECTION / STAGE.II AND TRAINING INSTITUTE / DR.NTTPS AND SPACE WEDGE BELT SAVER SPC-4650(V BELTS) TO D-85-D MODEL ASH DISPOSAL PUMPS/STAGE-II
Dr.NTTPS-Providing 2No operators of departmental excavators BEML make BE 220&BE220G model excavator for loading of pond ash in to vehicle at stage-III ash pond for 8hrs duration daily for the period from 01-04-2019 to 31-03-2020(excluding sundays)
SUPPLY OF MS ORDINARY SLEEVE FOR 400MM CI PIPE OF ASH DISPOSAL LINES.
Supply of Spare Clinker Grinder Motors in Ash Handling Plant
SUPPLY OF HP SEAL WATER PUMP FOR ASH HANDLING SYSTEM.
NTPC Simhadri Repair and Rehabilitation of Stage I ESP wetting units, Bottom Ashhopper structures at NTPC Simhadri.
Replacement of eroded 300NB MS pipe of ash disposal pipe lines-I, II and III of Stage III with new 300NB MS pipe at critical points such as TP 6 near Fire Station and TP 7 culvert near Anjaneya swamy temple and road crossings during the year 2022-2023
Replacement of eroded 300NB MS pipe of ash disposal pipe lines-I,II and III of Stage-III with new 300NB MS pipe at critical points such as TP-6 near Fire Station and TP-7 culvert near Anjaneya swamy temple and road crossings during the year 2022-2023
SUPPLY OF STUDS, BOLTS AND NUTS FOR ADPH AND ASH DISPOSAL LINES-1,2 & 3.
SUPPLY OF SLEEVE COUPLINGS(SIZES:200NB 250NB AND 300NB) REQUIRED FOR FLY ASH SYSTEM OF AHP/STAGE-I
SUPPLY OF 200NB KNIFE GATE VALVES WITH CYLINDER OPERATED,BI-DIRECTIONAL VALVE REQUIRED FOR FLY ASH/AHP/STAG
Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines,Bottom ash hoppers area,Coarse ash hoppers area and transporting the same to the ash pond by trucks tractors for a period from ... in Ash Handling Plant ...
Lifting and Transportation of ash, ash slurry etc., collected from the premises at bottom ash hopper area, coarse ash tank area and its transporting pipe line area etc.. of Unit-1 wet ash system area and disposal of the same at suitable place as per the instructions of Engineer in charge during the financial year 2022-2023
Replacement of badly eroded 400mm NB CI/MS pipes with new 406mm OD MS pipes From PD.No.1 to 306 and 648 to 920 on 1,2&3 ash disposal lines, Strengthening of pedestals with MS Channels from PD.No.650 to 950 in closed tunnel of Stage-II/ Dr.NTTPS during the year 2017-18.
DrNTTPS Providing and Engaging of 2nos poclain on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash in to vehicles at stage III ash pond for the period from 01-01-2019(or date of commencement of work) to 31-01-2019
Dr.NTTPS- Providing&Engaging of 2no poclains on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash in to vehicles at stg3 ash pond for theperiod from 01-12-18(or date of commencement of work) to 31-12-18 for 18hrs per day
Dr NTTPS providing and engaging of 1no poclain on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash in to the vehicles at stage-III ash pond for period of one month from actual date of commencment of work for 12hrs per day.
Dr NTTPS providing and engaging of 1no poclain on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash in to the vehicles at stage-III ash pond for period of one month from actual date of commencment of work for 12hrs per day.
Fly Ash System-Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT # 1 ESP Hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2026-27
Replacement of badly eroded pipes and patch welding in dry fly ash and wet ash conveying pipe lines from ESP hoppers to Intermediate silos and coarse ash hoppers to Stage-I pump house and from Intermediate silos to Remote silos of Stage-II (i.e. Units 3 and 4) for a period of one year (From April 2025 to March 2026)
SUPPLY OF FEEDER EJECTOR COMPLETE ASSEMBLY BELOW APH HOPPERS OF ASH HANDLING SYSTEM
Two (2) Year Maintenance Contract for AHP (Bottom Ash System, Ash Water and Ash Slurry System) at NTPC Simhadri
Replacement of badly eroded 400mm NB CI/MS pipes with new 406mm OD MS pipes From PD.No:1 to 306 and 648 to 920 on 1,2 & 3 ash disposal lines, Strengthening of pedestals with MS Channels from PD No 650 to 950 in closed tunnel of Stage II/ Dr.NTTPS during the year 2017-18.
Replacement of badly eroded 400 mm NB CI / MS Pipes and bends with new 406mm OD CI/ MS ERW pipes and bends or rectified bends after raising the MS Channel pedestals /existing concrete pedestals from location: 232 to439 for ADl -1,2,3 of ash disposal lines of Stage-I / Dr.NTTPS during the year 2025-26.
Replacement of badly eroded 400 mm NB CI MS Pipes and bends with new 406mm OD MS ERW pipes and bends or rectified bends after raising the MS Channel pedestals existing concrete pedestals from location 760 to 985 on 3 Nos ash disposal lines of Stage I Dr NTTPS during the year 2019 20
Providing assistance for supply of food stuffs at various locations of MCC, MCR, Wagon Tippler, stores of coal handling plant power house of stage-I,II&III, Ash Handling plant of RTPP services building of CE's office (Adm., Accounts, Purchase etc.,) for the period from 01.04.2017 to 31.03.2018.
Providing assistance for supply of food stuffs at various locations of MCC, MCR, Wagon Tippler, Stores of Coal Handling plant power house of Stage-I, II & III, Ash Handling plant of RTPP service building of CE's office (Adm., Accounts, Purchase etc.) for the period from 01.04.2018 to 31.03.2019.
Clearing of accumulated ash at ESP hoppers area, Intermediate silo area, Remote Silo area, along the ash conveying pipe lines and transporting the same to the ash pond by trucks/tractors,from date of work commencement to 31-03-2026 in Ash Handling Plant of Unit-5, Dr.MVR RTPP
Replacement of Eroded and defective ECO LTS LTR HTS HTR ITS Hanger feed coil tubes carrying out D-meter survey erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in pressure parts and rectification of heavily deformed ITSH coil tubes of Unit 2 boiler during annual overhaul period for the year 2018-19.
Replacement of Eroded and defective ECO LTS LTR HTS HTR ITS Hanger feed coil tubes carrying out D-meter survey erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in pressure parts and rectification of heavily deformed ITSH coil tubes of Unit 2 boiler during annual overhaul period for the year 2018-19.
Replacement of badly eroded 400mm Nb CI / MS Pipes and bends with new 406mm OD MS ERW / CI pipes and bends or rectified bends after raising the MS Channel pedestals /existing concrete pedestals from location:169 to 191 and from location :1142 to ... 3Nos ash disposal liens ...