Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6660824 Dated : 11-09-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Replacement of Defective ECo,LTR,LTS, HTS, HTR, ITS hanger feed coil tubes, eroded water wall tubes, fin welding of water wall tubes, metal build up on eroded portions of water wall tubes and coil tubes, providing of carbon steel pads on water wall ... at bottom ash hopper ...
Replacement of eroded and defective ECO,LTS,LTR,HTS,HTR,ITS hanger feed coil tubes eroded water wall tubes,fin welding of water wall tubes,metal build up on eroded portions of water wall tubes and coil tubes , providing of carbon steel pads on water ... at bottom ash hoppers ...
Replacement of eroded and defective ECO,LTS,LTR,HTS,HTR,ITS hanger feed coil tubes,eroded water wall tubes,fin welding of water wall tubes,metal buildup on eroded portions of water wall tubes and coil tubes , providing of carbon steel pads on water ... at bottom ash hoppers ...
Procurement Fluidising cloth and fluid insert for Air lock Vessel belowBuffer Hopper Intermediate Silo and aeration panel for Buffer Hopperand HCSD Silo for ash handling system of NTPC KUDGI
Anticipated breakdown rectification and maintenance works to be carried out on 3Nos ash disposal lines of Stage-II as and when required during the year 2026-27 from the date of commencement to 30.09.2026.
PROCUREMENT OF ASSEMBLY AND SPARES FOR 250 NB ALV PNEUMATIC ISOLATIONVALVES AND SPARE PARTS FOR CHAIN WHEEL OPERATED KNIFE EDGE GATE VALVEFOR ASH HANDLING SYSTEM FOR NTPC RAMAGUNDAM AND KUDGI
Procurement of Feeder Discharge valve complete assembly, Butterfly andBall vales of CPU ssystem and KGV complete assembly for 450 NB sizes andspare parts for KGV of different sizes used in ash handling system ofNTPC KUDGI
Handling, Transport and Other Mining Services - Percentage quote based - Ash Transportation, Rate Contract for Excavation, Loading and Transportation, Unloading of Ash form NTPC SIMHADRI to unloading at construction site of road projects of NHAI and ..
Emergency Replacement, Rectification and Fabrication of MS bends MS/CI pipes & Tyton/sleeve gaskets of three ash disposal lines of Stage-I during the year 2026-27 from 01/04/2026 or from date of commencement of work to 30/09/2026.
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT - 1 & 2 C&D pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2025-26
Removal of accumulated ash/ground ash from ESP Hoppers area, Buffer Hoppers area and remote silo area at ash handling plant of Stage-IV/Dr.MVR RTPP and the same ash should be transport and dumped at an ash pond area of Dr.MVR RTPP for six months. i.e., from 01.04.2026 to 30.09.2026 as and when required in the year 2026-27.