Loading…
Loading…
1,062 results • Best match
Carrying out the work for removal cleaning and re-installation of tubedek media of tube settler hoppers replacement of damaged HDPE pipe rack and strengthening of mounting structure of agitator assembly of clarifier of wet ash system of Ash Handling Plant of Stage-I SDSTPS in the year 2025-26
Carrying out the work for removal cleaning and re-installation of tubedek media of tube settler hoppers replacement of damaged HDPE pipe rack and strengthening of mounting structure of agitator assembly of clarifier of wet ash system of Ash Handling Plant of Stage-I SDSTPS in the year 2025-26
Fly Ash System-Lifting & Transportation of ash, soot etc., collected in the ESP hoppers and conveying lines of Unit-1 ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2026-27
Fly Ash System-Lifting & Transportation of ash, soot etc., collected in the ESP hoppers and conveying lines of Unit-1&2 ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2025-26
Fly Ash System-Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT # 2 A&B Pass ESP Hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2026-27
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash canals ESP I and II area canals ID fan canals Compressor House area canals and Vacuum System area canals and disposal of the same from Unit-I and Unit-II during the year 2024-25
Dr. NTTPS - Providing & Engaging of 2 No.Poclains on hire basis with engine capacity of 136HP and bucket capacity of 0.91 Cum for loading the pond ash into the vehicles at Stage-III Ash Pond for the period of one month from 01.05.2019(or actual date of commencement of work) to 31.05.2019 for 18hrs per day
Dr NTTPS providing and engaging of 3no poclains with engine capacity of 136hp and bucket capacity of 0.91 cum at 12 hrs per day for loading the pond ash into the vehicles at stage 3 ash pond for the period from 01.01.20 to 31.01.20 or one month from actual date of commencement of work
Fly Ash System-Lifting & Transportation of ash, soot etc., collected in the ESP hoppers and conveying lines of Unit-2 AB Pass ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2026-27
Removal of accumulated ash/ground ash for ESP Hoppers area, Buffer Hoppers area and remote silo area at ash handling plant of Stage-IV/Dr.MVR RTPP and the same ash should be transport and dumped at an ash pond area of Dr.MVR RTPP as and when required for the period up to 31.03.2025
Removal of accumulated ash/ground ash for ESP Hoppers area, Buffer Hoppers area and remote silo area at ash handling plant of Stage-IV/Dr.MVR RTPP and the same ash should be transport and dumped at an ash pond area of Dr.MVR RTPP as and when required for the period up to 31.03.2026.
PROCUREMENT OF SPARES OF KIRLOSKAR MAKE Instument Air COMPRESSOR2HA2TERT OF ASH HANDLING SYSTEM FOR NTPC BARH
DrNTTPS Providing and Engaging of 2no poclains on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash into the vehicles at Stage3 ash pond for the period of one month from actual date of commencement of work or from 01-09-2019 to 30-09-2019for 12hrs per day
Dr.NTTPS-Providing&Engaging of 2no poclains on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash inti the vehicles at stage-III ash pond for the period of one month from actual date of commencemnt of work or from 01-07-2019 to 31-07-2019 for 18hrs per day
Lifting and Transportation of ash, ash slurry etc., collected from the premises at bottom ash hopper area coarse ash tank area and its transporting pipe line area etc of Unit-1 of wet ash system and disposal of the same at suitable place as per the instructions of Engineer in charge during the period from the date commencement to March-2022 in the financial year 2021-22
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Procurement of Knife gate valves for Ash slurry pumps installed at Ash Handling plant of NTPC Solapur
Procurement of Slurry Sump plug gate complete assembly and its spareparts for ash handling system of NTPC KUDGI
KUDGI-Procurement of spare parts of Ash discharge valve (200 NB and 250NB)for dry ash handling system
Procurement of Charge pump 6_4 D_AH complete assembly and its spareparts for ash handling system of NTPC KUDGI
Painting of Pipes and Structures in Ash Handling System along with Supply of Painting Materials for NTPC Simhadri
Annual Maintenance Contract for Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines and transporting the same to the ash pond by trucks or tractors for a period from date of work ... in Ash Handling Plant ...
Annual Maintenance Contract for Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines and transporting the same to the ash pond by trucks or tractors for a period from date of work ... in Ash Handling Plant ...
Clearing of accumulated ash at bottom ash area, ESP area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to remote silos (except under the silos) of Stage-II and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from April 24 to Mar 25)
Clearing of accumulated ash at Bottom ash area, ESP area, along and surroundings of the ash conveying pipe line from Buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to Remote Silos (except under the Silos) of Stage-II and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from April 2023 to March 2024)
DrNTTPS providing and engaging of 2no poclains on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash in to the vehicles at stage-III ash pond for the period of one month from actual date of commencement of work or from 01-10-2019 to 31-10-2019 for 12hrs per day
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash (i.e. ESP I and II area and canals ID fan canals and area Compressor House area and canals and Vacuum System area and canals) and disposal of the same from Unit-I and Unit-II during the FY 2025-2026
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash (i.e. ESP I and II area and canals ID fan canals and area, Compressor House area and canals and Vacuum System area and canals) and disposal of the same from Unit I and Unit II during the FY 2025-2026
Procurement of Spare parts of Branch Isolation valve _200 NB and 250 NB_for ash handling system of NTPC KUDGI
SUPPLY OF MS BENDS AND PIPES LINED WITH CAST BASALT FOR ASH SLURRY DISPOSAL LINES OF ASH HANDLING SYSTEM
Procurement of 200NB MS ERW Pipes as per IS 3589 GR FE 410 for ashhandling system of NTPC KUDGI
Procurement of Complete assembly of Branch Isolation valve and its Spareparts for ash handling system of NTPC Kudgi and Ramagundam
PROCURMENT OF CAST BASALT LINED PIPES AND BENDS FOR HCSD DISPOSAL LINEAND ASH DISPOSAL LINE PASSING THROUGH HUME PIPE FOR NTPC KUDGI, SIMHADRIAND RAMAGUNDAM
Procurement of complete assembly for 450 NB Knife gate Suction valvefor ash slurry pump of ash handling system TO NTPC KUDGI
construction of compound wall for 1.8 mtr height with RCC column and flyash bricks,MS Y angles ,overhang with barbed wire.
R AND M PROPOSAL FOR EOT CRANES AND ELECTRIC HOIST IN MMOS AND ASHHANDLING AT NTPC RAMAGUNDAM
Dismantling, Fabrication and Erection of damaged 300mm M.S. ash disposal line No:I and II from sleeve joint No:92 to 124 with new MS pipe and ash disposal line-III 180 Degrees rotation from sleeve joint No:92 to 124 of stage-III inside the tunnel and clearing and cleaning of accumulated ash in the closed tunnel for the year 2025-26.
Supply of Cylinders and Seal/Repair Kits of VAAS/BRAY make BurnerIsolation Gates-BIGs and Ash Handling System for Stage-2 of NTPCSimhadri STPS
AMC for Clearing of accumulated ash slurry/ash at bottom ash area, coarse ash hoppers, coarse ash tank area and clearing of ash at ESP hoppers area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos and from intermediate silos to Remote Silos and at remote silo area (except under the silos) by stacking and loading it to the tractors and transporting to ash pond for a period from April 2025 to March 2026
Replacement of Eroded and defective LTR, ITS, Hanger feed coil tubes, carrying out D-meter survey, erection and dismantling of temporary platforms at bottom ash hopper and wherever necessary, conducting DP test for the welded joints in pressure parts, and rectification of heavily deformed ITSH coil tubes, providing of Carbon steel square rods to S panel bends, and removal and refixing of baffle plates for accessibility in LTR coils of unit 2 boiler during annual overhaul period for the year 2025-26
Replacement of Eroded and defective LTR, ITS and Hanger feed coil tubes,carrying out D-meter survey erection and dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in pressure parts and rectification of heavily deformed ITSH coil tubes providing of Carbon steel square rods to S panel bends and removal and refixing of baffle plates for accessbility in LTR coils of unit 2 boiler during annual overhaul period for the year 2023-24
Procurement of Complete assemblies BA Seal Water And Ash Slurry Pump andFlushing water pump of Sam Turbo make pump for Ash Handling System ForNTPC Vindhyachal.
Replacement of Eroded and defective ECO, LTS, LTR, HTR, HTS, ITS Hanger feed coil tubes,carrying out D-meter survey, erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary, conducting DP test for the welded joints in pressure parts,and rectification of heavily deformed ITSH coil tubes, providing of Carbon steel square rods to S panel bends,and removal and refixing of baffle plates for accessbility in LTR coils of Unit 2 boiler during nnual overhaul period for the year 2019-20
Replacement of Eroded and defective ECO, LTS, LTR, HTR, HTS, ITS Hanger feed coil tubes,carrying out D-meter survey, erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary, conducting DP test for the welded joints in pressure parts,and rectification of heavily deformed ITSH coil tubes, providing of Carbon steel square rods to S panel bends,and removal and refixing of baffle plates for accessbility in LTR coils of Unit 1 boiler during nnual overhaul period for the year 2019-20
Replacement of eroded and defective ECO LTS LTR HTR HTS ITS Hanger feed coil tubes carrying out D meter survey erection and dismantling of temporary platforms at bottom ash hopper and wherever necessary conducting DP test for the welded joints in pressure parts and rectification of heavily deformed ITSH coil tubes providing of Carbon steel square rods to S panel bends and removal and refixing of baffle plates for accessibility in LTR coils of unit-1 boiler during annual overhaul period for the year 2023-24
Replacement of Eroded and defective ECO LTS LTR HTR HTS ITS Hanger feed coil tubes carrying out D-meter survey erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in pressure parts and rectification of heavily deformed ITSH coil tubes providing of Carbon steel square rods to S panel bends and removal and refixing of baffle plates for accessibility in LTR coils of unit 1 boiler during annual overhaul period for the year 2021-22
Supply of Cylinders and Seal or Repair Kits of VAAS or BRAY make BurnerIsolation Gates BIGs and Ash Handling System for Stage-II of NTPCSimhadri STPS