Construction of 09 nos complete and 03 nos preparatory complete Isolation Stoppings (fly ash bricks) including all materials in CM panel no 5 LWS UG at Tawa 2 Mine, Pathakhera Area, WCL
Construction of 12 Nos fly ash brick Ventilation stopping and 12 Nos temporary ventilation stopping with GI sheet at LP-14 panel of Pinoura UG mine, Pinoura Sub Area of Johilla Area
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Supply, installation and commissioning of CCTV Camera including cables, Monitor, Network Video Recorder (NVR) and Hard Drive for Fly Ash Silo and Security Gate No. 02 of 210 MW ATPS, MPPGCL, Chachai.
Custom Bid for Services - Biennial job contract for maintenance of ash disposal pipelines from Surya Nala B120 to ash dyke V1 V2 V3A and V3B at ADMPipelineNTPC Vindhyachal
Procurement of Various size 300 NB, 350NB and 400NB expansion Joint and rubber gasket for ash disposal line of AHP of Unit 1 to 4 , SGTPS, MPPGCL, Birsinghpur.
Procurement of Fly Ash Intake valve 18 swing disc gate complete assembly and its Spares for AHP of 4x210 MW Unit 1 to 4 of PH I and PH II SGTPS MPPGCL Birsinghpur
Custom Bid for Services - Supply of Pond Ash from NTPC Gadarwara to Jabalpur Ring Road Pkg III Similar Category Goods Transport Service – Per KM Based Service
Procurement of stainless steel SS 304 Woven wire mesh, SS Pipe, elbow and bolts for bottom ash hoppers refractory cooling header screening system installed st AHP 2x660 MW, SSTPP, MPPGCL Dongalia
Procurement of Mounted Blade with wear plates for paddle Mixer installed at Silo in Ash Handling System of Unit no. 10 and 11 Sarni.
Procurement of White dry Non Asbestos Fibre braided packing ropes for ESP and Ash handling plant at 2X 600 MW units, SSTPP, MPPGCL, Dongalia
Procurement of Taper Plug Valves for Ash Handling Plant of Unit no 1 to 4 at PH I and II at SGTPS MPPGCL Birsinghpur
Procurement of various Spares for ash slurry disposal, recovery water pump and over flow pump of ash handling system for 210MW ATPS MPPGCL Chachai.
Procurement of spare of M/s Summits Hygronics make Dryer Model SA 075 DM installed at ash Handling plant of 2X660MW, SSTPP, MPPGCL, Dongalia
Procurement of VAAS make KnifeGate Valve without pneumatic cylinder actuator for Ash Handling plant and ESP of 1 X500MW Unit No 5 SGTPS Birsinghpur
Supply of spares for Sam Turbo make Various Drain Sump pumps installed in Ash Handling System of Unit No.10 and 11 STPS Sarni.
Procurement of critical spares of Warman (Weir Minerals) make Drain Pumps installed in Ash Handling Plant at 2x600 MW, Units of SSTPP, MPPGCL, Dongalia
Repairing of Emerson make PLC cards of Ash Handling plant of PH-I of Unit no.1 and 2, 2X600 MW, SSTPP, MPPGCL, Dongalia
Procurement of various Cast Steel Gate Valve and plug valve for Ash handling system and various auxiliaries of Turbine of 1X210MW Unit ATPS, Chachai
Procurement of various types of valves installed in Ash Handling Plant and Oil HFO and LDO Lines of Boiler at 2x600MW SSTPP, MPPGCL, Dongalia
Procurement of GTC sleeves for various pumps of ash handling system and ACW, BCW and hydrant pumps of 210 MW Units ATPS ,MPPGCL Chachai.
Procurement of V-belt and Nylon braided hose pipes for ash handling plant and TMD for Unit 1 to 4 of SGTPS, MPPGCL, Birsinghpur.
Work contract for round the clock operation and maintenance of Ash Handling System of Unit 5 at 1x 500 MW at SGTPS, MPPGCL, Birsinghpur.
Procurement of preventive maintenance spares for Atlas Copco Make Transport Air Compressor (TAC) installed at Ash Handling Plant of 2x600 MW, SSTPP, MPPGCL Dongalia.
Procurement of spares for Wilo Mather and Platt make BAHP and FAHP installed at ash handling plant 2x600 MW Units of SSTPP, MPPGCL, Dongalia.
Construction of 52 meter Brick Wall and 15 no Brick Pillars (Fly Ash Bricks) including all materials along 28DN between 20LN to 22LN Lower Workable Seam at Tawa 2 Mine, Pathakhera Area, WCL
Procurement of various size Butterfly Valves with Pneumatic Actuator and Hand wheel for dry fly ash Vacuum Lines, CT Towers, Conveying Discharge Line etc. at AHP of 1x500 MW Unit, SGTPS, MPPGCL, Birsinghpur.
Annual contract for construction of temporary approach roads from spoil material and its maintenance inside lagoon-II over dry surface to facilitate ash lifting agencies at 2x600 MW, SSTPP Dongalia.
Work of laying, extension, diversion and replacement of MSERW/MS pipes of ash disposal line, HP water lines, DCW pump lines of unit 10 and 11 of STPS Sarni
Work contract for extension,diversion and rerouting of existing 400 NB ash disposal lines in lagoon-1 and 2 at ash dyke area of 2x600 MW, SSTPP,MPPGCL,Donglia.
Procurement of spare parts of AHP i.e. Hopper Discharge Gate Bottom Ash Slurry Line Fittings , Ash Crusher , Buffer Hopper, Rotary Feeder, Drain Pit pumps etc installed at 2x660 MW , SSTPP, MPPGCL, Dongalia
Procurement of GTC Shaft Sleeve with wear ring for clinker grinder of bottom ash hopper and GTC Shaft Sleeve for Ash Slurry Pump at AHP at 2x600MW Units at SSTPP, MPPGCL, Dongalia
Procurement of spares for Eccentric Crusher suitable for DCIPS and UCC design Eccentric Crusher of Bottom Ash Hopper and Wetting unit head spares of AHP 1 X500MW Unit No 5 SGTPS Birsinghpur
Custom Bid for Services - Excavation Loading Transportation and Unloading of Pond Ash from Ash Dykes of NTPC Vindhyachal to the Abandoned Pit of Gorbi Mine of NCL
Work contract for design, manufacture, supply, erection and commissioning and trial of telescopic chute at silo of ash handling system of 210 MW ATPS Chachai
Procurement of mounted blade with wear plate for Paddle Mixer installed at Silo in Ash Handling System of Unit No.10 and 11 STPS Sarni.
Supply of bags for vent filter assembly of silo and BAG FILTER ASSEMBLY of buffer hopper for Ash Handling System of 210MW, ATPS, MPPGCL, Chachai.
Procurement for HT, MS, SS Fasteners, MS Unions and Nipples for AOH of ESP and Ash Handling Plant at 2x600MW Units at SSTPP, MPPGCL, Dongalia
Procurement of various Spares for ash slurry disposal, recovery water pump and over flow pump of ash handling system for 210 MW ATPS, MPPGCL Chachai.
Procurement spares for Mellcon make Air Dryer Job no SCL46 for instrument air system installed at ash handling plant of 2x600 MW SSTPP MPPGCL Dongalia
Procurement of spares of Mathers and Platt make HP and LP Clear Water Pump installed in Ash Handling System of 210 MW , ATPS, MPPGCL, Chachai
Procurement of Spares of Summits make Adsorption Drier Model No. SA 075 DM installed at ash handling plant of 2X660 MW Units, SSTPP, MPPGCL, Dongalia.
Procurement of spares for various pumps, installed in Ash Water Pump house of Ash Handling Plant at 2x600MW, Unit 1 and 2, SSTPP, MPPGCL, Dongalia
Procurement of spares of Gardner Denver NASH make vacuum pump Model no. CL-2002 installed at Ash handling plant at 2x600 MW, SSTPP, MPPGCL, Dongalia
Procurement of Complete set of Gardner Denver NASH make vacuum pump (model Number CL 2002) installed at Ash Handling Plant at 2X600MW, SSTPP, MPPGCL, Dongalia
Procurement of spares of drain pump of vaccum pump house and ash slurry pump house of ash handling system of 210 MW ATPS MPPGCL Chachai.
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Handling and Transport on Lumpsum Basis - Job Contract for transportation of Fly ash from Ash Silos of NTPC Vindhyachal to abandoned pit of Gorbi Mines of NCL-Reserved for SC/ST MSE Bidders only
Procurement of Piston Diaphragms and Oil seals of Frame units of M/s WEIR MINERAL make GEHO pumps model no TZPM 250G for fly ash system of Unit No. 10 and 11 STPS, Sarni.
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No