Loading…
Loading…
770 results • Best match
Annual contract work for making and maintenance of approach roads from spoil material inside Lagoon-I/II over ash surface to facilitate ash lifting agencies 2x600 MW Phase-I , SSTPP, Dongalia.
Custom Bid for Services - Construction of platforms for (fly- ash bricks including all materials) HT switches and ACBs switches at substations of Bagdona seam in underground at Tawa UG Mine, Pathakhera Area, WCL Similar Category Facility Management Services - LumpSum Based
Work of Laying, Extension , diversion and replacement of MSERW/MS Pipes of ash disposal line, seal water lines, charge pump line of Units 10 and 11 of STPS-IV, Sarni
Procurement of Spares for Greaves make gear boxes (Model-U-600) of bottom ash eccentric crusher for AHP of unit No.3and4 of PH-II, at SGTPS, MPPGCL, Birsinghpur on single offer basis.
Loading and Transportation of Pond Ash from Ash Dyke of ATPS, MPPGCL, Chachai Distt. ANUPPUR (M.P.), transporting and unloading at Sharda OC Mines, OPQR Patch Amlai Distt-Shahdol.
Procurement of mounted blade with wear plates of paddle mixer installed at silo in Ash Handling System of Unit No.10 and 11of STPS, Sarni
Purchase of different size of Bag Filters installed in Ash Handling System and in Mill Reject Handling System of Unit No. 10,11 of STPS-IV Sarni
Procurement of spares for slurry disposal pump (Model no. 12/10 FAH make indure) installed at ASH Handling Plant of 2x660MW, Stage-II, SSTPP, MPPGCL, Dongalia
Work contract for replacement of Ash Slurry Disposal Line of size 300 NB (MS ERW Pipe) for ash handling system in 1X210 MW ATPS, MPPGCL, Chachai.
Procurement of premium transmission ltd make 500 PST fluid coupling for ash slurry series installed in ash pump house of ash handling plant of STPS-IV.
Procurement of Critical spares of Premium make Gear Boxes and Premium make Fluid Coupling installed at Ash Handling Plant of 2x600 MW Units SSTPP, Dongalia Khandwa
Procurement of preventive maintenance spares for Atlas Copco make Transport Air Compressor (TAC) installed at Ash Handling Plant at 2x600 MW Units of SSTPP, MPPGCL, Dongalia.
Procurement of EIP make RF type Ash level sensing probe and electronic controller for Ash handling Plant of Unit No. 5, 1x500MW, at SGTPS, MPPGCL, Birsinghpur.
Purchase of spares for M/s.Sumitomo make Hansen Gear Box installed in HCSD Pump House of Ash Handling Plant Unit No.10 and 11 STPS Sarni.
Work contract for replacement of Ash Slurry Disposal Line of size 300 NB (MS ERW Pipe) for Ash Handling System in 1x210 MW ATPS, MPPGCL, Chachai.
Supply of Cast basalt Lined pipes and Fittings wet and dry Installed in ash discharge line of ash handling system of 210 MW ATPS, MPPGCL, Chachai.
Procurement of various size HT, MS , SS Fasteners, MS Unions and Nipples for AOH of ESP and Ash handling plant at 2x600 MW, SSTPP, MPPGCL, Dongalia
Supply of Neoprene Rubber Gasket for sleeve coupling of dry ash and wet ash conveying lines,installed in Ash Handling system for 210MW ,ATPS, MPPGCL, Chachai.
Procurement of Spares of Usha make ESP Blower Model No. UR 1150 H, installed in Vacuum Pump House of Ash Handling Plant -IV of STPS, Sarni
Procurement of spares for various pumps, installed in Ash Water Pump house Wilo Mather-Platt of Ash Handling Plant at PH I at SSTPP, MPPGCL, Dongalia
Inviting rates of construction material with complete work given below for yearly (2023-24) 1- Fly ash brick, 2- Cement Plaster, 3-Soil Excavation, 4-M-15 concrete, 5-Profile sheet, 6- M.S. Square Pipe
Construction of 5 nos. fly ash Bricks complete and prepar-atory Isolation stoppings including all construction mate-rials and stacking of construction material for completion of the preparatory isolation stopping in E8A proposed depillaring panel
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- Fly ash brick, 2- Cement Plaster, 3-Soil Excavation, 4-M-15 concrete, 5-Profile sheet, 6- M.S. Square Pipe
Procurement of Carb Clad Coated Seat and Disc of 12 inch X10 inch Diffuser Type Ash Intake Valve and Carb Clad Coated Gate Plate installed in Fly Ash Evacuation System of AHP-4,STPS, Sarni.
Hiring of JCB machine for removal and cleaning of ash from loading floor of silo ,surrounding area ,trenches outside the silo area connecting to Nallah towards forest colony and filling ash into the open dumpers for ash utilization and for shiftinmg
Procurement of solenoid valve and its spares installed in Ash Handling Plant, Mill Reject, SWAS and Chlorination system of 2x250MW, Unit No. 10 and11 STPS, MPPGCL, Sarni
Procurement of Greaves make 10.5 FCU complete fluid coupling assembly for bottom ash eccentric Crusher of AHP of Unit 1 to 4 at SGTPS, MPPGCL, Birsinghpur .As per Tender Schedule. on single offer basis.
Annual contract for O and M work to carryout fugitive fly ash/dust emission control in Lagoon I/II of ash dyke area by means of water sprinkling system at SSTPP, Stage-I, Dongalia Distt. Khandwa.
Work of construction of 07 nos. ventilation in B-1 panel and 13 nos Ventilation Stopping B-2 Panel (fly ash bricks) including all materials development district IN BWS at Tawa 2 Mine, Pathakhera Area, WCL.
Construction of 05 nos. complete ventila-tion stoppings (fly ash bricks), including all materials, and repairing of 10 nos. ventilation stoppings in the proposed P-6 Dep. Panel of LWS at Tawa-II Mine, Pathakhera Area.
Purchase of 250 Nb cast basalt lined pipe line for installation in pressure conveying line of Ash Handling Plant of unit no 10 and 11 STPS,Sarni.
Procurement of Indure make (or compatible to indure design ) complete valve assembly and spares for ash handling system at AHP-II of 2x660 MW, SSTPP, MPPGCL, Dongalia
Procurement of spares of USHA Compressors make ESP blower Model no. UR 1150 H installed in Vacuum Pump House of Ash Handling Plant of STPS-IV, Sarni.
Servicing, checking, calibration and tuning of Hitachi Hi-Rel make UPS system installed in Ash handling plant of unit no. 3 and 4, at SGTPS, MPPGCL, Brs.
Procurement of spares for transport air compressor ZA 6 for Ash handling system and main plant compressor Model ZR 145 at 210MW Unit 5, ATPS, MPPGCL, Chachai.
Procurement of various size Bray Vass make Knife gate valve (KGV) along with its spares for ash handling plant of 2x660 MW Units, MPPGCL, Dongalia Dist Khandwa
Procurement of spares and servicing of MELLCON make blower heat reactivated air dryer installed at ASH handling plant of unit no. 5, 1x500MW, at SGTPS, MPPGCL, Birsinghpur.
Procurement of neoprene rubber gasket for sleeve coupling of dry ash and wet ash conveying lines installed in Ash Handling System at 1X210MW Unit, ATPS,MPPGCL, Chachai
Procurement of Complete Rotary Segregating Valve (RSV) Assembly and Complete Material Handling Valve (MHV) Assembly for Ash Handling Plant at 2x600 MW, SSTPP, MPPGCL, Dongalia, Distt. Khandwa
Procurement of 250 NB VAAS make Knife Gate Valve without pneumatic cylinder actuator for Ash Handling plant and ESP of 1 X500MW, Unit No. 5, SGTPS, Birsinghpur
Purchaseof Spares for Sam turbo make Drain Pump and overflow pump installed in Ash Handling System of 2x250 MW Unit No. 10 and 11 of STPS, Sarni.
Modification of spur line track and developing facility for ash transportation by Rail mode-construction of RCC retaining wall and platform and auxiliary works at SGTPS Birsinghpur
Procurement of Greaves make 10.5 FCU complete fluid coupling assembly for bottom ash eccentric crusher of AHP of unit no. 1 to 4,at SGTPS MPPGCL BRS (As per Tender Schedule) on single offer basis.
Purchase of Different Size of Carb Clad Coated Seat Disc for different sizes of Valves of Nuva Feeder Carb Clad Coated Gate Plate for Branch Segregation Valve installed in Fly Ash Evacuation System of STPS-IV, Sarni.
Work contract for Replacement of existing old deteriorated ash slurry pipe and fly ash conveying lines of various size by new pipes and fittings of Unit No. 1 and 2 of AHP-I at SGTPS, MPPGCL, Birsinghpur
Construction of 11 nos. preparatory com-plete isolation stoppings (03 nos. at 12LS Dep District and 08 nos. at 37LN Dep District) using fly ash bricks, including all materials, in LWS at Tawa-II Mine, Pathakhera Area.
Work contract for round the clock operation and maintenance of Ash Handling System of Unit No. 5 at (1x 500 MW) at SGTPS, MPPGCL, Birsinghpur for three years
Procurement of 250 NB Cast Basalt Lined Pipe Line for installation in pressure conveying line of ash handling plant of Unit no. 10 and 11 of STPS, Sarni.
Work contract for Round the clock complete operation and maintenance of Ash Handling plant of Unit 1and2 at 2x600MW, SSTPP, MPPGCL, Dongalia for a period of 02 years.
Procurement of spares of EIP make RF type ash level sensing probe and electronics controller for ash handling plant at 1x500MW, unit no. 5, at SGTPS, NPPGCL, Birsinghpur.