Loading…
Loading…
770 results • Best match
Supply,Installation,Erection and Commissioning of pond Ash Conveying System along with all accessories including dewatering and recycling arrangement,Trial Operation and Work of Comprehensive Operation andMaintenance of Ash Slurry Conveying System fo
Work contract for loading, transportation of pond ash from ash dyke of ATPS, MPPGCL Chachai, Dist- Anuppur (M.P.) and unloading in low laying area for proposed Bus Stand at Nagar Palika Dhanpuri, Distt -
Annual work of watch and ward and patrolling services at HCSD and bottom ash pond of PH-IV (2X250 MW) extension Units No. 10 and 11 at 130 hectare ash bund during the year 2025-26 at STPS, Sarni.
Custom Bid for Services - 200146438 Biennial Job contract for Maintenance/Overhauling of Wet and Dry ash handling System Stage-1 (6x210 MW) at NTPC Vindhyachal Similar Category Repair and Overhauling Service
Procurement of various spares of Siemens Sinamics G130 Variable Frequency Drive Unit for motor of HCSD pump installed in Ash Handling Plant of PH-IV for EMD-IV, STPS, MPPGCL, Sarni.
Procurement of most critical spares for Instrument Air Compressors (Make Kirloskar Pneumatics Co Ltd model T BTD PM) installed in ash handling plant I units 1 and 2 SGTPS MPPGCL Birsinghpur
Work Contract for analysis of hazardous wastes and determination of dust concentration and free silica in perc in coal handling area ,ash handling area silo and mill areas of STPS Sarni
Work contract for round the clock Complete Operation and Maintenance of Ash Handling Plant of Unit 1 and 2 at 2x600 MW, SSTPP, MPPGCL, Dongalia for a period of 02 years
Procurement of Spares for Mather and Platt make Seal Water Pump Model (RN-50A), and conditioner Water Pump (RN-80) Installed at Ash Handling System of 210 MW ATPS, MPPGCL, Chachai.
Work for comprehensive annual maintenance contract for HITACHI Hi-Rel make 2x2KVA UPS system installed in ash handling plant of unit no. 3 and 4, 210 MW at SGTPS, MPPGCL, Birsinghpur.
Custom Bid for Services - Supply of Pond Ash from NTPC Gadarwara to Shahganj Bypass end to Badi PkgIV of NH146B for NTPC Gadarwara Similar Category Goods Transport Service – Per MT per KM Based Service
Handling and Transport on Lumpsum Basis - Transportation of 4.0 Lac Cum of Pond Ash from the ash dyke of NTPC Vindhyachal to the Varanasi-Ranchi-Kolkata Highway project under NHAI Varanasi through RCR mode
Procurement of Carb Clad Coated Seat and Disc for Diffuser type Ash Intake Valve installed in Nuva Feeder and Carb Clad Coated gate Plate for Branch segregation Valve installed in Fly Ash Evacuation System of Unit no.10 and 11 STPS Sarni.
Construction of 2 Nos Explosion Proof Isolation Stop-pings(Fly Ash Bricks) at Travelling dip and Haulage dip and 2 Nos. normal Isolation Stoppings at 1L between 1DE and air shaft bottom and 2DE at Chhatarpur Mine No.2, Pathakhera Area, WCL.
Work contract for pre and post monitoring work of ground water analysis at around ground water samples at various places/low lying area/abandoned mine void in four direction as proposed ash filling for enhancing utilisation of fly ash in ATPS Chachai
Procurement of spares for Suction/ Discharge valve Unit of M/s WEIR MINERAL make GEHO pumps model no. TZPM 250 are installed at silo in HCSD system of Fly Ash system of AHP-IV 2X250 MW Unit 10 and 11, STPS, Sarni.
Annual work contract for Assistance in processing of daily generation data, preparing all records related to sale of dry fly ash, estt. work in MS office format etc. and Daily cleaning, record keeping and maintenance work of office of SE(OPN)-III,
Work contract for Assistance in processing of daily generation data, preparing all records related to sale of dry fly ash, estt. work in MS office format etc and Daily cleaning, record keeping and maintenance work of office of SE OPN-III, 1X500
Procurement of spares for Suction/ Discharge valve Unit, Pulsation Diaphragms and Seal Unit of WEIR MINERAL make GEHO pumps model no. TZPM 250 installed at silo in HCSD system of Fly Ash system of AHP-IV Unit 10 and 11 STPS, Sarni.
Annual work contract for Assistance in processing of daily generation data, preparing all records related to sale of dry fly ash, estt. work in MS office format etc. and Daily cleaning, record keeping and maintenance work of office of SE OPN-III,
Purchase of spares for Suction/ Discharge Valve Unit of M/s WEIR MINERAL make GEHO pumps model no TZPM 250 are installed at silo in HCSD system of Fly Ash system of AHP-IV 2X250 MW Unit 10 and 11, STPS , Sarni.
Custom Bid for Services - Unloading of Coal from Railway Wagons Trucks in the Yard Feeding of Coal from Yard to main Hopper Screens of Coal Handling Plant And Shifting of Bed Ash Fly Ash from Silos to Ash Pond for 1227 MW CPP
Hiring of one no. air conditioned JeepCategory SUV wih engine capacity up to 1500 CC for (Diesel Version) total mileage 2000 KM per month for E.E.(BMD OS)III and EE(Fly ash), at SGTPS, MPPGCL, Birsinghpur For period of 2 year
Operation And Maintenance Of Other Machines And Plants - 200153058 Comprehensive O and M Contract for Operation Mechanical Electrical and C and I Maintenance for STG 4 Ash Handling System in NTPC Vindhyachal
Procurement of Package of AC of 5.0 TR Capacity along with installation and commissioning for ESP field controller room of ash handling plant at unit no. 1 to 4, SGTPS, MPPGCL, Birsinghpur
Procurement and installation of air cooled package AC of 8.5 TR Capacity with required accessories for control room of Ash handling plant 2X210MW Unit No.3 and4,PH-II, SGTPS, MPPGCL, Birsinghpur.
Procurement of Critical and consumable Spares of M/s Swam make Air Blower for ESP area and Silo area installed at Ash Handling Plant at 2x600 MW Units of SSTPP, MPPGCL, Dongalia.
Procurement of spare for Indure make Rotary Feeder (Assy. No-A-199-S) and Hydro Mixture Dust Conditioner (Assy. No-A-435) of ash handling system at AHP-II 2x660MW SSTPP, Dongalia.
Procurement of critical and consumable spares of M/s SWAM make air blower for ESP Area and silo Area installed at Ash Handling Plant at 2x600 MW, Units of SSTPP MPPGCL, Dongalia
Supply installation and commissioning of latest PAC system RX3i to upgrade existing PLC system series 90-30 and HMI scada at ash handling of 1x500 Mw unit no 5 SGTPS MPPGCL Birsinghpur
Procurement of spares of GE IP ( Now Emerson) make PLC system installed at ASH Handling Plant , MRHS, HVAC, Fire Fighting and DM olant of Unit No.5, 500 MW, SGTPS, MPPGCL, Birsinghpur
Construction of Approach Road of various facilities of Gadarwara PlantBy ASH UTILIZATION PROCESS
Custom Bid for Services - Biennial Job Contract for Maintenance Rotation Replacement of Ash Disposal Pipelines and Cast Basalt Pipe Replace Work at NTPC VSTPS in Shahpur P3 Area Similar Category Operation and Maintenance Power House/Power Plant
Procurement of various spares of Ash Handling Plant and MRS PLC System, 5 and 20 KVA UPS, Pulse Jetting System and GEHO Pump installed at PH-IV for IMD-IV, STPS, MPPGCL, Sarni
Work contract for round the clock complete operation and maintenance of Ash Handling System of Unit 1 to 4 (4 x 210 MW) of PH-I and PH-II at SGTPS, MPPGCL, Birsinghpur
Work contract for round the clock complete operation and maintenance of Ash Handling System of Unit 1 to 4 (4 x 210 MW) of PH-I and PH-II at SGTPS, MPPGCL, Birsinghpur
Procurement of 3 inch double acting equalizer valve complete assembly and its spares equivalent to existing indure make 3 inch equalizer valve for Ash Handling Plant at 2X600 MW of SSTPP, Dongalia, Khandwa
Excavation, loading of pond ash from 111 hectare Ash pond of STPS Sarni and its transportation an unloading at designated locations of Construction of 4 laning of NHAI road project of Budhni to Shahganj bypass end.
Work contract for consultancy services for preparation, submission and approval of DPR, ESP, detailed Engineering, cost estimation etc for Transportation of Fly/Pond Ash through Rail from PSSS siding of Shri Singaji Thermal Power Project, Khandwa
Protection work of ash dyke between the chainage- 400 meter to 600 meter from course changing nallah running parallel to main ash dyke of bottom ash pond at 130 hectare ash pond of Unit no.10 and 11, 2x250 MW at STPS, Sarni.
Custom Bid for Services - Unloading of Coal from Railway Wagons Trucks in the Yard Feeding of Coal from Yard to main Hopper Screens of Coal Handling Plant And Shifting of Fly Ash Bed Ash from Ash Silos to Ash Pond for 1227 MW CPP
Construction of 10 Nos of fly ash bricks ventilation stoppings for making of 04 Nos. of Battery Charging Station in underground, 02 Nos for proposed depillaring panel CM-12 and other 02 Nos. for proposed depillaring panel CM-13 in L-1B seam in easter
Inviting rates of construction material with complete work given below for Yearly.(2022-2023) 01-Fly ash brick 02- Cement Plaster 03-Profile sheet 04-Soil Excavation work 05- M-15 Concrete 06- Kota Stone,07-Marble Stone,08-Granite Stone.09-Flag Stone
Work contract for Round the clock complete operation and maintenance of Ash handling system and its auxiliaries of unit 1 and 2 at 2x600 MW, SSTPP, MPPGCL, Dongalia for a period of two years.
Custom Bid for Services - Deployment of HSW manpower for assistance & supervision in maintenance of ash handling system of stage-1 to 5 of NTPC Vindhyachal Similar Category Operation and Maintenance Power House/Power Plant
Work contract for Round the clock complete operation and maintenance of Ash handling system and its auxiliaries of unit 1 and 2 at 2x600 MW, SSTPP, MPPGCL, Dongalia for a period of two years
Biennial work contract for availing service of expert engineer for servicing / overhauling of Transport Air compressor ZA6H of make Atlas copco. (2x250MW) Unit No. 10 and 11 Ash Handling Plant of STPS, MPPGCL, Sarni.
Work contract for Round the clock operation and maintenance of Ash Handling system and ESP (Operation and Routine/ Preventive Maintenance) of Unit 3and4 at 2x660 MW, SSTPP, Dongalia for a period of 24 months
Procurement of Rotary segregating valve and 3 inch double acting equalizer valve complete assembly along with Pneumatic cylinder equivalent to indure make for Ash handling plant at 2X 600 MW units, SSTPP, MPPGCL, Dongalia
Procurements of spares for Indure make material handling valve (MHV) (As per Drawing Assembly No I-5036-M-EQ-SM-15) of Ash handling system installed at AHP of 2x660 MW, SSTPP, MPPGCL, Dongalia