Loading…
Loading…
255 results • Best match
Annual contract for operation and maintenance work of 4x1200 MT RCC main silo system, weigh bridge and management for disposal of dry fly ash at KaTPP, RVUNL, Jhalawar
Supply, Installation, Testing and Commissioning for Up-gradation of M/s. GE make series 90-30 PLC of Fly Ash 3and4 and DM Plant-I, CTPP (OandM), Chhabra
Annual contract for operation and maintenance work of 4x1200 MT RCC main silo system, weigh bridge and management for disposal of dry fly ash at KaTPP, RVUNL, Jhalawar.
Excavation and Loading of Pond Ash from ash dyke of various coal based power plants located at Kota, Suratgarh, Chhabra and Jhalawar
Capital, Routine and Breakdown Maintenance of Pumps and Ash Disposal Lines up to Ash Dyke of Stage-I To V of KSTPS, Kota
Work of scraping and removal of flyash deposited on road sides at various locations in plant premises of CTPP, Chhabra
Supply of Pneumatic cylinders and solenoid valves and its spares for wet fly ash evacuation system and for sluice gate of Bottom for Stage I, AHP, SSTPS, Suratgarh
The work of Operation and maintenance of complete dry fly ash system Dense Phase System of unit 1 to 5 stage I II and III of STPS RVUNL Suratgarh
Supply of Submersible Slurry pump with motor for Ash handling system and CA of Unit 5 and 6 of CSCTPP Chhabra
Annual Contract for operation and maintenance work of entire Ash Handling System of Unit 1 and 2 (2x600MW) KaTPP RVUNL Jhalawar
Annual contract for operation and maintenance works of entire ash handling system of Unit- 1 and 2 (2x600MW) KaTPP RVUNL Jhalawar
Steel Structure Painting work of MPH building, boiler structure, bunker building, bottom ash hopper and ESP area of unit 1, 2, 3 and 4 at KSTPS, Kota
Annual contract for operation and maintenance work of 4x1200 MT RCC main silo system operation of weigh bridge and management for disposal of dry fly ash at KaTPP RVUNL Jhalawar
Annual contract for operation and maintenance work of 4x1200 MT RCC main silo system, operation of weigh bridge and management for disposal of dry fly ash at KaTPP, RVUNL, Jhalawar
Comprehensive O and M Contract of entire Ash handling system including silos of Unit 1 and 2 (2x600 MW) KaTPP RVUNL Jhalawar
Repairing/reconditioning of Clinker Grinder drum sub assembly with segment Plate of Ash Handling Plant-II (Unit 3 and 4), KSTPS, Kota
Repairing/reconditioning of Clinker Grinder drum sub assembly with segment Plate of Ash Handling Plant-II (Unit 3 and 4), KSTPS, Kota
Sale/collection of ESP Dry Fly Ash generated from Chhabra thermal Power Plant unit 1 to 4 (1000 MW) and Chhabra Supercritical Thermal Power Plant unit 5 and 6 (1320 MW)
Repairing/reconditioning of Clinker Grinder drum sub assembly with segment Plate of Ash Handling Plant-II Unit 3 and 4, KSTPS, Kota
Supply of spares of M/s Intervalve Poonawala make butterfly valves of CPU and Ash Handling Plant of 2x660 MW, CSCTPP,RVUNL,Chhabra
Supply of Aftercooler for transport air compressor (Model- NO- ZA-6C) installed at Ash handling system of Unit 5 and 6 of CSCTPP Chhabra
Comprehensive O and M contract of entire Ash handling system including DFA storage silos of Unit 1 and 2 (2x600 MW) KaTPP RVUN Jhalawar
Refurbishment Revival Reconditioning Repair and commissioning of Transport air compressor No.2 installed at Ash handling System of Unit 5 and 6, CSCTPP, Chhabra
Annual contract for routine, breakdown maintenance work and providing assistance in operation of complete Ash Handling System of Unit-7and8 (2x660MW), SSCTPS, RVUNL, SURATGARH
ANNUAL RATE CONTRACT FOR SUPPLY OF SPARES OF MACAWBER BEEKAY MAKE FOR ASH HANDLING PLANT UNDER PROPRIETARY CATEGORY FOR VARIOUS POWER PLANTS OF RVUN
Annual contract for lifting and transportation of fly Ash from 4x1200 MT RCC main silos of Unit 1 and 2 (2x600MW) to KaTPP ash dyke or any designated place at KaTPP, RVUNL, Jhalawar.
Annual contract for lifting and transportation of fly ash from 4x1200 MT RCC main silos of unit 1and 2 (2x600)MW to KaTPP ash dyke or any designated place at KaTPP RVUNL Jhalawar
Supply, Erection, Testing and Commissioning/ Up gradation work of GE Fanuc (presently known as Emerson) make PLC system installed for dry fly ash evacuation system of Unit 6, AHP- IV, STPS, Suratgarh
Supply of spares for solenoid valves for wet ash evacuation and dense phase dry ash handling system at AHP Unit 1 to 6, SSTPS, Suratgarh
Annual Comprehensive O and M Contract of entire Ash handling system including silos and ESP of Unit 1 to 6 (6X250 MW), STPS, RVUN, Suratgarh
Annual Comprehensive O and M Contract of entire Ash handling system including silos and ESP of Unit 1 to 6 (6X250 MW), STPS, RVUN, Suratgarh
Custom Bid for Services - NLCIL BTPS AHS Transportation of Fly Ash Accumulated Spillage Ash from Silos of BTPS to Mines Dumping Yard for the period 2024 25 Similar Category Goods Transport Services - Per MT
Annual work contract of Stack monitoring, Ambient Air Quality monitoring, meteorological data monitoring, Trade Effluent analysis, Sewage water treatment analysis, Ground water analysis, Canal water analysis, Coal and bottom ash analysis at SSCTPP
Annual work contract of Stack monitoring, Ambient Air Quality monitoring, meteorological data monitoring, Trade Effluent analysis, Sewage water treatment analysis, Ground water analysis, Canal water analysis, Coal and bottom ash analysis at SSCTPP.
Annual contract for repair, reconditioning of various components installed at Ash Handling Plant, DM plant and CW, ACW Plant of Unit 5 and 6, CSCTPP, Chhabra
Annual contract for Conveyor Belt Jointing, Laying, Removing Work and Rubber Lagging of Conveyor Pulleys in Ash Handling Plant of Unit 1 to 4, CTPP, Chhabra
Annual contract for Conveyor Belt Jointing, Laying, Removing Work and Rubber Lagging of Conveyor Pulleys in Ash Handling Plant of Unit 1 to 4, CTPP, Chhabra
Annual contract for Routine, breakdown maintenance work and providing assistance in operation of complete Ash Handling System of unit 7 and 8, STPS-SC, RVUNL, Suratgarh.
ANNUAL RATE CONTRACT (ARC) FOR SUPPLY OF SPARES OF MACAWBER BEEKAY MAKE SPARES FOR ASH HANDLING PLANT UNDER PROPRIETARY CATEGORY FOR VARIOUS POWER PLANTS OF RVUN
Annual contract for Conveyor Belt Jointing, Laying, Removing Work and Rubber Lagging of Conveyor Pulleys in Ash Handling Plant of Unit 1 to 4, CTPP, Chhabra
Annual contract for work of Operation and Maintenance of Ash Handling System of Unit 1,2,3 and 4 (4x250MW) Stage-I, Phase-I and II, CTPP, Chhabra
SUPPLY OF OBSOLETE/MATURED PHASED ITEMS OF THE GE FANUC MAKE 90-70 SERIES PLC FOR ETS and TURNING GEAR SYSTEM AND 90-30 SERIES PLC FOR METS AND FLY ASH SYSTEM AT KATPP, JHALAWAR
Custom Bid for Services - NLCIL-BTPS-Collection and Conveyance of Bed/Fly ash from BTPS to BLM by engaging Tipper/Dumper and JCB for the year 2026-2028 Similar Category Collection & Disposal Waste Management Service
Supply and Erection, Testing and Commissioning of twin lobe air blowers with associated items for ESP fluidizing system for wet ash disposal system, AHP Unit 1 to 4, STPS, RVUNL, Suratgarh
Routine Breakdown capital Maintenance works of 2 X 250 MW Unit 3 4 Ash Handling Plant System and Various Pumps of Stage II at SSTPS, RVUNL, Suratgarh
Refurbishment or Revival and Reconditioning and Repair and commissioning of Transport air compressor No.1 installed at Ash handling System of U 5 and 6, CSCTPP, Chhabra
SUPPLY OF AFTERCOOLER FOR TRANSPORT AIR COMPRESSOR (Model-No-ZA-6C) INSTALLED AT ASH HANDLING SYSTEM OF U 5 and 6 OF 2X660 MW, CSCTPP, RVUNL CHHABRA
Annual contract for repair / reconditioning of various components installed at Ash Handling Plant, DM plant and CW/ACW Plant of Unit 5 and 6(2x660MW), CSCTPP, Chhabra
Supply of spares for double stage helical speed reducer gear box for clinker grinders installed at ash handling plant U - 1 AND 2 stage- I, SSTPS, Suratgarh
Supply of Vent Filter bags and bag retainer with ventury assembly for intermediate silo and RCC silo of Ash Handling System of Unit 5 and 6 CSCTPP Chhabra