Loading…
Loading…
7,532 results • Best match
Re organisation of Ventilation system in RVIIIB1 Seam to course air to the proposed continuous miner district in RVIIIB1 Seam and RVIIIT12 Seam by construction 49 nos fly ash ventilation stopping
Construction of 30 2BHK rural house with RCC Colomns and Fly ash brick Masonry of 560 Sqft Plinth Area in Buduga Jangala colony H/o Ammapuram (V),Thorrur(M) ,Mahabubababad (Dist.)
Construction of (15) 2BHK Rural Houses in Thurka Dinne (V), Kodair (M) in Nagarkurnoo District, Telangana with Columns and Fly ash solid cement blocks of 560 Sqft Plinth area (2nd Call).
Construction of 20 2BHK rural house with RCC Colomns and Fly ash brick Masonry of 560 Sqft Plinth Area in Ramoji thanda H/o Gantla kunta(V),Peddavangara(M) ,Mahabubababad (Dist.)
Sale/collection of ESP Dry Fly Ash generated from Chhabra thermal Power Plant unit 1 to 4 (1000 MW) and Chhabra Supercritical Thermal Power Plant unit 5 and 6 (1320 MW)
MTPS-I M II OAHS FAM PDFACS Cleaning removal of spilled and dumped ash in fly ash dumping yard near silos and along both sides of the road from silo area
Collection and transportation of dry fly ash from Neyveli Lignite Corporation India Limited Cuddalore District / NTPL Thermal Power Station Tuticorin, Tamil Nadu to Malabar Cements Limited Walayar / CGU, Cherthala, Kerala State
Washing, Cleaning, Disinfecting of pipe line network from Podder Fruit and Vegetables to Laxmi fly ash brick manufacturer and pipe line towards WBIIDC office at Coochbehar I.Park, Chak-Chaka, Coochbehar-736156.
Shifting of Electrical Utilities from Angul-Kalamchuin Road from Town High School to Sandhagali Pragatinagar, Section-I, Pragatinagar to Derjanasahi, Kumanda, Section-3, Ganapati Fly Ash to Kuio, Koshala Section, Angul.
Construction of 6nos. complete isolation stoppings (fly-ash bricks) including all con-struction materials in proposed depillaring CM panel E7 of Bagdona seam at Tawa UG Mine of Pathakhera Area, WCL.
Construction of 2BHK houses(60 Nos with G+2 Pattern) with RCC columns, flyash brick masonary at Sheshammagudem Nalgonda(urban) Nalgonda dist
Construction of 2BHK Houses (40Nos) with RCC columns and flyash brick masonary at Vibhalapuram(V) of Mothey(M), Kodad Constituency, Suryapet dist
Construction of 2BHK Houses(40 Nos) with RCC Columns and flyash brickmasonary in Ravipahad(V) of Mothey(M), Kodad Constituency, Suryapet dist
Construction of 2BHK houses(40 Nos) with RCC columns and flyash bricks at Akupamula(V) of Munagala(M), Kodad Constituency, Suryapet Dist
Construction of 2BHK Houses(40 Nos) with RCC columns, flyash brick masonary at Sripuram(V) of Nadigudem(M), Kodad Constituency, Suryapet dist
Goods Transport Services - Per MT - Coal/Ash, Transportation of Bottom Ash from NTPC, Mouda to Kandri Mine and un-loading at Site as directed by the Mine; Tipper/Dump Truck; Medium Tipper, Goods Transport Services - Per MT - Coal/Ash, Transportation ... of Bottom Ash from ...
Excavation, loading of Pond Ash from Ash Dyke of SSTPP and transportation for Filling of abandoned Stone quarry by ash situated at Bhavsinghpura Distt. Khandwa.
Custom Bid for Services - Publication of Expression of Interest (EOI) in Newspapers for lifting of Pond Ash from Ash Dyke Similar Category Advertisement Service - Magazine
Custom Bid for Services - Low lying area Development by filling Pond Ash from NSPCL ash dykes Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Installation of Weighbridge near Ash Gate for Pond Ash Weighment NSPCL Rourkela Similar Category Operation and Maintenance Power House/Power Plant
KPPL/COML/DISP/13
Custom Bid for Services - Contract for Excavation loading transportation of Pond Ash or fly ash of 15 LMT from NTPC LARA to unloading at Low lying areas or Stone mine eg abandoned stone quarry or mine located in the range of 100 to 150 and 150 to 20.. Similar Category Goods Transportation service - Monthly Based Service Goods Transport Service – Per MT per KM Based Service Goods Transport Service – Per KM Based Service Goods Transport Services - Per MT Handling, Transport and Other Mining Services - Percentage quote based
TTPS Mech II AHP Unit II Breakdown maintenance of ECO and APH hoppers ash disposal system for the period from 01 04 2023 to 31 03 2024
REPAIR and MAINTENANCE OF ASH DISPOSAL PIPE LINES, RECLAMATION LINES, and PROCESS LINES, RED MUD POND PIPE LINES ETC. OUTSIDE THE ALUMINA PLANT BOUNDARY AT NALCO, DAMANJODI
REPAIR AND MAINTENANCE OF ASH DISPOSAL PIPE LINES, RECLAMATION LINES, PROCESS LINES, RED MUD POND PIPE LINES ETC. OUT SIDE THE ALUMINA PLANT BOUNDARY AT, NALCO, DAMANJODI
Emergency Replacement, Rectification and Fabrication of MS bends MS/CI pipes & Tyton/sleeve gaskets of three ash disposal lines of Stage-I during the year 2023-24.
TTPS Mech II AHP Unit I Breakdown maintenance of ECO and APH hoppers ash disposal system for the period from 01 04 2023 to 31 03 2024
TTPS Mech II AHP Unit III Breakdown maintenance of ECO and APH hoppers ash disposal system for the period from 01 04 2023 to 31 03 2024
Rotation and Replacement with Painting of BA Slurry/Silo Slurry/BAOTP and Ash Disposal Line for upcoming OH of Unit -5 for AHP (M/M) Dept.,STPS.
Emergency replacement, Rectification and fabrication of MS bends, MS/CI pipes & Tyton / sleeve gaskets of three Ash disposal lines of Stage-I during the Year 2018-2019.
Anticipated breakdown rectification and maintenance works to be carried out on 3nos ash disposal lines of Stage-II as and when required during the year 2020-21.
Anticipated breakdown rectification and maintenance works to be carried out on 3nos ash disposal lines of stage II as and when required during the year 2025 26
Emergency Replacement, Rectification and Fabrication of MS bends MS/CI pipes & Tyton/sleeve gaskets of three ash disposal lines of Stage-I during the year 2023-24.
Anticipated breakdown rectification and maintenance works to be carried out on 3nos ash disposal lines of stage II as and when required during the year 2024 25
Emergency Replacement, Rectification and Fabrication of MS bends MS/CI pipes & Tyton/sleeve gaskets of three ash disposal lines of Stage-I during the year 2024-25.
Regular and shift maintenance of Electrical system and equipment of Inside Power House Coal Mill and Ash handling plant at CTPS DVC for three months
Construction of new fly ash brick masonry boundary wall in place of damaged RCC post and barbed wire fencing in A2 to A5 officer quarters in upper colony area at ATPS Chachai
MTPS I OAHS BAHStage I Overhauling of Scrapper Feeders 1A1 1B1 in Bottom Ash Hopper Unit I and also fabrication of 300NB Economizer Hopper Drain line bend for Unit I
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of Worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
Rectification Works to the damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to Mill Plant Operator Room South from CH 0m to CH 90m in Unit 4
Erection of (two tier) walkway of total pressure conveying line, bottom-ash,ash slurry line and LP or HP water line including handrail and foot guard of unit-6, STPS.
Work proposal for Widening and raising of existing partition bund and construction of approach road toward south end for lifting the bottom ash from Ash dyke-II at SGTPS Birsinghpur.
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
Design Engineering consultancy service for the refurbishment of Bottom Ash Hopper below Boiler at 2X600MW Singareni Thermal Power Plant with respect to Mechanical arrangement and structural stability point of view.
Loading, Transportation and Delivering of Bottom Ash from NTPC Kundanapally & STPP to GDK.1&,3, GDK-2&2A Inclines, VKP and GDK7 LEP mines for a period of two Years.
Loading, Transportation and Delivering of Bottom Ash from NTPC Kundanapally & STPP to GDK-1 & 3, GDK-2 & 2A Inclines, VKP and GDK7 LEP mines for a period of two Years.