Loading…
Loading…
7,532 results • Best match
Procurement of Critical spares of kirloskar make Clear Water pump installed at Ash Handling Plant at 2x600 MW Units, SSTPP, MPPGCL, Dongalia
Procurement of Knife Edge gate valves, Pneumatic actuator and seal kit of actuator for ash handling system of 210MW, ATPS, MPPGCL, Chachai
TTPS Cleaning the roof tops of various buildings such as power house, ash handling, boiler, bunker, ESP 4 and 5 control room
Custom Bid for Services - Biennial Manpower contract for Operation of Ash Handling System of StageII at NTPC LTD Muzaffarpur Thermal Power Station
Custom Bid for Services - BMC for Routine Breakdown maintenance of Dry Wet Ash Handling system of Stage III U9 10 NTPC Vindhyachal
Custom Bid for Services - Comprehensive contract for Operations Maintenance Mechanical Electrical and CI for Ash Handling Plant StageV 1x500 MWat NTPC Vindhyachal
Custom Bid for Services - Mega Contract for Operation and maintenance of Ash handling system in 3x660MW NTPC NORTH KARANPURA for 1 Year
Custom Bid for Services - MEGA CONTRACT FOR ASH HANDLING SYSTEM OF NTECL VALLUR Similar Category Operation and Maintenance Power House/Power Plant
Fly Ash Bricks as per IS 13757, IS 12894 (Q3), Material and supply in replacement of flame proof 120Watt LED lights with cast iron housing complete with all accessories and connections all as specified and directed., S and F LED street light 90 Watt with highly optimised and efficient lighting distribution made from Die cast aluminum housing high power ceramic LEDs, S and F LED streetlight 120Watt made up of pressure die cast aluminium housing with toughened glass and high power LEDs and secondary lenses, S and F LED streetlight 30Watt made up of pressure die cast aluminium housing with toughened glass and high power LEDs and secondary lenses, Supply and fixing LED Post Top lantern 40W long life aesthetically designed with symmetrical light distribution spun aluminium landscape, High efficient LED flood light of 120W Capacity with lens made of pressure dia cast aluminum housing extruded aluminum heat sink, M and L for LED Bollard with robust design and efficient light 10Watt IP65 Rated including with foundation work and connections all as specified and directed., Supply and fixing street light junction box insulated and made out of environment friendly recyclable UV resistant halogen and silicon free with glass fiber reinforced, Supply and fixing of nature switch using infrared sensor technology based automatic street light control panel. The panel should be suitable enough to take 3 phase load
Rectification Works to the Damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to ESP 5 North side from CH 0m to CH 80m in Unit 5
AHP Dn UNIT III (COH) work A Pass Renewal of existing corroded and damaged Bottom Ash Hopper Seal Trough supporting structure and seal Trough approach platform during capital overhaul
Procurement of M/s Veljan Hydrair make Hydro-Pneumatic Cylinder and its spares for sluice Gate installed in bottom ash hopper of Unit No. 10 and 11, STPS, Sarni.
SERVICE CONTRACT FOR OH and MAINT WORKS OF ASH SLURRY PUMPS,ASH WATERPUMPS ,AIR COMPRESSORS,AWRS ,DRAIN SEPARATION AND BOTTOM ASH OF ASHHANDLING SYSTEM, SIPAT-STAGE I and II
NCTPS II 2 X 600 MW M II circle AHP Division Unit I II BAHS Disposal of generated semi wet bottom from the bottom ash silo I and II
KTPS-V&VI Stages-Civil-O&M-I-Modification of unit -IX UPS and SWAS room and bottom ash panel room of Unit-IX boiler of KTPS-V Stage.
TTPS MechII AHP Painting of Unit II Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during the forthcoming annual overhaul
TTPS Mech II AHP Painting of Unit III Bottom ash hopper body plate and its connected structural supports from 0mtr to 6 mtr EL during annual overhaul 2025 26
SUPPLY AND DELIVERY OF ECCENTRIC CRUSHER COMPLETE ASSEMBLY WITH FEED SUMP FOR BOTTOM ASH HOPPER FOR OH OF UNIT 5 UNDER AHP M M FOR KOLAGHAT THERMAL POWER STATION
SUPPLY OF CAST BASALT SPECIALS FOR MAINTENANCE OF SERIES I AND SERIES - II BOTTOM ASH PIPE LINES FROM PLANT MAIN GATE TO DISCHARGE POINTS IN ASH POND OF SDSTPS
Custom Bid for Services - Transportation of Bottom Ash and slag clinkers and area cleaning in zero meter level from Boiler areas of Units 1 and 2 in TSI Expn
Custom Bid for Services - 200141009 Garlanding of Bottom ash lagoon-2 of ash dyke through 450NB MS pipes NTPC Gadarwara Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Engagement of man power for one time replacement of BADL ADL CAL for better utilization evacuation of fly and of bottom ash at AHPDSTPS Andal
Custom Bid for Services - CRN 4464 Performance Audit of Compressed Air System in Ash handling area Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Spares-100256931_ITEM_10_M5659106023, ITEM_20_M5659106025, ITEM_30_M5659106032, ITEM_40_M5659106022, ITEM_50_M5659106038, ITEM_60_M5651026001, ITEM_70_M5659106042, ITEM_80_M5659106043, ITEM_90_M5659106037, ITEM_100_M5659106029, ITEM_110_M5659106046, ITEM_120_M5659106048, ITEM_130_M5659106049, ITEM_140_M2038710214, ITEM_150_M1980693600
BAH-100260226_ITEM_10_M5656046020, ITEM_20_M5656046019, ITEM_30_M5656046018, ITEM_40_M5656046017, ITEM_50_M5656046027, ITEM_60_M5656046028, ITEM_70_M5656046026, ITEM_80_M5656046022, ITEM_90_M5656046001, ITEM_100_M5656046002, ITEM_110_M5656046009, ITEM_120_M5656046029
Procurement of different types of spares for wet ash handling system of stage 2 and 3 at GGSSTP Ropar.
Custom Bid for Services - 200139211 Two Year Contract for Manpower Deployment and Hiring of JCB and Tractor for running the Ash Utilization activities at NTPC Mouda Similar Category Operation and Maintenance Power House/Power Plant
Fly Ash Bricks as per IS 13757, IS 12894 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6514649 Dated : 30-07-2025 Bid Document 1/8 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Fly Ash Bricks as per IS 13757, IS 12894 (Q3), Disconnecting dismantling of water cooling coil from AHU for replacement of the same carefully and replacement of water coil, Material and labour for water cooling coil 8RD capacity 50TR 19000CFM all as specified and directed, Supply erecting and fixing air duct made out of galvanized sheet 22 gauge insulated with fiber glass 50 mm thick, Supply and installation of Hygrometer digital type complete all as specified., Supply fixing and replacement of PCB alongwith all accessories as per existing model sample suitable for cooling tower, Supply and fix MCCB Moulded case circuit breaker 4Pole 415V fixed thermal and magnetic release 100Amps, Supply and fix MCCB Moulded case circuit breaker 4Pole 415V fixed thermal and magnetic release 125Amps, Supply and fix MCCB Moulded case circuit breaker 4Pole 415V fixed thermal and magnetic release 63Amps with breaking capacity 25KA, Disconnecting cutting and taking out unserviceable sealed unit compressor of package type Air conditioner 5.5 Ton capacity, Supply only with provision of clean exchange of unserviceable compressor, Disconnecting cutting and taking out unserviceable sealed unit compressor of package type Air conditioner, Supply only with provision of clean exchange of unserviceable compressor removed against item 39.00 here in before, Disconnecting cutting and taking out unserviceable sealed unit compressor of package type Air conditioner 12.50 Ton capacity, Supply only with provision of clean exchange of unserviceable compressor removed against item 41.00 here in before
AHP Dn Unit-II Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months 2023 24 from the date of taking over of site or Completion of quantity whichever comes earlier
Repairing/reconditioning of Clinker Grinder drum sub assembly with segment Plate of Ash Handling Plant-II (Unit 3 and 4), KSTPS, Kota
Repairing/reconditioning of Clinker Grinder drum sub assembly with segment Plate of Ash Handling Plant-II (Unit 3 and 4), KSTPS, Kota
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance to the Ash silo s for arresting the ash leakage in Fly ash silo using PU grouting at NCTPS II
Supply of materials for Const. of Guard Wall and Boulder Patching Work at Dahi Khal near Fly Ash Brick Factory (Part-A) of Nayagram GP No-07 under Nayagram Panchayat Samity
Work contract for Replacement of existing deteriorated fly ash conveying line, ash slurry line and seal water line with new pipes of Unit No. 3 and 4 at SGTPS, MPPGCL, Birsinghpur
Construction of 6 Nos Sub Station and 3 No. Miner/Rest Station for different Panel in UG by fly ash brick in 4A seam at Jhiria UG mine of Hasdeo Area
Construction of 6-six) Nos Fly ash Bricks (0.35m Thick) Ventilation Stopping in RVIIA Kenda (Seam) at 5th L North SDL Dev Dist No 2 Pit TLB Unit of Tilaboni Colliery
Construction of 12 Nos 0.5m thick fly ash sectionalization stopping in RVIIB Seam in between 4R-5R from 2L-13L of No 3 and 4 Pit unit of Kumardihi A Colliery
Final sealing for 7no isolation stopping at 54LS, 56LS, 57LS drift and surrounding 55L/2R staple pit by fly ash brick in 4A seam at Jhiria Ug Mine of Hasdeo Area
Construction Of Box Culvert And Pipe Culvert From Aherwadi To NTPC Fly Ash Tank Bund Duct Tiliehal Road VR No 35 Ch No 0 00 To 1 100 Tal South Solapur
COLLECTION AND TRANSPORTATION OF DRY FLY ASH FROM NEYVELI LIGNITE CORPORATION INDIA LIMITED (NLC) NEYVELI, CUDDALORE DISTRICT TAMIL NADU STATE TO MALABAR CEMENTS LIMITED WALAYAR ,PALAKKAD/ CEMENT GRINDING UNIT, PALLIPURAM , CHERTHA
MTPS I O AHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system Unit II MTPS I till the period to dispose quantity of 105000 MT Phase II
Supply of materials for Const. of Guard Wall and Boulder Patching Work at Dahi Khal near Fly Ash Brick Factory (Part-B) of Nayagram GP No-07 under Nayagram Panchayat Samity
Modification of Fly Ash Transport Lines Conveying Lines by removal of sleeve couplings and welding of same at AHP of unit 1 and 2 at 2x 600 MW, SSTPP, MPPGCL, Dongalia.
COLLECTION AND TRANSPORTATION OF DRY FLY ASH FROM NEYVELI LIGNITE CORPORATION INDIA LIMITED (NLC) NEYVELI, CUDDALORE DISTRICT THAMIL NADU STATE TO MALABAR CEMENTS LIMITED WALAYAR ,PALAKKAD/ MCL CEMENT GRINDING UNIT , CHERTHALA,
Construction of 05 Nos of 2BHK Rural Houses with RCC Colomns and Fly ash brick masonry of 560 Sqft plinth area in Jamasthanpur(V), Thorrur(M), Mahabubabad(Dist.) for 4th call
Procurement of level switches installed in Air handling units of HVAC system and level sensing probes installed in unloading spouts of fly ash and HCSD silos at STPP, Jaipur, Mancherial, Telangana.
Supply of Pit material like fly ash bricks and metal to GDK-1&3, GDK-2&2A Inclines for the year 2017-18 in RG.I Area, Godavarikhani, Peddapalli Dist., Telangana State.
MTPS I O AHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system Unit I MTPS I till the period to dispose quantity of 105000 MT Phase II
MTPS I M II OAHS PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit III MTPS I ash quantity of 105000 MT