Loading…
Loading…
7,532 results • Best match
Construction of 8 nos 0.5 m thick Fly ash Sectionalization stopping in between 1314L/4D-1D, 0D-1D/14L, 0D/1415L and 3ND-1ND/15-16L in RVIIB Seam at No 3 and 4 Pit unit of KUMARDIHI A Colliery
TTPS Operation Circle MPM I Unit II Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot etc.,
TTPS Operation Circle MPM I Unit II Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air duc
Making concrete platform for pilot erosion test loop in PTS and ST department, Providing sheet sun shade behind the Fly Ash shed and Repairing of floor and Aluminum Door in Bioremediation Lab of E and S department at CSIR-IMMT, BBSR
TTPS Operation Circle MPM I Unit I Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air duct
2nd stage-Supply of FaL G Cement Fly ash solid blocks of compressive strength not less than 50 Kg Sq cm to beneficiaries specified plots in any Project site Layout site in any mandal of Srikakulam District in Andhra Pradesh
Replacement of wornout 200 NB and 250 NB MSERW pipe lines of fly ash Conveying lines A,B,C and D from ESP hoppers to upto silo during the COH/AOH of 500 MW ,unit-7 during the year 2024-25.
SDSTPS-Lifting & Transportation of Ash, soot etc., collected in the ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23
SDSTPS-Lifting & Transportation of Ash, soot etc., collected in the ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23
Removal and disposal of fly ash, silt, slush deposits etc. from the drains around Administrative building complex, along 275 N road upto Unit 3 compound wall, along 302.5W road and inside stores area for the period from 08.04.2019 to 30.09.2019
Handling, Transport and Other Mining Services - Percentage quote based - Ash Transportation, Excavation & Loading of pond ash at any of the Ash Dykes/Ash Silos of NTPC Sipat, transporting by mechanical means in closed containers dumpers
Job Contract for deployment of HSW manpower in Ash UtilizationDepartment Works at NTPC-VSTPS
Work of construction of WBM road along ash disposal pipe line Chikwa Basti to Rakhi puliya (920 m) and In BTPS main gate puliya to ETP discharge point alongwith Nala (approx. 150 m), Obra, Sonbhadra
Anticipated/Emergency break down maintenance of 3Nos Ash disposal lines from Ash Pump House to Ash Pond of Units 5 and 6 of Stage-III/Dr.NTTPS as and when required during the year 2020-21.
Dr NTTPS Maintenance of drainage system, associated civil works of Stage 1 Ash Pond, miscellaneous civil works and maintenance of Ash Disposal Lines at Ash Ponds Stage 1 and 3 for the year 2020 21
Dr NTTPS Maintenance of Drainage system associated civil works of Stage I Ash pond miscellaneous civil works and maintenance of ash disposal lines at ash ponds stage I and III for the year 2021-22
Dr NTTPS Maintenance of Drainage system associated civil works of stage I Ash pond miscellaneous civil works and maintenance of ash disposal lines at ash ponds stage I and III for the year 2021-22
Custom Bid for Services - Annual Rate Contract for Operation & Maintenance (O&M) of Ash Handling Plant, Units # 1-6 (4 x 210 MW & 2 x 250 MW), MTPS including Ash Water Make-up Pumps for U#5&6, Ash Water Pumps Unit#1-4, Ash Seal Water Pumps for AHP of.. Similar Category Operation and Maintenance Power House/Power Plant
Supply,Installation,Erection and Commissioning of pond Ash Conveying System along with all accessories including dewatering and recycling arrangement,Trial Operation and Work of Comprehensive Operation andMaintenance of Ash Slurry Conveying System fo
Work contract for loading, transportation of pond ash from ash dyke of ATPS, MPPGCL Chachai, Dist- Anuppur (M.P.) and unloading in low laying area for proposed Bus Stand at Nagar Palika Dhanpuri, Distt -
Excavation, Loading, Transportation, Unloading and Leveling of 1.82 lakh cum Pond Ash taken from Chakari Ash Dyke of OTPS, Obra to low lying area near Circuit House at Lodhi toll plaza, Sonebhadra UP
M3799900504, M3799900406, M3799900401, M3799900501, +2 more
Manual shoveling and lifting the spilled ash from below the conveying pipe lines of fly ash conveying pipe line AB and CD passes and bottom ash A and B stream from compressor house area up to Silo area transporting the same to upper ash dyke
MTPS I Operation Chemical Engaging of external agency on works contract basis for collection of received coal, bunkered coal and fly ash, bottom ash sample on round the clock basis for analysis for a period of 365 days from the date of awarding the
Construction of flyash brick drain from mubarakh house to deva house, ajit majumdar house to pramod yadav and laxmi devi house to bada nalahouse in ward no 14 under pnp
Modification of Chhurikala village road culvert near Dhanras villagefor facilitating movement of ash utilisation vehicle from Dhanras AshDyke
Periodically cleaning of all drains in Bottom ash hopper plant area,boiler area and mill area in Unit I II and III and C row drain at power house for the period of one year from 01.04.2024 to 31.03.2025.
NCTPS I SEMII Circle AHP Dn Unit I II III Attending Routine Maintenance Break down Maintenance and Annual overhauling of Bottom Ash Hopper Scrapper Feeders Clinker Grinders and its accessories Hoppers of Economizer Air Pre Heater Flue Gas Duct
Annual work of watch and ward and patrolling services at HCSD and bottom ash pond of PH-IV (2X250 MW) extension Units No. 10 and 11 at 130 hectare ash bund during the year 2025-26 at STPS, Sarni.
Contract for Loading, Transportation and Delivering of Stowing Material (Sand/Bottom Ash) Rehandling from GDKCM (No.2,2A&5) stock yards to GDK.1&3 and GDK 2&2A Incline Mines, RG.1 Area for a period of 2 years
Custom Bid for Services - Deployment of Manpower for Operation of Weigh Bridges and Other Ash Utilization Activities at Ash Dyke & Silo Area of NTPC Lara for Two Years Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Fixed Remuneration Manpower Outsourcing Services - Minimum wage
CAM-Divn:Angular rotation of 200NB MS pipes of Slurry discharge lines from collection tank to slurry sump of ESP A B C and D passes in fly ash handling systemas and when requiredduring the FY 2026 27 in KTPS VII Stage
Annual Cleaning and Disposal Work of Garbage for Turbine, Boiler, Ash Handling, M.C.B. ATPS and M.C.B. BTPS Area of Unit no. 9, 10, 11, 12 and 13 5x200 MW BTPS Obra.
MTPS I CHP II Mechanical Sub Division Erection of 150 NB MS ERW pipes with bends from Ash handling pump house stage I High pressure pump to fire water pipe line
Service Contract for Operation, Mechanical maintenance, Electrical Maintenance of Ash Handling Plant Indure, Make Stage II (2x500 MW) SgTPP for four (04) months from 01/07/2026 to 31/10/2026
Procurement of various spares of Siemens Sinamics G130 Variable Frequency Drive Unit for motor of HCSD pump installed in Ash Handling Plant of PH-IV for EMD-IV, STPS, MPPGCL, Sarni.
Procurement of most critical spares for Instrument Air Compressors (Make Kirloskar Pneumatics Co Ltd model T BTD PM) installed in ash handling plant I units 1 and 2 SGTPS MPPGCL Birsinghpur
Over hauling of 0.4 KV Ash handling switch gear booster MCC ESP system switch gear control cubicles rapping motors heaters rapping mechanism and heater system control of 11th unit BTPS Obra
Work Contract for analysis of hazardous wastes and determination of dust concentration and free silica in perc in coal handling area ,ash handling area silo and mill areas of STPS Sarni
Work contract for round the clock Complete Operation and Maintenance of Ash Handling Plant of Unit 1 and 2 at 2x600 MW, SSTPP, MPPGCL, Dongalia for a period of 02 years
KTPS-V&VI Stages-Civil-O&M-I-Providing painting to the buildings of Fuel oil pump house,Ash handling plant, CAM Office, Dispensary and DM Plant of KTPS-V Stage.
Dismantling ,loading and transportation of various steel items pertaining to KTPS O and M or D and D at different locations and reutilization at ash handling system of KTPS VII Stage
TGGENCO BTPS STAGE-II CAM Division - Preventive / Periodical Maintenance and emergency rectification works of Ash Slurry Pump House in Ash Handling System of Stage-II BTPS during the year 2025- 26.
Procurement of Unique Industries/ The United Industries / McNally Bharat / BR Enterprise / Industrial Equipment make spares for ash intake valves and clinker grinders in Ash Handling Plant at STPP, Jaipur, Mancherial, Telangana
GLOBUS/AYEMS/MECAWBER/FUZION LONGKING 100NB AND 200 NB Double Disc Valves ASSEMBLY with pneumatic cylinder for Buffer Hoppers in Ash handling plant KTPS- V stage during the year 2023-24
Repair works to the damaged wall plastering and the worn out aluminum window painting and colour washing to the ash handling pump house Unit_III and sea water filtration plant at NCTPS_I
Structural steel works of Ash Handling Plant (AHP), Lime Handling Plant (LHP) and Gypsum Handling Plant (GHP) at 5x800 MW Yadadri Power project, Veerlapalem village, Dameracherla Mandal, Nalgonda District., Telangana state
TN-2160 Supply of spares for solenoid valves for wet ash evacuation and dense phase dry ash handling system at AHP unit 1 to 6, Stage I to IV, STPS, Suratgarh
Repair and servicing (AMC) of 2 Nos. of M/s Kirloskar make Instrument air Compressor (model-TBTDMM) including replacement of necessary consumable/spares for Unit-1 Ash handling system -BTPS,KPCL
Procurement of Spares for Mather and Platt make Seal Water Pump Model (RN-50A), and conditioner Water Pump (RN-80) Installed at Ash Handling System of 210 MW ATPS, MPPGCL, Chachai.