Loading…
Loading…
670 results • Best match
Development of New Asite Retail Outlets at Location Within 2 kms after Sonarpur Flyover towards Arapanch on Sonarpur Chakberia Road MOUZA GORKHARA Dist South 24 Parganas State West Bengal under Kolkata Divisional office WBSO
Laying of 2 Nos. 33 KV 3Cx400sq.mm. XLPE Cable (R.L. 4.300 KM) from Kankinara Flyover to Chord Road Substation for 33 KV source of Chord Road Substation under Naihati Division, District North 24 Parganas.
Repair and Restoration of Power Connectivity of Street Lights at Mahabirsthan Fly Over including supply and Laying of New Cable in Place of defunct cable
LIGHTING ARRANGEMENT AT MEDIAN VERGE ON A.J.C. BOSE RD FRONT OF SHKESPEARE SARANI X ING TO RAMPAL A.J.C. BOSE RD. FLY OVER IN WD-63
SINKING OF SUB-MERSSIBLE PUMP WITH WATER SUPPLY PIPE LINE FOR GARDEN PURPOSE BELOW METRO FLY OVER FROM WESTING HOTEL TO FINANCE CENTER NEW TOWN KOLKATA.
Cleaning shurbs,plants and jungles,removal of rubbish,Trimming,cutting and placement of uprooted treelogs and branches in suitable place and cleaning entireportion of 2nd Hooghly bridge flyover Khidderpore side approachportion during the year 2024-25
Annual Maintenance for Lighting System of Flyover Proper and at Grade of Lock Gate flyover under HRBC for 12-Months
Construction of Boundary Wall adjoining to Ahare Bangla at Baruipur Approch of fly over for use of the land as Mukta Mancha At Baruipur Under Baruipur Municipaliy
Construction of Underground Drain adjoining to Ahare Bangla at Baruipur Approch of fly over for use of the land as Mukta Mancha At Baruipur Under Baruipur Municipality
The work for carrying out a Survey for Road Centre line layout, ROW pillar fixing for the proposed 4 lane Elevated Corridor from Bypass near Metropolitan Housing Estate to Mahisbathan (New Town) with connectivity to Salt Lake, Sec-V, West BenG
Wire Fencing at different stretches of Kazi Nazrul Islam Avenue 4 Lane elevated corridor to prevent accident due to kite string for two-wheeler rider under Barasat Highway Division No.-I in the district of North 24 Parganas. (Plan Work)
Consultancy service for preparation of Detailed Project Report for construction of 4 lane elevated corridor of NH-31 (New NH-10) from km 581.00 to km.595.00 including ROB on Sevoke at 592.400 km in the district of Darjeeling West Bengal.
Independent Engineer Services for Operation and Maintenance for Kolaghat to Haldia section including ROB cum Flyover from km 52.080 to km 53.472 at the end of NH-41 on OMT basis in the state of West Bengal
Urgent Maintenance and Repairing of Concrete crash barrier of K.N.I. Avenue Flyover at Raghunathpur end on K.N.I. Avenue (V.I.P. Road) under Baguiati Highway Sub-Division under Barasat Highway Division - I, in the District of North 24 Parganas.
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue (ch. 6.1 kmp. to 8.05 kmp.) and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue (ch. 6.1 kmp. to 8.05 kmp.) and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue (ch. 6.1 kmp. to 8.05 kmp.) and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I.
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue (ch. 6.1 kmp. to 8.05 kmp.) and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I.
Annual Electrical Maintenance of lighting system of Flyover Proper and underneath deck slab of Gariahat Flyover under HRBC for 12 Months
Providing of various colourful shady and pollution control oriented plants at the no sunlightted designated places under Hometown flyover existed in Action Area I including replacement warranty for a period of 3 months under NKDA.
Emergent Repair of the damaged location and stitching of stretches of the Right side Service road infront of Malda Tourist lodge of Rathbari Flyover between Ch. 0.970 km to Ch.1.100 Km of NH 131A under N.H. Division No. VII
Installation of 9 Mtr electric pole with 4 four arms in the location of Ranighat ward no12 Anantapur More Flyoverward no31 Sukhnagar More Flyover ward no30 Miler Ghatward no26 and near Bazra Community Hallward no29 under CMC
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the District of North 24 Parganas.
Aerial topographical Survey using DGPS based integrated drone and other field works for Final Location Survey for New BG Line/ Doubling/ 3rd line/ 4th line, 5th line, 6th line/ flyover line/ bypass line over Eastern Railway-Package-I
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the district of North 24 parganas.
Annual Electrical maintenance of lighting system of flyover proper and underneath deck slab of Park Street Flyover under HRBC for 12 months
Repair and retrofitting works of Chingrighata Flyover, Kolkata.
Improvement of Salkia School Road (Part) from S.N. Temple Road to approach of Howrah Fly Over under Ward No-11,12 and 13(L-1580.00mtr Av W-9.75) (2nd Call)
Maintenance of street light including daily ON and OFF Operation for a period of one year from Dhalai Bridge to Kamal Gazi Fly Over end on EM Bye Pass
Annual Electrical Maintenance of lighting system of Flyover of Nagarbazer Flyover under HRBC for the period of 01.04.2023 to 31.03.2024 i.e.12-Months.
Annual Electrical Maintenance of lighting system of Flyover of Nagarbazer Flyover under HRBC for the period of 01.10.2024 to 30.09.2025 i.e.12-Months
Annual Electrical maintenance for lighting system of Flyover Proper and underneath deck slab of A.J.C. Bose Road Flyover under HRBC for 12 Months
Supply and delivery various types of Maintenance materials for HRBC Bhavan and adjacent offices, different flyovers with related roads under HRBC, Kolkata
Aerial topographical Survey using DGPS based integrated drone and/or Lidar and other field works for Final Location Survey for New BG Line/ Doubling/ 3rd line/ 4th line, 5th line, 6th line/ flyover line/ bypass line over Eastern Railway-Package-III
Diversion/relocation of existing 400 KV PPSP-Durgapur D/C Transmission Line in between Tower No. TL. 426 and 430 (RL -1.0 KM) under jurisdiction of Asansol 220 KV Substation for construction of Flyover by Eastern Railway for proposed Andal-Sainthia
Temporary patch repairing of Potholes with instant all weather potholes repairing compound (supplied by Department) as and when required on different spot of K.N.I. Avenue (ch. 6.1 kmp. to 8.05 kmp.) and VIP Flyover (Both Flank) as and when required
Painting works of Height Barrier of Garden reach flyover.
Painting work of Chingrighata Flyover on E M Byepasss
Construction of Protective Barrier at curves of Ultadanga Flyover
Maintenance of MAA Flyover from dated 01.07.2026 to 31.12.2026
Providing Surveillance and Emergent Refurbishment Service through Rapid Action Team for Vidyasagar Setu and any other flyovers etc. of HRBC for 2022-2023.
Providing Surveillance and Emergent Refurbishment Service through Rapid Action Team for Vidyasagar Setu and any other flyovers etc. of HRBC for 2023-2024.
Providing Surveillance and Emergent Refurbishment Service through Rapid Action Team for Vidyasagar Setu and any other flyovers etc. of HRBC for 2020-2021.
Providing Surveillance and Emergent Refurbishment Service through Rapid Action Team for Vidyasagar Setu and any other flyovers etc. of HRBC for 2026-2027.
Annual Maintenance for Lighting System of Flyover and under deck of Lock Gate flyover under HRBC for the period of 01.10.2024 to 30.09.2025 i.e.12 Months.
Compensatory damage work for the Demolition work of Posta Flyover.
Painting of Crash Barrier and median of Garden Reach Flyover.
Repairing and renovation of existing footpath including electrical pole shifting and its allied works of Service road from NDITA Fly-over to Chingrighata of Salt Lake Bypass at Sector-V, under NDITA.
Provision of Street Lights at Street near Jatragachi Fly Over and repair/replacement of unserviceable street lights at AA-II (CBD area) due to an urgent event, at NKDA area, Newtown Kolkata.
Annual Maintenance for Lighting System of Flyover Proper and at Grade of Lock Gate flyover under HRBC for the period of 01.04.2023 to 31.03.2024 i.e.12 Months.