Loading…
Loading…
670 results • Best match
Advertisement right for display of hoarding on sleek and light gantry structure over full width of flyover deck, on the AJC Bose Road flyover near Rabindra Sadan
Annual Electrical Maintenance of lighting system of Flyover and under deck slab of Gariahat Flyover under HRBC for the period of 01.10.2024 to 30.09.2025 i.e.12-Months
Annual Maintenance for Lighting System of Flyover Proper and at Grade of Lock Gate flyover under HRBC for the period of 01.04.2020 to 31.03.2021 i.e.12-Months
Annual Electrical Maintenance of lighting system of Flyover Proper and underneath deck slab of Gariahat Flyover under HRBC for the period of 01.04.2020 to 31.03.2021 i.e.12-Months
Annual Electrical Maintenance of lighting system of Flyover Proper and underneath deck slab of Gariahat Flyover under HRBC for the period of 01.04.2023 to 31.03.2024 i.e.12-Months
Painting work of inside portion of Crash Barrier of Samprity Flyover.
Improvement of illumination at underdeck of AJC bose flyover under HRBC
STMC work from 65.50 Km, Birpara Jn - 0.000 km of NH-317 - to 88.60 Km, Hasimara Flyover -23.100 km of NH-317 - of AH-48 under Construction Division, Special Project, AH-48 in the dist. of Jalpaiguri and Alipurduar, WB during the year 2025-26.
Construction of Elephant Underpass (from km. 153.853 to km 153.953) Flyover (from km 137.966 to km 138.034) 2 no. Box Culverts (km 153.679 and km 137.761) and other road safety works in Kharagpur Chichra section of NH-06 in West Bengal on EPC Mode
Construction of 2 nos of Flyover on Omarpur Junction of NH34 from Design Ch. 245.50 to Design Ch. 247.500 (Length2.0 km) and on Dhulian Junction of NH 34 from Design Ch. 274.300 to Design Ch. 276.500 (Length2.2 km) in West Bengal on EPC Mode
Annual Electrical maintenance of lighting system at Park Street flyover proper, underneath deck slab of Park Street Flyover ,Kolkata for the period from 01.04.2023 to 31.03.2024, i.e. 12 months.
Annual Electrical maintenance of lighting system of flyover proper and underneath deck slab of Park Street Flyover under HRBC for the period of 01.04.2020 to 31.03.2021 i.e.12 months.
Annual Electrical maintenance of lighting system at Park Street flyover and underneath deck slab of Park Street Flyover ,Kolkata for the period from 01.10.2024 to 30.09.2025,i.e. 12 months
Renovation and Rectification of Drainage System and Repairing of Carriageway and other ancillary works in Median Verge of Atgrade Road and in At-grade Road under Samprity Flyover (BBT Flyover).
Illumination of By-pass and service road on both sides of Nabadiganta Flyover by using the projected arm of the vertical pole fixed with the railing of Flyover under NDITA.
Annual Electrical maintenance for lighting system of Flyover Proper and underneath deck slab of A.J.C. Bose Road Flyover under HRBC for the period from 01.12.2022 to 30.11.2023, i.e. 12 months.
Annual Electrical maintenance for lighting system of Flyover Proper and underneath deck slab of A.J.C. Bose Road Flyover under HRBC for the period from 01.12.2024 to 30.11.2025, i.e. 12 months.
Annual Electrical maintenance for lighting system of Flyover Proper and underneath deck slab of A.J.C. Bose Road Flyover under HRBC for the period of 01.04.2020 to 31.03.2021 i.e.12-Months
Replacement of street lightfittings accessories of feeder box at Link road i e the road starting from balaka fly over up to 3 point crossing towards sector V New Town Kolkata under WBHIDCO O RDSLRPLR
Rent for Space for Advertisement display of 04ft x 03 f. size advertisement Kiosk at Following location for the period of 1(One) year, which may be extended for another two years subject to satisfactory performance and timely payment of upfront money
1. Compensatory damage work for the Demolition work of posta Flyover 2022
Emergent painting to concrete crash barrier (Inner and Top) of Gariahat Flyover.
Repairing of pot holes and small depressions on Khidderpore flyover of HRBC.
Restoring the at-grade road under BBT flyover from Jinjirabazar to Batanagar.
Providing Surveillance and Emergent Refurbishment Service through Rapid Action Team for Vidyasagar Setu and any other flyovers etc. of HRBC for 2024-2025 Part and 2025-2026.
Repairing of Bituminous Service Road Starting from Pier No- P-11 of Kamalgazi flyover to end of the Kamalgazi flyover towards Baruipur under jurisdiction of South Division, RB Sector, and KMDA.
Creation of greenery by plantation including supply of saplings in the median strip under Fly Over along EM Bypass from Uttar Panchanan Gram to Rubi Crossing in ward no-108, Br-XII (including one year maintenance)
Advertisement right for display of hoardings and kiosks on A.J.C. Bose Road flyover.
Construction of RCC Crash Barrier around the existing piers of Garden Reach Flyover.
Advertisement right for display of hoardings and kiosks on A.J.C. Bose Road flyover.
Temporary Decorative coloured LED light setted designed metallic arched structure illumination including fly over special lighting near Wipro Bridge from Nicco Park Junction to AL-BL crossing for the festival of HAPPY CHRISTMAS andNEW YEAR-2020 und
Repairing and maintenance of electrical lighting arrangement at 215A Bus Stand, illuminated signage at Nabadiganta Fly over, 11 nos. Passenger Shelter for Buses, the electrical system from metering kiosk to interim kiosk for 1 year under NDITA
Strengthening work of Southern By-pass Road starting from Kamalgazi Flyover End to Baruipur / Padmapukur More (Both Eastern and Western Flanks)....(PART - A) and Repairing, Renovation work ..... kamalgazi flyover portion for ...(PART - B).
INSTALLATION OF RAILING AS MEDIAN DIVIDER AT NEW PARK ST. FROM 7 POINT TO MAA FLYOVER APPROACH AND CIRCUS AVENUE FROM 7 POINT TO AJC BOSE FLYOVER IN WD NO-64, BR-VII.
Shifting and relocation of existing distribution feeder box and diversion of all power cable line to feed power supply for street lights, Wi-Fi, High Mast, Fountain etc. near Chingrighata fly over on Saltlake By Pass under NDITA.
Beautification and maintenance of the bottom portion of Maa Fly over including either side along E.M. Bypass from Science City crossing up to Chingrihata crossing and from Science City crossing up to 4 No. Bridge at Park Circus.
Decorative Illumination of Park Street Flyover/ Bridge in connection with Kolkata Christmas Festival - 2025
Providing Illumination with Distribution wiring within and below Flyover near Axis Mall under WBHIDCO
Decorative Illumination of Park Street Flyover/ Bridge during Durga Puja to Chhat Puja 2025
Decorative Illumination of Park Street Flyover Bridge in connection with Kolkata Christmas Festival 2024
Decorative Illumination of Park Street Flyover/ Bridge in connection with Kolkata Christmas Festival - 2022
IMPROVEMENT OF LIGHTING SYSTEM OF BONDEL ROAD FLYOVER UNDER WARD NO-65, BR-VII.
Annual Electrical Maintenance of lighting system of Nagerbazar Flyover under HRBC for 12 Months
Minor repairing, Upkeeping and maintenance of carriageway of Sonarpur ROB, Kamalgazi Flyover and Service Road under Kamalgazi Flyover under South Division, Rand B Sector, KMDA for a period from dated 11.02.2025 to 31.12.2026 324 Days.
Sweeping Cleaning (except Samprity Flyover) and Minor repairing, uprooting of trees and maintenance of carriageway of Derozio / Durgapur ROB, Samprity Flyover and Shoni Mondir Bridge over Keorapukur Khal Under South Division, R B Sector, KMDA for
Supply and delivery of different maintenance materials for Hwh side High Masts and conventional HPSV/MH fittings installed at different flyover underdecks (AJC Bose Rd, Park Street and Gariahat Flyover) and other conventional fittings arround Nabanna
Improvement of Bituminous Road from S.B.I ATM to Uluberia Rly. Flyover in ward no-27
Priming and Painting of Parapet wall and railing of AJC Bose Road Flyover - West Bound.
Renovation of rain water down pipe system of all interchanges ramps of Howrah side flyover
Maintenance of CCTV Camera installed at Maa Flyover for the period of 1(one) year.