Loading…
Loading…
245 results • Best match
Execution of three Nos RPWS Project pertaining to fifteen GPs of Lamtaput block ,thirteen GPs of Koraput Block of Koraput District and villages of Dabugam and villages of Jharigam block of Nabrangapur District including five years O and M on EPC
Execution of RPWS to Arjungaon, Budhipadar and Adj.villages (Raxy and Sarian Gps) under Narala Block of Kalahandi District
Procurement of GPS Master Clock System Spares from Sertel Electronics Pvt Ltd for CPP at IOCL Paradip Refinery
APPOINTMENT OF TC FOR CHANDBALI BLOCK (EXCEPT 03 GPS TAGGED TO DHAMNAGAR BLOCK) TAGGED TO RMC SIMULIA, CHANDBALI
hand held gps ( PAC Only ) Bidder Turnover (Last 3 Years) 1 Lakh (s) Experience Criteria 1 Year (s)
RFP for Consultancy Services for Authoritys Engineer for Supervision of the work Execution of Rural Piped Water Supply Project pertaining to Mega PWS to 26 GPs of Sambalpur District and 02 GPs of Jharsuguda District including 05 years of O and M
RFID TAG as per GSI Standard and CRIS Specification No2016/CRIS/NDLSITPI/WSC/POLICYRFID/0101/PT-1(V4.1) or latest for Wagon. Standard detailed Specification attached as per annexure.
Computer Hardware - SUPPLY WITH PRELOADED CRIS IMAGE AND INSTALLATION OF SMART CARD CONSOLE (SMC ) UNIT ( I UNIT CONSISTS STATION MANAGEMENT CONSOLE , DOT MATRIX TICKET PRINTER ,RFID SMART CARD READE
Supply , Installation & Commissioning Automatic Ticketing Vending Machine (ATVM) Smart Card Based, Consit of Touch Screen, Embedded client, 4K Rfid Reader/Writer, Thermal Printer 1 KVA UPS, OS and RDB
Supply, Installation, testing & Commissioning of Station Management Console (SMCs) Sets of Thin client set for Kiosk management with software license, RFID Reader/Writer for smart card within (4K), Do
Construction of RFID Based Driving Track Such as M.V.I Building, Driving testing Track, Approach road with site development and Compound wall at Ganeswarpur, Balasore under R.T.O Balasore for 2019-20.
Supply, Installation & Commissioning of Automatic Ticketing Vending Machine (ATVM) Smart Card Based, Consit of Touch Screen, Embedded client, 4K Rfid Reader/Writer, Thermal Printer 1 KVA UPS, OS and R
Execution of RPWS pertaining to Two GPs (Nineteen Villages) under Gudari Block Rayagada District including five years Operation and Maintenance
Execution of RPWS pertaining to Two GPs (Twelve Villages) under Padampur Block Rayagada District including Five years Operation and Maintenance
Execution of RPWS pertaining to 06 GPs 19 Villages under Padampur Block Rayagada District including 5 years Operation and Maintenance.
Execution of RPWS pertaining to 04 GPs 34 Villages under Padampur Block Rayagada District including 5 years Operation and maintenance
Supply Installation Testing Commissioning of IP Based RFID and ANPR Automatic Number Plate Recognition Enabled Automatic Boom Barrier Access Control System for Basement Staff Parking area at Hospital Building AIIMS Bhubaneswar
SUPPLY WITH PRELOADED CRIS IMAGE AND INSTALLATION OF SMART CARD CONSOLE (SMC ) UNIT ( I UNIT CONSISTS STATION MANAGEMENT CONSOLE , DOT MATRICX TICKET PRINTER ,RFID SMART CARD READER ) WITH 3 YEAR ONS
SUPPLY INSTALLATION AND COMMISSIONING OF SMART CARD MANAGEMENT (SMC) TERMINAL AS PER CRIS SPECIFICATION ENCLOSED ANNEXURE A WITH RFID AS PER CRIS SPECIFICATION ENCLOSED ANNEXURE B and PRINTER AS PER C
Blind Rivet for RFID Tags, as per Drawing; M/s Avlok Part No. HMS44-16419GG or M/s Stanley Part No. 02771-00824 or M/s Arconic Part No. MGLP-R8E.
Execution of 02 Nos Individual Rural Piped Water Supply Project pertaining to 12GPs of Udala Block and 14GPs of Khunta Block of and to all 30 GPs of Badasahi Block and 06 GPs of G B Nagar Block of Mayurbhanj District including 05 years of OM
SITC OF VILLAGE ELECTRIFICATION WORKS (WITH BPL S/C WORKS) UNDER BGJY IN SANKARDA GPS IN KASHIPUR BLOCK OF RAYAGADA DISTRICT
Execution of Mega PWS project to Badapada and Papermetla GPs including five years maintenance cost under Chitrakonda Block in Malkangiri District
Blind Rivet for RFID Tags as per Drawing M/S Avlok Part no.HMS44-16419 GG OR M/S Stanley Part no. 02771-00824 or M/S Arconic Part no. MGLP-RBE OR Equivalent
SITC of Village Electrification works (with BPL S.C works) under BGJY in Regeda and Gudiabandha GPs of Padmapur Block in Rayagada District
ENDURANCE MONITORING SYSTEM OPERATING PLATFORM, INSTALLATION EMS OF WITH DEMO, INSTALLATION OF EMS DEVICES WITH DEMO, SYSTEM CHECKS WITH LIVE DEMONSTRATION THE EVENT, RFID RACE TIMING SYSTEM MACHINE, UHF 9DBI RFID ANTENA, RFID REUSABLE TAG, EMS ... DEVICE, RFID REGISTRATION
SITC OF VILLAGE ELECTRIFICATION WORKS (WITH BPL S/C WORKS) UNDER BGJY IN SIRIPAI AND GODIBALI GPS IN KASHIPUR BLOCK OF RAYAGADA DISTRICT.
SITC OF VILLAGE ELECTRIFICATION WORKS (WITH BPL S/C WORKS) UNDER BGJY IN RENGA AND MANDIBISI GPS IN KASHIPUR BLOCK OF RAYAGADA DISTRICT.
Provide 1 x 100 KVA 11 by 0.4 KV plinth mounted Sub-Station construction of 0.08km long 3Q 3W 11KV OH Line for power supply to 70KW GPS load in IOCL RO at Vishal F Stn CDA Cuttack
Execution of Rural Piped Water Supply Project pertaining to 26 GPs under Kaptipada Block under Mayurbhanj District including five years of Operation and Maintenance
SITC of Village Electrification works (with BPL S.C works) under BGJY in K. Singapur and Singari GPs of K. Singhpur Block in Rayagada District
SITC of Village Electrification works (with BPL S.C works) under BGJY in Sikarpai, Korapa and Pujariguda GPs of K. Singhpur Block in Rayagada District
-Lingaraj, Boom Barrier Operator Charges for 4th year after 1 year warranty -Lingaraj, Boom Barrier Operator Charges for 5th year after 1 year warranty -Lingaraj, Internet Leased Line Charges during warranty period - Lingaraj, Internet Leased Line Charges for 1st year after 1 year warranty - Lingaraj, Internet Leased Line Charges for 2nd year after 1 year warranty - Lingaraj, Internet Leased Line Charges for 3rd year after 1 year warranty - Lingaraj, Internet Leased Line Charges for 4th year after 1 year warranty - Lingaraj, Internet Leased Line Charges for 5th year after 1 year warranty - Lingaraj, Boom Barrier -Kaniha, CAMC Cost for 1st year after 1 year warranty - Kaniha, CAMC Cost for 2nd year after 1 year warranty - Kaniha, CAMC Cost for 3rd year after 1 year warranty - Kaniha, CAMC Cost for 4th year after 1 year warranty - Kaniha, CAMC Cost for 5th year after 1 year warranty - Kaniha, Boom Barrier Operator Charges during warranty period -Kaniha, Boom Barrier Operator Charges for 1st year after 1 year warranty -Kaniha, Boom Barrier Operator Charges for 2nd year after 1 year warranty -Kaniha, Boom Barrier Operator Charges for 3rd year after 1 year warranty -Kaniha, Boom Barrier Operator Charges for 4th year after 1 year warranty -Kaniha, Boom Barrier Operator Charges for 5th year after 1 year warranty -Kaniha, Internet Leased Line Charges during warranty period - Kaniha, Internet Leased Line Charges for 1st year after 1 year warranty - Kaniha, Internet Leased Line Charges for 2nd year after 1 year warranty - Kaniha, Internet Leased Line Charges for 3rd year after 1 year warranty - Kaniha, Internet Leased Line Charges for 4th year after 1 year warranty - Kaniha, Internet Leased Line Charges for 5th year after 1 year warranty - Kaniha, Boom Barrier -IB Valley, CAMC Cost for 1st year after 1 year warranty - IB Valley, CAMC Cost for 2nd year after 1 year warranty - IB Valley, CAMC Cost for 3rd year after 1 year warranty - IB Valley, CAMC Cost for 4th year after 1 year warranty - IB Valley, CAMC Cost for 5th year after 1 year warranty - IB Valley, Boom Barrier Operator Charges during warranty period -IB Valley, Boom Barrier Operator Charges for 1st year after 1 year warranty -IB Valley, Boom Barrier Operator Charges for 2nd year after 1 year warranty -IB Valley, Boom Barrier Operator Charges for 3rd year after 1 year warranty -IB Valley, Boom Barrier Operator Charges for 4th year after 1 year warranty -IB Valley, Boom Barrier Operator Charges for 5th year after 1 year warranty -IB Valley, Internet Leased Line Charges during warranty period - IB Valley, Internet Leased Line Charges for 1st year after 1 year warranty - IB Valley, Internet Leased Line Charges for 2nd year after 1 year warranty - IB Valley, Internet Leased Line Charges for 3rd year after 1 year warranty - IB Valley, Internet Leased Line Charges for 4th year after 1 year warranty - IB Valley, Internet Leased Line Charges for 5th year after 1 year warranty - IB Valley, Boom Barrier -Lakhanpur, CAMC Cost for 1st year after 1 year warranty - Lakhanpur, CAMC Cost for 2nd year after 1 year warranty - Lakhanpur, CAMC Cost for 3rd year after 1 year warranty - Lakhanpur, CAMC Cost for 4th year after 1 year warranty - Lakhanpur, CAMC Cost for 5th year after 1 year warranty - Lakhanpur, Boom Barrier Operator Charges during warranty period -Lakhanpur, Boom Barrier Operator Charges for 1st year after 1 year warranty -Lakhanpur, Boom Barrier Operator Charges for 2nd year after 1 year warranty -Lakhanpur, Boom Barrier Operator Charges for 3rd year after 1 year warranty -Lakhanpur, Boom Barrier Operator Charges for 4th year after 1 year warranty - Bid Details 3/120 Lakhanpur, Boom Barrier Operator Charges for 5th year after 1 year warranty -Lakhanpur, Internet Leased Line Charges during warranty period - Lakhanpur, Internet Leased Line Charges for 1st year after 1 year warranty - Lakhanpur, Internet Leased Line Charges for 2nd year after 1 year warranty - Lakhanpur, Internet Leased Line Charges for 3rd year after 1 year warranty - Lakhanpur, Internet Leased Line Charges for 4th year after 1 year warranty - Lakhanpur, Internet Leased Line Charges for 5th year after 1 year warranty - Lakhanpur, Boom Barrier -Basundhara, CAMC Cost for 1st year after 1 year warranty - Basundhara, CAMC Cost for 2nd year after 1 year warranty - Basundhara, CAMC Cost for 3rd year after 1 year warranty - Basundhara, CAMC Cost for 4th year after 1 year warranty - Basundhara, CAMC Cost for 5th year after 1 year warranty - Basundhara, Boom Barrier Operator Charges during warranty period - Basundhara, Boom Barrier Operator Charges for 1st year after 1 year warranty -Basundhara, Boom Barrier Operator Charges for 2nd year after 1 year warranty -Basundhara, Boom Barrier Operator Charges for 3rd year after 1 year warranty -Basundhara, Boom Barrier Operator Charges for 4th year after 1 year warranty -Basundhara, Boom Barrier Operator Charges for 5th year after 1 year warranty - Basundhara, Internet Leased Line Charges during warranty period - Basundhara, Internet Leased Line Charges for 1st year after 1 year warranty - Basundhara, Internet Leased Line Charges for 2nd year after 1 year warranty - Basundhara, Internet Leased Line Charges for 3rd year after 1 year warranty - Basundhara, Internet Leased Line Charges for 4th year after 1 year warranty - Basundhara, Internet Leased Line Charges for 5th year after 1 year warranty - Basundhara, Boom Barrier -Mahalaxmi, CAMC Cost for 1st year after 1 year warranty - Mahalaxmi, CAMC Cost for 2nd year after 1 year warranty - Mahalaxmi, CAMC Cost for 3rd year after 1 year warranty - Mahalaxmi, CAMC Cost for 4th year after 1 year warranty - Mahalaxmi, CAMC Cost for 5th year after 1 year warranty - Mahalaxmi, Boom Barrier Operator Charges during warranty period - Mahalaxmi, Boom Barrier Operator Charges for 1st year after 1 year warranty -Mahalaxmi, Boom Barrier Operator Charges for 2nd year after 1 year warranty -Mahalaxmi, Boom Barrier Operator Charges for 3rd year after 1 year warranty -Mahalaxmi, Boom Barrier Operator Charges for 4th year after 1 year warranty -Mahalaxmi, Boom Barrier Operator Charges for 5th year after 1 year warranty - Mahalaxmi, Internet Leased Line Charges during warranty period - Mahalaxmi, Internet Leased Line Charges for 1st year after 1 year warranty - Mahalaxmi, Internet Leased Line Charges for 2nd year after 1 year warranty - Mahalaxmi, Internet Leased Line Charges for 3rd year after 1 year warranty - Mahalaxmi, Internet Leased Line Charges for 4th year after 1 year warranty - Mahalaxmi, Internet Leased Line Charges for 5th year after 1 year warranty - Mahalaxmi
Supply, Installation and commissioning of Software and RFID readers for Real time Weighment data transfer from 04(Four) numbers of Road In-motion weighbridges to ERP/SAP server for implementation of human intervention less WB Automation Process
Execution of Rural Piped Water Supply Project pertaining to 42 GPs of Rairakhol Block (constituency) of Sambalpur district including five years of Operation and Maintenance
Supply, Installation and commissioning of Software and RFID readers with tags (100 nos.) for Real time Weighment data transfer from 01 number of Road static weighbridges to ERP/SAP server for implementation of human intervention less WB automation
Transline IG CBI--TRANSLINE TECHNOLOGIES PRIVATE LIMITED, Transline IG CBI--TRANSLINE TECHNOLOGIES PRIVATE LIMITED Acrylonitrile Butadiene Styrene (ABS) USB GPS Receiver for Aadhar With 7uA Backup Mode
Execution of Mega PWS to 13 GPs of Banki 17GPs Dampada and 02 GP of Baranga Block in Cuttack district including five years of Operation and Maintenance
Retrofitting of RPWS schemes from 40LPCD to 70LPCD to villages of 6nos. GPs (Gobara, Dera, Tentulei, Badajorada, Jagannathpur (Part) and Kukudanga) under Talcher Block around 17nos. Peripheral villages around MCL in the District of Angul.
Execution of Rural Piped Water Supply Projects pertaining to 26 GPs of Sambalpur district and 2GPs of Jharsuguda district including five years Operation and Maintenance under one Package
Execution of Mega PWS to all villages of Athagarh block and Tigiria Block and Seven GPs of Banki Block of Cuttack district including five years Operation and Maintenance
Execution of Rural Piped Water Supply Project pertaining to 58 villages of Andrapalli Jantri Jodambo and Panasaput GPs under Chitrakonda Block of Malkangiri District including 5 years Operation and Maintenance
FLMS 1500 MM, FLMS 1000MM, GPS for vehical tracking system, GPS Application data charges for 05 year, Sim charges for each GPS 5 Yrs
Execution of Retrofitting of PWS from 40LPCD to 70LPCD to Kakatpur and Adj villages in Kakatpur and Katakana GPs Under Kakatpur Block under Puri District including Five years Operation and Maintenance
Installation of 63 KVA 114 KVA SS along with Construction of 11kV Line for Power Supply to 30 KW GPS load for dewatering at Parade Ground near Pump House ward No. 11
Supply and installation of Digital office clock with GPS synchronization (stand-alone mode) as per RDSO Spec.No. RDSO/SPN/TC/62/2008 Rev 4.1 or latest with RED LED with complete installation including
Global Positioning System for BPSPA
AUTOMATION KIT OF 9KL DIESEL BOWSER, INSTALLATION AND COMMISSIONING OF RFID TAGS FOR HEMMS
Custom Bid for Services - Hiring charge of agency to make required arrangements as specified in the scope of work for smooth conducting of medical camp 10 nos within 7 GPs surrounding OSCOM mine for 6 months
100 Te electronic in-motion Road Weighbridge along with Computer, Printer, UPS, IP camera, RFID system