Loading…
Loading…
65 live14 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
65 results • Best match
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Orai Barah Section of NH27 from Ex. Km 1515.713 to Km 1578.383 in the State of Uttar Pradesh on HAM (Total Length 62.670 km).
AE services for Development of Access Controlled Highway of 4 lane from Kadur (Km 256.160) to Hasnapur/Potulamadugu (Km 267.360) (Mahabubnagar Bypass) of Hyderabad Panaji section of NH167 (length 11.200km) under NH(O) in Telangana on EPC mode.
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs and Parks) on Delhi-Agra Section on NH-2 from Km. 16.100 to Km. 20.500 in Delhi and Haryana on Item Rate (Percentage) basis.
Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Armoor (design km.29.100) to Jagtial (design km.92.700) (total length 63.600 km) under NH(O) on Hybrid Annuity Mode in the state of Telangana
Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Jagtial (design km.92.700) to Mancherial (design km.160.995) (total length 68.295 km) under NH(O)on Hybrid Annuity Mode in the state of Telangana
Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi Orai Section (PKG-2) from Design Km 1423.000 Sultanpura Village to Design Km 1469.000 near Ingui Khurd Village NH-27 in UP on HAM mode. (TL46.000 kms).
Widening and Upgradation of existing highway from Khagaria (Design Ch. 270.000) to Purnea (Design Ch. 413.529) section of NH 31 and NH 231 to 4 lane with paved shoulders under NH (O) on BOT (Toll) in the State of Bihar (2 nd call)
CS for Independent Engineer for Widening and Upgradation of existing highway from Khagaria Design Ch.270.000 to Purnea Ch.413.529 section of NH31-NH231 to 4 lane with paved shoulder under NHO on BOT (Toll) in the State of Bihar (2nd Call)
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi-Orai Sec. (PKG-1) from Design Km 1378.915 near Jhansi (Sijwaha Tiraha NH27) to Design 1423.000 near Sultanpura Village NH-27 in UP on HAM mode. (TL44.085 kms)
IE for (PKG1) Dev of 6L access controlled greenfield highway starting from Junction with NH-60 at Adgaon (km. 138.00) to Ahilyanagar (km. 290.000) to start of Ahilyanagar bypass (km. 126.564) of NH-160 in Maharashtra on BOT (Toll) Mode 2nd call
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi Orai Section (PKG-3) from Design Km 1469.000 near Ingui Khurd Village to Design Km 1515.710 near Orai (Bandha Village) NH-27 in Uttar Pradesh on HAM mode.
Expression of Interest (EOI) for Design Development Deployment, Operation and Maintenance of the Next Generation 1033 National Highways Helpline and Call Centre
CS for IE services for Development of 4 lane Badvel to Nellore Highway from Badvel Gopavaram Village on NH NH-67 (Ch.630.960) to Guruvindapudi Village on NH-16 (Ch.739.094) in Andhra Pradesh on Build-Operate-Transfer (Toll) mode for a TL 108.134 km.
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern