Loading…
Loading…
700 results • Best match
Development of Six-Lane Access Controlled Greenfield Highway from Polavaram (Ch. 260.000) to Marripudi (Ch.285.500) of Bengaluru Vijayawada Economic Corridor on HAM Mode under bmp Phase-I in AP (Pkg-12)
Construction of Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
Construction of 4 Lane Elevated Highway and at-grade improvements at Gopalganj Town from Design Ch. 384.000 to Design Ch. 386.750 on NH 28 in the state of Bihar on EPC mode
Development of 6 Lane Access Controlled Greenfield Highway from Yerragudipadu (Ch.129.000) to Audireddipalle (Ch.160.000) of Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in Andhra Pradesh (Package-6)
Construction of Six lane access-controlled Highway from Km 0.000 to Km 40.080 (Paniyala to Mator Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
Construction of 6lane Greenfield Varanasi Ranchi Kolkata Highway from Deoria village to Donoreshan village from km 253.000 to km 288.600 under Bharatmala Pariyojana in the State of Jharkhand on HAM (PKG 10)
Development of 6-Lane Access Controlled Greenfield Highway from Chandrasekharapuram (Ch.228.000) to Polavaram (Ch. 260.000) of Bengaluru Vijayawada Economic Corridor on HAM Mode under BMP Phase-I in AP (PKG-11)
Unipole Cluster No.7, On Expressway NH-24/9, FTC Nizmuddin to Ghaziabad, Shahdara South Zone
Development of New A site Retail Outlet at Botad within 4 kms from Jyotigram circle towards Tajpar on Botad Tajpar Highway, Taluka Botad, District Bhavnagar under Rajkot Divisional Office of Gujarat State Office
Operation and Maintenance of 6lane Badarpur Elevated Highway including service roads ramps approaches PUPs Parks on Delhi Agra section of NH2 from Km 16pt100 to Km20pt500 in the State of Delhi and Haryana
Development of 6Lane Access Controlled Greenfield Highway from Odulapalle (Ch.72.000) to Nallacheruvu palli (Ch.96.300) of Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in the Andhra Pradesh (PKG-4)
M/o various scheme under Nazul A/c-II (EZ). Sub-Head- Cleaning of UGR and internal sewer line at site 1 and 2 (Highway Apt and Skylark Apt) and Community hall at Gazipur.
Development of 6 lane Access Controlled Greenfield Highway from Km 162.500 to Km 203.100 Baswantpur to Singnodi section of NH 150C (Pkg 4 of Akkalkot KNT or TS Border) on HAM under Bharatmala Pariyojna
Development of 6 Lane Access Controlled Greenfield Highway from Nallacheruvu palli(Ch.96.300)to Yerragudipadu(Ch 129.000)of Bengaluru Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana PhaseI in Andhra Pradesh (Package 5)
Prebid Engineering Services for Construction of Eight lane access-controlled Expressway from Km 3.000 to Km 20.200 (Shirsad to Akloli Section-SPUR of Vadodara Mumbai Expressway P14 Km 20.200 to Km 43.000 P15 and Km 43.000 to Km 69.800 P16 Maharashtra
Pre Bid Engineering services for the work of Development of Jakh Kunjwani section of NH 44 to six lane Expressway standards as part of Delhi Amritsar Katra Exp Design Km 503.200 to km Km 515.000 of Delhi Amritsar Katra Expressway
Engagement of user fee agency through e-quotation for Six lane access controlled Greenfield highway of Delhi-Saharanpur-Dehradun Economic Corridor under Bharatmala Pariyojna for Phase-I from Akshardham to Junction of EPE at Baghpat
Construction of 6lane Greenfield Varanasi-Ranchi-Kolkata Highway from Jn with NH320 in Lepo village to Kamlapur village (JH/WB border) from km 358.500 to km 387.200 under BMP in Jharkhand on HAM (Package 13)
Development of 6 lane Access Controlled Greenfield Highway from km. 97.000 to km 162.500 Maradgi S Andola to Baswantpur section of NH150C (Pkg-3 of Akkalkot KNT or TS Border) under Bharatmala Pariyojna on HAM
Construction of 6 lane Greenfield Varanasi Ranchi Kolkata Highway from Chatra to junc with NH 100 in Deoria village from km 222.000 to km 253.000 under BMP in the State of Jharkhand on HAM (PKG9)
Construction of Six Lane Greenfield Patna Ring Road Highway (NH131G) from Kanhauli to Sherpur (from Km. 0.000 to Km 8.480) including Junction Development with Bihta Danapur elevated corridor (length1.5 Km) (TL 9.98 Km.) in Bihar.
Construction of 6-lane Greenfield Varanasi- Ranchi- Kolkata Highway from Sonepurbigha village to junction with NH-22 (Chatra Bypass) near Chatra from km 184.700 to km 222.000 under BMP in Jharkhand on HAM(PKG 8)
Development of Six lane access controlled highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 16.380 to km 19.785 Design Chainage in Uttarakhand under Bharatmala Pariyojana on EPC mode Package3
Construction of Boundary wall and side drain for Bijwasan Bund from Dwarka Expressway Underpass to Kapasheda Chawla Road.
Development of New A site Retail Outlet at Dhutarpur between Km Stone 13 and Km Stone 16 on Kalavad Fall Highway SH94 under Jamnagar East RSA District Jamnagar under Rajkot Divisional Office of Gujarat State Office
Strengthening Road Safety works Including improvement and Routine Operation Maintenance of Delhi-Gurgaon NH-48 Other works along the project highway 14.300 to Km. 42.000 (Delhi to Kherki Dhaula FPin Haryana) in Delhi Haryana 2nd call
Development of 6_lane access controlled Ludhiana Bathinda Greenfield highway section of NH754AD from junction with Amritsar Bathanda Greenfield Road (NH754A) near village Tallewal as a part of Ludhiana Ajmer Economic Corridor in Punjab on HAM PKG_I
Development of Six Lane Chittoor-Thatchur Highway from km 43.800 (Kumarajapet) to km 61.380 (Veera Kaveri Raja Puram) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh and Tamil Nadu (Package- II)
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-II from Shahapur (km 42.500) to Pindari (km 78.150) on EPC Mode in the state of Uttar Pradesh
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Pachmon village to Anarbansalea village (From KM. 116.000 to KM. 151.200 Pkg-6 Total Length 35.20Km) under Bharatmala Pariyojana in the state of Bihar on HAM
Access Controlled Highway of 4 lane with paved shoulders from Walajapet/ Ranipet (Design Chainage km 106.800) to TN/ AP Border (Design km 134.879) of NH40 in Tamil Nadu on Hybrid Annuity Mode (Project Length 28.079 kms)
Construction of 6lane Greenfield Varanasi-Ranchi-Kolkata Highway from Jn with NH20 in Bongabar village to Jn with NH320 in Lepo village from km 325.500 to km 358.500 under BMP in Jharkhand on HAM (Package 12)
Improvement of road from Dwarka Expressway to Bamnoli T-Point under the jurisdiction of SD-IV, DMD-2, Dwarka.
CS for AE for Supervision of Construction of 69 Bridges including approach road on the Tamu Kalewa Kyigone (TKK) section from km 0.00 to km 149.70 of Trilateral Highway in Myanmar to be executed on EPC mode
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Chandauli-Chainpur Road near Khainti village to junction with Bhabhua-Adhaura road near Palka village (Km.27.000-Km.54.000) under BMP in Bihar on HAM
Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III).
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Anarbansalea village to Sagrampur village (From KM. 151.200 to KM. 184.700 Pkg-7 Total Length 33.50 Km) under Bharatmala Pariyojana in the state of Bihar on HAM
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs toilets and Parks) on Delhi-Agra section of NH-2 from Km.16.100 to 20.500 in the State of Delhi and Haryana
Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II)
Construction of 4 Lane Access Controlled Highway from Vakalpudi Light House to Annavaram (on NH16) Section of NH516F from Km. 0.000 to Km. 40.621 on HAM under Bharatmala Pariyojana Phase I in the state of Andhra Pradesh
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh
Independent Engineer services for 6-lane Access Controlled Greenfield Highway from Km. 97.000 to Km 162.500 Maradgi S Andola to Baswantpur section of NH-150C (Package-III of Akkalkot-KNT-TS Border) on HAM Mode under Bharatmala Pariyojana
Development of New A site Retail Outlet at Akala within 4 km of Shree Viradi Kanya Shala of village Viradi on Maliya Hatina Sasan Highway, Taluka Maliya Hatina, District Junagadh under Rajkot Divisional Office of Gujarat State Office
Repair of broken, Damaged Boundary Wall/Steel Gate and fixing of New Steel Gate on both sides (R/side, L/side) of Trunk Drain No.1 between Arterial Highway Bridge (RD 10330m) to Delhi - U.P. Boarder (RD 13387m).
Engagement of user fee agency through e-quotation for 6lane access controlled GF highway of Delhi Saharanpur Dehradun Economic Corridor under Bharatmala Pariyojna for Phase-I (NH-709B) from Akshardham to Junction of EPE at Baghpatto Saharanpur Bypass
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Construction of 6-lane Greenfield Varanasi Ranchi Kolkata Highway from Donoreshan village to junction with NH20 in Bongabar village from km 288.600 to km 325.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (PKG11)
Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode
Development of Six-Lane Access Controlled Greenfield Highway from Marripudi (Ch. 285.500) to Somavarappadu Ch.314.600 of NH-544G Bengaluru-Vijayawada Economic Corridor on HAM Mode under BMP Phase-I in the State of Andhra Pradesh (Package-13)
Consultancy services for Independent Engineer for Construction of 4Lane Access controlled Highway from Vakalapudi Light House to Annavaram (on NH16) section of NH-516F from Km. 0.000 to Km. 40.621 on HAM under BMP, Phase1 in Andhra Pradesh.