Loading…
Loading…
700 results • Best match
Up-gradation to 4-Lane with Paved Shoulder configuration of the highway starting from km 88.400 (Savali Vihir) to km 163.400 (Ahmednagar bypass) (Design Length-75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana-Shamli-Muzaffarnagar Miranpur Bijnor at Kotawali to two-four lane in the State of UP on EPC Mode Pkg-IV (Bijnor to Kotawali NH-709AD)
Development of 6 lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under BMP from Design Chainage 82.000 Vill-Khyawari to Design Chainage 119.068 (Vill-Latifpur at Saharanpur Bypass) in UP on EPC Mode (Package-IV)
Supply Installation Testing and Commissioning of 11 KV Substation DG Set and Allied works at NFR Facilities at Location KM 183 300 LHS Village Jhaneri Tehsil Bhawanigarh Distt Sangrur on Delhi Amritsar Katra Express Highway under Sangrur DO
Development of Six-Lane Access Controlled Greenfield Highway from Somavarappadu (Ch.314.600)to Muppavaram Ch.343.240 of NH-544G Bengaluru-Vijayawada Economic Corridor on HAM Mode under BMP Phase-I in the State of Andhra Pradesh (Package-14)
Up-gradation to Four Lane configuration with Palkhi Marg of the highway starting from Junction with NH-65 near Patas -Vasunde Phata-Baramati (NH965G) and Partly Baramati Bypass in the State of Maharashtra under BMP on EPC mode
Pre Bid Engineering Services for the work of Construction of Four Lane Expressway in Ahmedabad Dholera section pakage3 and 4
Engagement of user fee agency through EQ for Rudrapur FP at Km 27.250 Km for the project rehabilitation up gradation of existing Highway to 2 lane / 4 lane with paved shoulder configuration from Talegaon to Gonapur section in Maharashtra
Consultancy Services of Preparation of DPR for making the existing 4 lane Kadapa Kurnool section of NH 40 as an Access controlled highway along with spur to Orvakal industrial area (length 193 Km) in the State of Andhra Pradesh
Const. of 4L highway from Barabanki ch. Km 0.000 to Mustafabad ch. Km 43.030 Existing Ch. Km 0.000 to Ch. Km 43.700 on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme PKGI
Short term O and M of Access Controlled 6/8 lane Highway of Delhi Gurugram Sec of NH 48 from Km.14.300 (Rao Tula Ram Marg in Delhi) to Km. 42.000 Gurugram in the state of Delhi and Haryana.
Emergent and Special Work of Dhaula Kuan section of NH-48 and Other Works along the Project Highway from Km. 11.000 to Km. 13.940 (Dhaula Kuan in Delhi to RTR Flyover) of Six Month (6month) on Item Rate basis
Construction of 6 Lane access controlled Greenfield highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH 754K as a part of Amritsar Jamnagar Economic Corridor in the State of Gujarat under BMP
Engagement of user fee agency through e-quotation for Siwaya Fee Plaza located at km 75.990 for 4laning divided highway of Meerut Muzaffarnagar Section of NH-58 from Km. 52.250) to Km.130.560 in the state of Uttar Pradesh
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura road in Bhairopur village to Konki village (from Km.54.000-Km.90.000 Pkg-3 Total Length 36Km) under BMP in the state of Bihar on HAM
Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi/UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in Uttar Pradesh on EPC mode under Economic Corridor in phase1 of Bharatmala Pariyojana
CS for AE for Supervision of Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun under BP from Design Chainage 56.500 Vill-Karaunda Mahajan to 119.790 Vill-Latifpur at Saharanpur Bypass in UP on EPC Mode Package-II
Authority Engineer Services for Construction of underpasses at 7 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh
Consultancy Services for AE services for 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km113.535) including widening of the existing 4lane-6lane highway from Km112.880-Km115.320 of the Meerut-Haridwar NH-58 on EPC mode in UP
Shifting of Sub Station falling in the alignment of loop of the interchange at Km 69300 of six lane access controlled highway of Delhi Saharanpur Dehradun Economic Corridor from design ch 56 to Ch 82 in the State of Uttar Pradesh
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs toilets and Parks) on Delhi Agra section of NH-2 from Km.16.100 to 20.500 in the State of Delhi and Haryana on item rate basis.
Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode
Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length-75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
Consultancy Services of AE for Construction of 6-Lane Patna Ring Road Highway NH-131G from Kanhauli to Sherpur from Km.0.000-Km8.480 including Junction Development with Bihta-Danapur elevated corridor App.length-1.5 Km on EPC Mode in Bihar L-9.98Km
Independent Engineer Services during Operation and Maintenance (O and M ) for Conversion of Delhi Gurgaon section of NH8 into an Access Controlled Eight/Six lane Highway from km 14.300 (Rao Tula Ram Marg) to km. 42.00 gurgaon ) in Delhi and Haryana.
Consultancy services for Independent Engineer for supervision of Construction of Six Lane access controlled Highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148NA (Design Ch. 0.000 to 9.000) in Delhi on HAM under BMP
Development of Six lane access-controlled highway from Design Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh and Uttarakhand under BMP on EPC mode (Package-2).
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under Bharatmala Pariyojana from Junction of EPE Design Ch 0.000 to Design Ch 27.000 (Vill.-Lohadda) in the state of UP on EPC Mode (Package-I) 2ND CALL
Hiring of Ambulance Service on Eastern Peripheral Expressway from Km. 1.000 to Km 136.000 in the States of Haryana and Uttar Pradesh
Addl. Information for Bidders : 1] Kindly send your email Ids 2 days in advance for Pre-bid meeting to [email protected] for adding to VC. 2] Physical EMD doc should be deposited well in advance before the due date and time of the tender to BPCL WR Engg Dept. Delay or non-receipt of physical EMD doc will be liable for rejection of your quote.
Development of New A site Retail Outlet at Nani Chirai between km stone 332 and 339 on RHS of samakhiali gandhidham highway NH 8A new NH 41 while going from samakhiali to gandhidham, Taluka Bhachau, District Kutch under Rajkot DO of GSO
Engagement of user fee agency on the basis of competitive bidding through e-tender for Kherki Daula and IGI User fee plazas for Delhi-Gurgaon section of NH-8 into Access Controlled 8-6 lane Highway in the state of Delhi and Haryana
Construction of 6-lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under BM (Ph-I) (AJ/DRGB-Package-6)
Construction of 6 Lane with Access Controlled Greenfield Highway from km 26.000 to km 97.000 MH or KN Border (Badadal) to Maradgi S Andola section of NH150C (Pkg-2 of Akkalkot to KN or TS Border section) on HAM under Bharatmala Pariyojna
Construction of 6 lane Greenfield corridor from Ramnagar to Kacchi Dargah NH119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode
Const of 4/6 Lane Highway of Southern Bareilly Bypass (L29.920km)starting at Ch.237.000 of NH 530 near Jhumka chauraha Dhantiya vill and ending at Ch267.000 of NH 30 near Invertis University inc Trumpet Interchange on HAM basis in the Uttar Pradesh
Construction of 6-lane access controlled Greenfield highway from km 180.000 to km 207.100 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC under BM(Ph-I) (AJ/DRGB-Package-8)
Construction of 4 Lane highway from Mustfabad Design chainage Km 43.030 to Biswariya Design chainage Km 101.515 (Existing Chainage Km 43.700 to Chainage Km 98.475) on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme (Package-II)
Development of 6lane of access-controlled Agra-Gwalior GF highway starting from km0.000-km88.400 Deori-Susera in the state of UP-Raj.-MP including the overlay strengthening and improvement works on from 1058.00-1148.00 of NH-44 on DBFOT BOT Mode NH(O
Construction of 6-lane access controlled Greenfield highway from km 97.000 to km 125.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC under BM(Ph-I) (AJ/DRGB-Package-5)
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Design Chainage 0.000 (Aksardham NH-9 (old NH-24)) to Design Chainage 14.750 (Delhi-UP Border) in the state of Delhi (Package-1) on EPC mode
Construction of 6-lane access controlled Greenfield highway from km 150.000 to km 180.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC under BM (Ph-I) (AJ/DRGB-Package-7)
Engagement of Safety CS during OM of (i)6-laning Strengthening of NH-248A Km2.740 Rajiv Chowk-Km11.682 in Gurugram (Package-I)(ii)from km11.682-24.536 Package-II(iii)Delhi-Gurgaon of NH-48 and other works project highway km11.060-42.00 in Haryana
CS for SC of Strengthening Road Safety works Including improvement and Routine OM of Delhi Gurgaon sec. of NH48 and works along the project highway from 14.300 to Km. 42.000 (Rao Tula RamMarg in Delhi to KherkiDhaula FP in Haryana) in Delhi Haryana
IE services for supervision of 4 Lane highway from Mustfabad Design chainage Km 43.030 to Biswariya Design chainage Km 101.515 (Ex.Chainage Km43.700-Chainage Km98.475) on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme (PKG-II)
Construction of new 4 lane Access controlled Highway from Cuttack (end point of CRRR at NH 16 near Tangi) to Kandarpur on SH 12 from Design Ch. 0.000 km to 21.225 under NH(O) on Hybrid Annuity Mode in the state of Odisha
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-19 and Varanasi Ring Road near Rewasa village to junction with Chandauli-Cainpur road near Khainti village (Km.0.000-Km.27.000) under BMP in UP and Bihar on HAM
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane configuration in State of UP on EPC Mode Pkg-III NH-709AD
Development of 6-lane access controlled LudhianaBathinda Greenfield highway sec of NH754AD from Jn. with MogaBarnala Rd NH703 to Jn. with DelhiKatra Exp way NE5 Ludhiana vill Ballowal as a part of LudhianaAjmer EC in Punjab on HAM under BMP Ph-1 Pkg2
Development of Retail Block cum Back of House Building at Ch 63 and Ch 69 and Miscellaneous works at Ch 33, 34, 63 and 69 on Way Side amenities Retail Outlet located at Delhi Mumbai Expressways under Gurgaon DO of Delhi and Haryana State Office