Loading…
Loading…
155 results • Best match
Geophysical investigations of Vulnerable stretches on National Highway/ State Highway of various states in India
Geotechnical Investigation for Protection/Treatments of vulnerable stretches on National Highway/State Highway of various states of India
BEAUTIFICATION WORK AT MASZID AT NATIONAL HIGHWAY, SISAIYA - SITARGANJ (U.S. Nagar)
Supply of Decentralized material for Shifting the electric lines in the National Highway
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-05)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-06)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-04)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-02)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-03)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-01)
Under road safety Scheme, installing crash barrier in the remaining length of state highway-15 (Uttarkashi Ghansali Tilwada state highway) km 51 to km 67.350 in Const. Pratapnager in District Tehri Garhwal.
Construction of Damaged R/wall andB/wall of National Highway 707A (Bataghat-Tehri section) in District Tehri Garhwal in the State of Uttarakhand under Special Repair Program 2024-25 and Estimates for Construction of Damaged walls of National Highway
Installation of crash in the remaining length of Kakaraligate-Thuligadh-Bhairav Mandir Motor road (State Highway-108) and Sukhidhang-Shyamalatal Motor road (State Highway-110) in Tanakpur area of Champawat district under Road Safety.
Improvement and maintenance of abandoned portion of Muzaffarnagar-Haridwar division of National Highway No.-58 Under Deposit work.
Renewal work of Lambagoan Motana Rajkhat Sandul motor road (State Highway) under annual maintenance year 2025-26.
Road safety, protective work in various State Highway in block Chamba and Thauldhar of Tehri Garhwal district.
Under road safety, work of installing crash barrier in the remaining length of state highway-69 (Lambgaon -Motana -Rajakhet -Ghansali -Sendul state highway km 74 to km 81.40) leaving the previously installed crash barrier and parapet in the motor roa
Under road safety, work of installing crash barrier in the remaining length of state highway-69 (Lambgaon -Motana -Rajakhet -Ghansali -Sendul state highway km 36 to km 49) leaving the previously installed crash barrier and parapet in the motor road.
Under road safety, work of installing crash barrier in the remaining length of state highway-69 (Lambgaon -Motana -Rajakhet -Ghansali -Sendul state highway km 01 to km 35) leaving the previously installed crash barrier and parapet in the motor road.
Under road safety, work of installing crash barrier in the remaining length of state highway-69 (Lambgaon -Motana -Rajakhet -Ghansali -Sendul state highway km 65 to km 73) leaving the previously installed crash barrier and parapet in the motor road.
Under road safety, work of installing crash barrier in the remaining length of state highway-69 (Lambgaon -Motana -Rajakhet -Ghansali -Sendul state highway km 50 to km 64) leaving the previously installed crash barrier and parapet in the motor road.
Renewal work of Tehri-Hindolakhal-Devparyag-Vyasghat-Bilkhet Motor Road (State Highway) under annual maintenance year 2025-26.
B.C. Work in Km. 32 to 57 (21 Km.) Tehri Hindolakhal Devprayag Vyasghat Bilkhet State Highway no- 49
Road safety work on the Late Shri Jagmohan Singh Negi State Highway No -09 from km 189.000 to 216.500
Renewal work of Pauri Khirsu Kherakhal Khankhara Motor Road (State Highway 50) from Km 7.500 to Km 12.000 by SDBC
Renewal work by BC in Pauri-Devprayag-Gaja-Jajal Motor Road (State Highway 31) under Annual Maintenance year of 2025-26.
Request for Proposal for procurement of Consultancy Services for Surveying of selected National Highway stretches with Network Survey Vehicle (NSV) in the State of Uttarakhand.
One Time Improvement for the stretch from Km 140.00 to 148.90 (Jhajhra to Ballupur) of National Highway No -72 (New NH-07) after transfer from NHAI.
Improvement/Renewal of Surface by SDBC in Km 1 to 5 of Bhikiasain-Chaukhutia motor road (State Highway No. 12) under State Sector.
Work of filling soil in the Part of Road damaged by disaster near Nausar bridge at Km 43 of State Highway No. 70.
Improvement/Renewal of Surface by SDBC in Km 1 to 5 of Bhikiasain-Chaukhutia motor road (State Highway No. 12) under State Sector.
Reconstruction and strengthening work of the damaged bridge near Uttaranchal University over Tons River at Km 143 of Dehradun-Herbertpur motor road (National Highway No. 72(07)).
Strengthening and Renewal work of Bahadrabad - Dhanauri - Imlikhera - Bhagwanpur - Gagalhedi State Highway-68 in District Haridwar Under Kumbh Mela 2027. (Km 1 to 4)
Protection and Trement work on Chronic Landslide Zones on Karnprayag Gwaldam Jauljivi state Highway no 11 km 166 hardiya Under Landslide Risk Mitigation Scheme
Patch repair work from Km 11 to 65 of Chakrata-Lakhamandal State Highway No. 18 under the Annual Maintenance for the year 2026-27.
Request for Proposal for procurement of Consultancy Services for Surveying of selected National Highway stretches with Network Survey Vehicle (NSV) in the State of Uttarakhand (Under Garhwal Zone)
One Time Improvement for the stretch from Km 104.00 and 114.00 to 140.00 (Dharmawala to Jhajhra) of National Highway No-72 (New NH-07) after transfer from NHAI.
Renewal work by PC in Ogla-Bhagichaira Pasma Haseneshwar Motor Road State Highway (Km. 1, 2 and 4) under the annual maintenance year 2026-27.
Under the deposit Scheme (NHAI) the work of repair and strengthening on National Highway No. 87 from Nariman Tirahe to Gaulapul in the Haldwani assembly area of Nainital district.
Renewal and improvement work by BM and BC in Champawat-Khetikhan section of State Highway No. 64 of Champawat district Under the Central Road Infrastructure Fund.
Construction work of CC road from main highway in Khatima Mandi area towards Bandia via canal, from approach road in Gram Sabha Pachpeda towards Ravinder Singh Rana pond and from Kolhu of Gram Sabha Jamour Shakeel towards National Highway via canal
Under the State Plan CM Ghosna No 586 2018 new construction work of motor road from National Highway to Kalyani Village 1 Km under Dunda Block of Yamunotri Assembly Constituency
Consultancy work for the construction of a 4-lane Access Control Corridor from km 514 (Lachhiwala) of National Highway No. 72 (07) via Gular-Sports Stadium to Raipur (Maharana Pratap Chowk)
Road Safety Work Of Uttarkashi Lambgaon Ghansali -Tilwara (State Highway-15) Chardham Yatra Motor Road from km 67 to 87 (Kemundakhal to Lata) Under Central Road Infrastructure Fund.
Construction of 70 M. Span Two Lane A Class loading Steel gider Bridge at Km. 1 on kosi river at state highway Khairna - Ranikhet Motor Road (Under CRF).
Renewal work by SDBC from Km 17 to 23 of Kalsi Chakrata (State Highway No. 20) road in Chakrata Constituency of Dehradun district under Annual Repair 2026-27.
Widening and strengthening in km 1 to 19 with paved shoulder on Roorkee - Laksar- Balawali Road, State Highway no 26 under CRF in district Haridwar in the State of Uttarakhand
Under Road Safety Scheme, financial year 2023-24, work of crash barrier, parapet, delineator, signage for State Highway under Public Works Department, Ranikhet in Salt Ranikhet constituency of Almora district
Construction of drains from Ghantakarn Chowk (the crossing point located on Premnagar Paonta Sahib road) to Jhajhra Bridge, on the Asharodi Bypass under construction near Jhajhra on National Highway No. 72 in Dehradun district.
Renewal and improvement work by BM and BC in Dhunaghat-Reethasahib, Taladi- Reethasahib and Reethasahib- Minar section of State Highway No. 64 of Champawat district Under the Central Road Infrastructure Fund.