Loading…
Loading…
226 live182 closing this weekmost from PUBLIC WORKS DEPARTMENT and MUNICIPAL AFFAIRS DEPARTMENT
226 results • Best match
Boyalghata Shyamnagar Polerhat Pakapole Bazar Bijoygunge Kanthaliya Bus Stop Road, from 0.00 km to 2.775 km, emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division in the District of South 24 Pgs.
Lauhati Bhangar Road, from 12.350 km to 12.760 km and from 13.00 km to 15.047 km, emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Emergent Repairing of Potholes of Hemtabad Bishnupur Road from 5.75 kmp to 6.50 kmp, 8.50 kmp to 9.50 kmn and 12.75 kmp to 13.25 kmp in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR CRRI New Delhi under Nadia Highway Division No II PW Roads Dte
Restoration of Sankrail Manikpur Hirapur bazar Road and Rajganj Sankrail Road with a link to N.H-6 under Howrah Highway Division in connection with repairing of faults for HV Cables by CESC Limited during the year of 2025-26.
Bagnan Mankur Road, from 0.00 Km to 3.00 Km and Service Road adjacent of Bagnan ROB from 0.00 Km to 0.415 Km, Emergent Patch Repairing work Howrah Highway Division in the District of Howrah during the Year 2026-2027
Jhantipahari Kashipur Road from Ch 1.00 km to Ch 5.00 km and from Ch 8.00 km to Ch 12.10 km (in stretches ) Restoration of flank by dressing and Chilchalling work under Bankura Highway Division in the District of Bankura.
Urgent Rain damage repairing work of Gobindapur By Pass to Mukundapur Road via Baganchara Bhaluka in patches from 5.5 km to 8 kmp of RHSD under Nadia Highway Division-II in the District of Nadia during the year 26_27
Maintenance of Earthen Shoulder and road side Jungle cutting in streches of Suri-Rajnagar Road (SH-6) from Ch. 7.00 kmp to 9.00 kmp and 14.00 kmp to 23.00 kmp under Birbhum Highway Division-II in the District of Birbhum
Emergent Repairing work of wearing course Bridge over Nowai khal on old Jessore Road from Doltala to Ganganagar Road at Ch. 1.40 km Under Barasat Bridge sub Division of Barasat Highway Division I in the District of North 24 Parganas.
Mahipal Chourangee More- Kantabari Road (VR) from 0.00 kmp to 7.00 kmp, Strengthening work and Construction of Passing Bays (with spacing 200m c/c along the length of the road) under Dakshin Dinajpur Highway Division in the District of Dakshin Din
Budpur Pairachali Road, From 0.00kmp to 7.00kmp, Widening (from 3.10 to 5.5 m) and Strengthening work including Re-construction of 7 nos of CD structure, 970 M Protective work and 1360.0 M Drainage work under Purulia Highway Division, RIDF XXXII
Construction of Single Cell 3.0m x 3.0m RCC Box Culvert at 6.125 km of Vandabari Mahapukur Road replacing narrow old and damaged double row pipe culvert under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur Project ID PD262753703S
Kolkata Basanti Road (SH-3A) from 5.00 km to 6.00 km and from 16.00 km to 20.00 km, emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Permanent Iron Fencing at median verge garden, Main Carraige way to Service road divider from 0.00 Kmp. to 6.150 Km. of Kazi Nazrul Islam Avenue (VIP Road) in connection with INDIA ENERGY WEEK 2027 under Barasat Highway Division No. - I
Urgent Rain damage repairing work in patches of Tarapur Balagarhghat Road with a link road to Rabanberlaghat Road at Link Road Portion from 0 kmp to 0.80 kmp of RHSD under Nadia Highway Division-II PW Roads Dte in the District of Nadia
Badkulla-Aranghata Road from 0.00 kmp to 12.50 kmp Strengthening work with Paver Block for a length of 6500 m including construction of 03 nos CD structures, 1635 m Protective works under Nadia Highway Division II in the district of Nadia under RIDF
Hiring of One (1) No. Motor Cab/Maxi Cab with diesel driven (BS-IV or higher emission standard) as Inspection Vehicle on monthly basis for the official use of the Assistant Engineer, Siliguri Highway Sub-Division-II, PW(Roads) Dte., Siliguri.(2nd Cal
Kamarpara Kurmail Chingishpur Road from 0.295 Km to 3.670 Km, 3.820 Km to 5.255 Km, 5.505 Km to 7.640 Km and 7.990 Km to 10.300 Km Strengthening work under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur under RIDF-XXXII.
Balance estimate for Urgent Restoration of Road surface from 0.35 k.m. to 0.413 k.m. and 0.485 k.m. to 0.543 k.m. (Barasat Bound Traffic Flank) of Airport Internal Slip Road from Airport 1 no. gate to 2.50 gate under Baguihati Highway Sub Division
Road restoration work for laying of DI and HDPE Pipe line for water supply scheme of PHED on Dumdum - Lauhati Road from 7.50 km.(Anjana Sofa Center) to 8.50 km (Lotus Hospital) under Barasat Highway Division No. - I in the District of North 24 Parga
Patch repair by WBM of Volka Road to Chepani Santinagar High Road from 3.00 km to 3.60 km, 3.90 km to 4.55 km, 4.80 km to 5.40 km, 5.60 km to 5.90 km under Alipurduar Highway Division in the District of Alipurduar during the 2026- 27
Patch repair by WBM of Volka Road to Chepani Santinagar High Road from 3.00 km to 3.60 km, 3.90 km to 4.55 km, 4.80 km to 5.40 km, 5.60 km to 5.90 km under Alipurduar Highway Division in the District of Alipurduar during the 2026- 27
Patch repair from 7.00 K.m. to 7.50 k.m. and 7.8 k.m. to 8.00 k.m. of Airport Flank main carraige way and 6.5 k.m. to 7.00 k.m. and 7.6 k.m. to 8.00 k.m. of Kolkata Flank main carraige way of K.N.I. Avenue (V.I.P. Road) under Baguihati Highway Sub Di
Urgent rain damage repairing work of Badkulla Aranghata Road in patches from 0 kmp to 2.50 kmp from 3 km to 8.50 km and from 10 kmp to 12 kmp in patches under RHSD of Nadia Highway Division-II in the District of Nadia during the year 26_27
Construction of Box Culverts 5 cell 5.00 m X 4.00 m and 2 cell 3.00 m X 3.00 m at ch. 6.90 km and 11.70 km respectively by replacing old and narrow culvert of Jayanti Dhawla Road under Alipurduar Highway Division in the district of AHD etc..etc..