Loading…
Loading…
226 live182 closing this weekmost from PUBLIC WORKS DEPARTMENT and MUNICIPAL AFFAIRS DEPARTMENT
226 results • Best match
Providing round the clock security by deploying 20 Twenty Nos. Unarmed Security Guards per day for guarding at different officesStackyardBunglow under Barasat Highway Division No.II in the district of North 24 Paraganas.
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR CRRI Uttar Dinajpur Highway Division
Maintenance of Earthen Shoulder and road side Jungle cutting in streches of Suri-Amjora Road from Ch. 4.00 kmp to 15.00 kmp under Birbhum Highway Division-II in the District of Birbhum.
Maintenance of Earthen Shoulder and road side Jungle cutting in streches of Rajnagar-Khoirasole Road from Ch. 0.00 kmp to 11.00 kmp under Birbhum Highway Division-II in the District of Birbhum
Engagement of 10 (Ten) nos. Security Personnel on purely temporary basis of different categories for guarding at Government Stack-yard, Office etc. under the control of the Executive Engineer, Alipurduar Highway Division
Dhupguri-Falakata road safety works at different locations (Near Ahhile Hotel), Near Forest Bunglow More (Black Spot), Near S.S.B. Camp under Alipurduar Highway Division in the district of Alipurduar during 2026-2027.
Barjora Maliara Durlavpur Road from Ch. 18.04 km to Ch. 18.34 km In streches reparing and Maintenance of road side drain Both Side under Bankura Highway Division in the district of Bankura.
Providing round the clock security by deploying 20 (Twenty) Nos. Unarmed Security Guards per day for guarding at different officesStackyardBunglow under Barasat Highway Division No.II in the district of North 24 Paraganas.
Emergent Potholes repairing work by Brick stiching from Ch. 20.60 Km to 21.10 Km in stretches of Kalaberia - Pirakata - Dhansole - Lalgarh Road under Midnapore Highway Division in the District of Paschim Medinipur.
Bibirhat Gotalahat Road, from Chainage 4.000 km. to 6.100 km, Surface repairing Work in different stretches under South 24 Parganas Highway Division, Public Works (Roads) Directorate in the district of South 24 Parganas.
Patun Jordighi Road from 0.00 Km to 4.00 km, Urgent rain damaged Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the district of Dakshin Dinajpur during the year 2026 27
Emergent Restoration in Patches of Basirhat Swarupnagar Road from 2.40 km to 3.70 km and 4.80 km to 6.90 km, under Barasat Highway Division No.- I in the district of North 24 Parganas
Sahu Bridge over Sahu river at ch. 6.10km on on Gondermore to Sahudangi Goramore approach side abutment protection work under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2026-27
Maintenance of Earthen Shoulder and road side Jungle cutting in streches of Durajpur-Bakreswar-Chandrapur Road from Ch. 7.40 km to 17.40 km under Birbhum Highway Division-II in the District of Birbhum
Chakberia Bhojerhat via Tardah Road, from 4.55 km to 10.69 km, emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Emergent Patch repairing work of Badu-Kharibari Road, from chainage 3.40 km to 6.40 km under Barasat Bridge Sub Division of Barasat Highway Division No I in the district of North 24 Parganas.
Emergent Patch repairing work of Aminpur - Boalghata Road, from chainage 1.80 km to 2.80 km under Barasat Bridge Sub Division of Barasat Highway Division No I in the district of North 24 Parganas
Providing of road safety measures i.e. bituminous speed breakers, road marking, road studs, hazard board on Fatapukur to Gadra road chainage 4.00km to 9.70km under Jalpaiguri Highway Division in the dist. of Jalpaiguri
Ranaghat Aranghata (New) Road from 6.50 Kmp to 7.50 Km emergent patch repairing AND maintenance work under Quality Control Sub Division No. I of Nadia Highway Division No. II during the year 2026-27
Urgent Rain damage repairing work of Santipur Municipal Link Road in patches from 91.05 km to 91.75 km of RHSD under Nadia Highway Division-II in the District of Nadia during the year 26_27
Sirkabad-Ajodhya-Bagmundi Road, from 7.00 Kmp to 9.00 Kmp and 11.00 Kmp to 17.00 Kmp, Maintenance and Repairing work including Fog seal etc. in stretches under Purulia Highway Division in the district of Purulia.
Construction of Single Cell 3.0m x 3.0m RCC Box Culvert at 1.35 km of Samaspur Baghan Road replacing narrow of and damaged slab culvert under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Balance work for maintenance and patch repairing from chainage 0.000 Kmp to 5.00 Kmp of Bishnupur - Radhamohanpur Rly. station road under Midnapore Highway Division in the district of Paschim Medinipur during the year 2026-27.
Mahishadal Geonkhali Road, from 0.000 kmp to 8.500 km Strengthening work (5.50 M Carriageway) under Tamluk Highway Division, P.W.(Roads) Dte. In the district of Purba Medinipur during the year 2026-2027, under RIDF XXXII
Gopiballavpur to Nayagram Road (SH-9) from 35.00km to 41.600km for the work of Strengthening (Carriageway 7.0 m) Including reconstruction of 2 nos. CD Structures and Protective work under Jhargram Highway Division, P.W.(Roads) Dte.
Daulatpur-Harirampur-Dehaband (MDR) Road from 16.00 Kmp to 20.60 Km, Strenghtening work (Carriageway 5.50mtr.) including 4 nos culverts Replacement and 400m PCC Drain under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur.
Gangajalghati - Saltora Road from Ch. 0.00 km to Ch. 22.00 km., Widening and Strengthening work including construction of 15 nos. Cross Drainage Structure and allied work under Bankura Highway Division in the District of Bankura.
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR CRRI, under Dakshin Dinajpur Highway Division, P.W.Roads Dte. during..
Urgent Rain damage repairing workof Dignagar Badkulla Road in patches from 1 kmp to 5.5 km, of RHSD under Nadia Highway Division-II PW Roads Dte in the District of Nadia during the year 26 27
Dalgaon-Gomtu (Bhutan) road in stretches from 0.800km. to 1.80km., 2.50km. to 3.00km. and 6.80km. to 7.30km. Repairing of potholes by PC and SC under Alipurduar Highway Division in the district of Alipurduar during 2026-27.
Simlapal Sarenga Bamundiaghat Road between Ch 21.48 km and 21.53 km Construction of RCC Drain by replacing damaged and collapsed portion of existing drain under Bankura Highway Division , P.W. Roads Directorate in the district of Bankura.
Saltora-Murulia Road from 0.00 km to 12.70 km, Strengthening work including 4 nos. CD Structures, 600 mtr. Boulder Sausage and 500 mtr. Drain under Bankura Highway Division in the District of Bankura under RIDF-XXXII.
Urgent installation of Bituminous Hump and other allied work at Buxa Jayanti Road inside the Buxa Tiger Reserve forest and Kalchini Patkapara Road under Alipurduar Highway Division in the District of Alipurduar during the 2026-27
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR CRRI, New Delhi for Bankura Highway Division 2nd call
Peshoke - Mungpoo Road from 0.00 km to 17.00 km, construction of 3 nos. Box Culvert, rehabilitation of Damage Culverts and parapet along with protective works under Darjeeling Highway Division in the district of Darjeeling Project Id PD262753498
Urgent Rain damage, repairing work of Haripur Baganchara Road (in patches) from 0.0 km to 2.0 km, of RHSD under Nadia Highway Division-II PW Roads Dte in the District of Nadia during the year 26 27
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR-CRRI, New Delhi under Alipurduar Highway Division, P.W.(Roads)Dte.
Some Emergent work for office of the Executive Engineer, Southern Highway Design Division I, Public Works, Roads directorate 2nd floor, Assistant Chief Engineer, Planning, PWDte. 9th floor, room no 808 to 811 under Executive Engineer, Design Divisi
Balurghat more to Alipurduar-I Block border road in patches from 0.20km. to 1.60km., 2.20km. to 3.00km., 4.18km. to 5.14km. and 5.16km. to 5.64km. repairing of potholes along with PC and SC work under Alipurduar Highway Division
Urgent Restoration of Main Drain, cross surface drain from Haj House to Kaikhali Crossing of K.N.I. Avenue (V.I.P. Road) under Baguihati Haighway Sub Division under Barasat Highway Division No.- I in the District of North 24 Parganas
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR CRRI, New Delhi under Nadia Highway Division No-I. PWRD
Mothabari to Sadullapur Road from Ch. 0.00 Kmp To 6.90 Km. (Except Rigid Pavement of 440 m and Mastic Asphalt of 690 m), Surfacing work under Malda Highway Division in the District of Malda, Project Id PD262752654S000
Surjopur Dhamua Road, from 0.00 km to 1.00 km and 5.00 km to 6.80 km emergent rain damage patches repairing work in different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Anandapur(Ruby) to Natunhat Road via Kheadah-Boynala Pratapnagar-Harapur Road, from 5.00 km to 7.00 km,12.00 km to 15.00 km emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division.
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR AND CRRI, New Delhi under Midnapore Highway Division including loading
Temporary patch repair of potholes using instant all-weather pothole-repairing compound (supplied by the Department), as and when required, at different roads under Barasat Bridge Sub-Division of Barasat Highway Division No. I, in the district of
Repairing Potholes Work in Patches due to Excessive Rainfall on Bishnupur-Aishmali Road from Ch 9.00 Km to 10.00 Km under Quality Control Sub Division No. I of Nadia Highway Division No. II during the year 2026-27
Temporary Restoration Work in Patches due to Excessive Rainfall on Nokari-Aishmali Road from Ch 7.00 Km to 8.00 Km under Quality Control Sub Division No. I of Nadia Highway Division No. II during the year 2026-27
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR-CRRI, New Delhi under Birbhum Highway Division-I. P.W.(Roads) Dte
Providing and deploying 7 (Seven) Nos. Security Guard per day for Care-taking and Guarding Govt. property within the campus of different Highway Sub-Divisional Offices at Bhatar-I and II/Katwa/ Ramjibanpur, Stackyard, Inspection Bungalow and Rest....