Construction of Indian Institute of Information Technology work Pune (Phase-I) including Directors Residence, Academic block, 2 Nos. Boys Hostel, 1 No. Girls Hostel, Staff Housing and other service block and Civil, Electrical and Mechanical External ... horticulture, HVAC , ...
Custom Bid for Services - CONTRACT ON 98% UPTIME BASIS FOR ROUTINE, PREVENTIVE AND BREAKDOWN MAINTENANCE OF PLANT & EQUIPMENTS OF CENTRAL SERVICE AREA Similar Category Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
Est. No. OW/NVB/7928/2023-24 Providing power supply to UPS for Data Centre at Basement and power supply to Data centre HVAC load near ramp of Hon CM in Dome Building OF NavinVidhanBhavan Mumbai
Est. No. CR/ NVB/7654/2023-24 Providing fully comprehensive servicing maintenance for automatic fire fighting system with Diesel pump,fire damper, dampers for centralized HVAC duct fire sprinkler system installed at NVB,Mumbai. (12 Months)
E.No. 0850 of 19-20 Prov. MEP Design consultant for MEP designing estimation and works progress monitoring of HVAC system for various sections at Currency Note Press - Central Government Undertaking Jail Road, Tal. and Dist. Nashik.
Est No SR/ MESD/ MS/ 8039/ 2025-26 Providing Renovation and alterations to VRF system and Firefighting system to Room No.722, 103 West Side, 401 West side, 6th floor Main building and Room No.138 ,336, 443 ,501 Annex Building, Mantralaya ,Mumbai.
Est. No. OW/C/HA/1370/2025-26 Providing addition and alteration to existing VRF type Centralised Air Conditioning system for creation of 3 chambers in Room No. 58 at 3rd mezzanine floor, Main Building, Bombay High Court, Fort, Mumbai 32. (2nd Call)
Est.No.OW/C/HA/6210/2023-24 Providing replacement of out-dated centralised VRF type air conditioning system installed at the Bar Association room nos. 18,35, 36,38,39,56 57 at High Court main building and for the Lady Advocates room on 2nd floor, HC
Est.No. ATAL/NVB/DB/9782/2026-27 Providing fully comprehensive annual maintenance to VRF air conditioning in first floor minister cabins room no 117, 120, 121, 122,123, 124, 125, 130,134, 135, 136, 136A 136B, 136C, 136D, 136E, 137, 138, 139, 139A,139
Ductable cooling system, Air cooler system installation Amt, Providing and fixing of Jindal duct work, Inside insulation, providing and fixing of aluminium powder coated double air grills, flexible canvas, Stand for Coling machine ms with ms angle, Civil work like breaking of walls with transportation etc
MOEI & Fans, R/M of P/sets, Lifts, Air Conditioning Units and Water Cooler, D.G. Set, F.F. Equipment and F.A. System at RPQS Bldg., Sewri, Mumbai. Subwork/Packages: Fully comprehensive maintenance of split, multi split, window, ductable cassette type Air-Conditioning units and Water cooler units.
Manpower Outsourcing Services - Minimum wage - Skilled; Others; Electrician, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; Electrician unskilled, Manpower Outsourcing Services - Minimum wage - Skilled; Others; Fitter General ... Others; AC Plant Operator
UNDER - Anusuchit Jati Navboudha Ghatkachya Wasticha Vikas Yojna
NIT
Est no 125 /2021-22 Providing HVAC System for ward No 07 converted into SICU on IInd floor of IPD Building in premises of Dr. Shankarrao Chavhan Govt. Medical College and Hospital at Vishnupuri, Nanded, Dist. Nanded
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Onboard Indian Naval Ships at ND(Mbi); Rate agreement for two years for removal, cleaning, fitment of trunknigs and associated fittings of HVAC system onboard Indian Naval..
comprehensive servicing and maintenance contract of h. v. a. c. system installed at various hospitals in eastern suburb area for a period of 5 years from the date of issue of letter of acceptance.
Office Kpat, Plastic Office Chairs, Water Chiller, Fogging Machine, Kitchen essentials for Anganwadi, Dual Waste Bin, Trolly Speaker, LED smart android TV, Educational software for School, Water Purifier, HDPE Tank BOQ Title Supply and installation of Material as per BOQ
Est no OW GT 5698 2019 20 Supplying installation testing and commissioning of complete Electrical Installation Including Roof Top Solar System HVAC System Fire Fighting FAS System CCTV AV Projector System 10 Passenger 3 Nos Lifts With Ne
UNDER - 15 Th FINANCE COMMISSION FUND
Est. No. ATL/C/HA/1061/2025-26 Providing fully comprehensive maintenance contract of Daikin make VRF air conditioning system installed at Honble Judges Lounge and Conference Hall at room no. 70/71, and at room no 69, Third Floor of Main Court Buildi
Construction of IITB Research Park Ground plus 10 Storeys including finishing work water Supply and sanitary installations Electrical installation and cable laying firefighting Systems Automatic fire alarm and PA system Lifts HVAC development Work at IITB Bombay Powai Mumbai SH :Providing services of Computer Operator and Multi Tasking staff for diary dispatch managing office record cleaning etc in the office of CE cum ED Mumbai and EE and SM II as per direction of Engineer in Charge Subwork/Packages: Providing services of Computer Operator and Multi Tasking staff for diary dispatch managing office record clearing etc in the office CE cum ED Mumbai and EE and SM II as per direction of Engineer in Charge
UNDER - 15th FINANCE COMMISSION FUND
Est SDR/ MESD/ MS/ 147 of 2021-22 Prov. Replacement of 3 nos of Cooling Tower and Condenser water Pipe Line with necessary Speirs For 300 TR Capacity Ms. Daiking Make water Cooled packaged Chiller A.C. Systems Installed For Mantralaya Main Building
RO Filter, MS Chair MGR, Digital Slate, Water Cooler, Interactive Pannel, Weight Scale, 36 Watt Street Light, 60 Watt Street Light, Office chair, 2 Tone Chiller, Ciller Stabeliser, Water Jar, Automatic Sanitiser Dispensar, 0.5 kw Solar power pack BOQ Title wadali boq
Supply and Installation of Heavy Duty Horizontal Double Mounted 5KM Range Siren, Underground Cabling of Signal Cable with Ducting, Marking as per SoW, Overhauling and Integration of Existing Siren in New System, 3 Phase UG Armoured Cable from MES distribution point to Roof top, Grouting Foundation Cementing and Weather Proof Cabinet and Misc Works
Est.No./ OW/Pbn/ 109 /2024 25 Providing EI works, Street lights, Lift (02 Nos) , Fire Fighting System, HVAC System, Solar Rooftop,Solar Hot water System an 200 KVA Trasformer in Newly Constructed Operation Theatre Building in the premise of Distric
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - at bidders premise; Rectification of roof leakage and seepage at SLQ TG Hall LT SWGR WIS HVAC BHS LT SWGR and other areas at BHS Complex by epoxy based waterproofing tre..
C/o Indian Institute of Information Technology work Pune (Phase I) including Directors Residence Academic block, 2 Nos. Boys Hoste, Staff Housing & other service block and Civil, Electrical & Mechanical External Developments and Bulk service ... horticulture, HVAC , ...
Continegencies of (1) Operation and routine maintenance of electrical & mechanical installation at ICMR-NARI, Bhosari, Pune. SH: Replacement of damaged insulation of HVAC system and repairing of cassette units in LAB building. (2) MOEI & Fans, RMO of Pump sets, lifts, Substation, DG Sets, AC system & Firefighting system at GST Bhavan, ICE House Complex, Pune. (3) Operation and maintenance of E&M services, substation, AFAS, Fire-fighting & DG Sets at NIASM, Malegaon, Baramati, Pune. SH: O&M of Substation, DG set, AFAS, down comer system & drinking water pump set. SH: Hiring of Inspection Vehicle for Sub-Division Office.
UNDER - 15 Th. Finance Commission Years 2021-22
UNDER - 15th FINANCE COMMISSION FUND YEARS 2020-21.
comprehensive servicing and maintenance contract of h v a c systems installed at various hospitals and offices in eastern suburb area for a period of 3 years from the date of issue of l. o. a.
1 INSTALLATION ANDCOMMISSIONIG OF 1000 LPH R.O UV UNIT 2 TON CHILLER,RO PUF AND ALLIED WORK 2 SOLAR BASED DUAL PUMP 3 INSTALLATION OF OFF GRID SOLAR ENERGY BASED STREET LIGHT 4 INSTALLATION OF OFF GRID SOLAR ENERGY BASED POWER PACK SYSTEM AT JAMBHALI
Providing Internal EI 08 Passenger lift 2 nos Rooftop Ongrid Solar Energy system 320 KVA DG set With AMF Panel Water pump system Street light HVAC System and Fire fighting with Fire Alarm System at New Gov VVIP Subhedari Rest House Aurangabad
2 Wheeler Bike or Scooter Assembly Set, Transmission Gearbox Demo Kit, Mini commercial Vehicle Chassis Structure, Rear Axel, Steering Wheel and Tyre Systems assembly on stand, HVAC Demo Kit, Instruction Kit for Charging System, Instruction Kit for Starting System, Electric Vehicle KIT Chassis
as per Schedule C and BoQ
Annual Repair and maintenance of Electrical and mechanical services in ESIC Hospital Building and Residential Colony at Tarabai Park Kolhapur Maharashtra Subwork/Packages: Operation of 02 nos 100 TR AC Chiller plant 20 KLD ETP and 100 KLD STP and Providing of Split ACs for UPS rooms
Est No OW/NVB./DB/7348/2024-25 Prov VRF based air conditioning to room no 117, 120, 121, 122, 123, 124, 125, 134, 135, 136, 136A 136B, 136C, 136D, 136E, 137, 138, 139,1 39A,139B,139C,141,141A, 141B, 141C, 141D in first floor as per civil work at NVB
Est No SubWork-1 OW/ NVB /7898 / 2023 -2024 Prov. addition and altertion to EI cables,switchgears, wiring, lighting as per civil work in Ground Floor passage at Navin Vidhan Bhavan, Mumbai Sub Work 2 OW/ NVB /7901 / 2023 - 2024 Prov. HVAC at NVB
Scheme - 15 Th. Finance Commission Years 2021-22
UNDER ANUSUCHIT AND NAVBOUDH GHATKACHA WASTICHA VIKAS YEARS 2020-21
UNDER - 15 TH FINANCE COMMISSION
Epoxy Based Zinc Phosphate Primer (two Pack) Epoxy Based Zinc Phosphate Primer (two Pack) as per IS 13238 (Q3), Cable Trunking and Ducting system for Electrical Installations (Wiring duct) (Q3), Cat 6 Cable for Indoor Use (Q2), Curtain Pipe, Sider and mounting bracket (Q4), Junction Box for Lighting (Q3), Networking/Server Rack (Q2), wooden flooring (Q3), Professional Large Format Display (Q2)
1. Construction of Indian Institute Information Technology Pune (Phase-1) including Block, 2 Nos. Boys Hostel 1 Nos. Girls Hostel Directors Residence Staff Housing, Academic & Other Service Block and civil, Electrical & Mechanical, External, ... horticulture, HVAC , ...
S.R.No.N2/ 474/2024-25 Prov Repairs of HVAC System at Eye,Ent,Minor, Emergency OT Anesthesia OT, and Preoprative Area, ICCU Ward No.15 ICCU Ward No.30, ICCU Ward No. 6 Blood Bank, Ortho OT Surgery OT, Sonography, IPD, Sonography and Burn Ward etc in
Custom Bid for Services - Job Contract for Comprehensive Maintenance of Air Conditioners at ONGC Nhava Supply Base, Nhava for period of three (03) years Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Operation And ... Of HVAC System ...
Customized AMC/CMC for Pre-owned Products - Comprehensive AMC (Two Years) of multi make split ACs (160 Nos); As per tender; Comprehensive Maintenance Contract (CMC); As per Tender and BOQ; Yes, Customized AMC/CMC for Pre-owned Products - ... COOLED PACKAGE AC UNITS ... TR VRF AC ...
PAC BID FOR REPAIRING AND OVERHAULING OF INDOOR UNIT OF 11 TON HITACHI MAKE DUCTABLE AIR CONDITIONERS, SUPPLY OF FAN BLADE FOR OUTDOOR UNIT, DANFOSS EXPANSION VALVE, FILTER DRYER R410 DANFOSS MAKE, GAS CHARGING R410 FOR HITACHI 11 TON, NITROGEN CYLINDER FOR FLUSHING AND LEAK TESTING OF 11 TON RX3 AC SYSTEM, FABRICATION AND ERECTION OF MS PLATFORM FOR HITACHI 11 TON
Custom Bid for Services - CAMC of 1 TON Split AC, Custom Bid for Services - CAMC of 1 and half TON Split Ac, Custom Bid for Services - CAMC of 2 TON Split Ac, Custom Bid for Services - CAMC of 2 TON Slimline AC, Custom Bid for Services - CAMC of 4 ... Auditorium Central AC , ... Gymnasium Central AC , ... Court Central AC Bid ...