Loading…
Loading…
9,651 results • Best match
REPAIRING DAMAGE TO SUPER-PASSAGE AT DY-2 OF BLMC MAIN CANAL DUE TO FLOOD UNDER BLIS AFZALPUR.
Desilting of intake canal and intake approach towards the pump house of Ramathal(Marol) Ist Stage pump house
Restoration of Canal Bed at Ch. 16.50 to Ch. 45.50 at Selected Reaches of RBC of BNT Project
Consultancy services by providing surveying, designing, and estimation of right bank canal of Narihalla Dam in Sandur Taluk
Repairs & Maintenance of Canal Network & Distributaries with Structures & Outlets Gates of Hattikuni Project for the year 2025-26
Construction of an open well for drinking water near the GLBC canal in Dandapur village of Gokak taluk
Repairs to box canal and improvements to damaged bund at Ch.2.00 km of D-56 A HLBC
Removal of Jungle from ch 24.0 km to 29.00 km and silt in vulnerable reaches of DDUrs Canal.
Clearing of thick jungle and removal of silt in RCD Canal and pump house area under Bannahallihundi LIS
Repairs to Antharavalli tank canal gate and reconstruction of CTC to 5th minor of 24th distry of HCC
Providing out sourcing manpower for No.5 VC sub-division Ramaswamy canal management for the year 2025-26
Excavation for Side Drain from Km. 31.00 to 32.70 (selected reaches) of RBC Main Canal under BNT Project
Removal of silt and weeds in selected reaches from Ch 0.00 Km to 18.00 Km of Rajaparameshwari canal
Repairs to the Gates of Distributory No. 6A, 12, 13, 16-17, & 22 of Malaprabha Left Bank Canal.
AME (Manpower) of Canal Ch155.00 to 159.00 km and Dy 39,40,41,42 of IBC for the year 2025-26
Removal of silt and jungle clearance under West main canal upto Janamatti Tank outlet under Herkal North LIS
Removal of Silt and Jungle in Selected Reach of NBC Main Canal FROM KM 25.740 to KM 30.00
Remodelling and Improvements to distributaries No. 1 to 18 of Harangi Left Bank Canal under Harangi reservoir project
Raising of Plantation at Devar Hipparagi town and canal side under KFDF Flexi B. head during 2025-26
Construction of CC Road and Chain link fencing near Intake structure of Upper Bhadra Canal Near Bhadra Reservoir.
Annual Repairs to Main Canal And Laterals of Sanyasikoppa Lift Irriagtion Scheme for the year of 2025-26
Spacial Repair to CC Lining at selected Reaches of MLIS Salawadagi Main Canal for the year 2025-26
Removal of Jungle in from ch 0.00km to 5.50km of Lateral- 6 of D-24 of D.D.Urs Canal
Raising of Monsoon roadside plantation Tekkalakote to Tekkalakote Canal Road (Sirigeri Road) of Siruguppa S.F Range (Unit-1)
Improvements of Service Road and Connected Roads under Shimsha Right Bank Canal of Maddur Taluk and Mandya District.
Removal of Silt and Jungle in Selected Reaches from Ch 38.00 Km to 55.00 Km of SRDN Canal.
Construction of CD to 40/2 distributor canal near gunjalli reservoir in ward no 13 TP Turvihal limit
Strengthening of Head work and Allied works in KM No 50 of GLB Main Canal at Mugalakod Chowki
Improvements of Canal and Atchkat Road Under Kadalur Tank and Kadalur LIS in Maddur Taluk and Mandya District.
Construction of additional CTC at Ch 28.360 KM of Balundagi Lift Main Canal in Afzalpur taluka under BLIS.
Construction Of Drain From Main Canal To Mariyamma House at Hanchinal Camp In Sindhanur Taluka Of Raichur District.
Raising of plantation at Ratkal Cross to Annaveer Bhadreshwar Temple Canal Side 3 Km in Chincholi T Range
Plugging leakeages to Aqueduct in chamarayanakote branch canal and reconstruction of damaged box drain in dy5 of HRBC
Removal of silt and weeds in selected reaches from Ch 18.00 Km to 36.00 Km of Rajaparameshwari canal
Removal of silt & Jungle in Dy.64, 65, 66, 67, 68 and Hoskote tank Sluice canal under HRBC
Clearing encroachment and excavation for trench to Valageremenasa tank coming under the atchkat of Hemavathi left bank canal
Gate repairs to Akkisagar-1 Disty and Akiisagar-2 Disty of GRBC Main Canal
Supply of Various categories of Manpower required for water management under Annual Maintenance of Canal and Vehicle crew charges KA-17-G-0581 for the year 2025-26 Pertaining to KNNL No.1 Bhadra Canal Sub Division, Davanagere
Removal of Jungle clearance and silt Selected Reaches in Bilagi Branch Canal Km 25.00 to Km 45.00 and South Branch Canal Km 33.00 to Km 36.00 and other connected networks other repair works coming under Bilagi subdivision for the year 2025-26
Hiring of machineries for clearing jungle in Madanahally branch and NRBC main canal from Ch.0.00Km to Ch.38.50Km and removal of Silt in Madanahally branch under NRBC and main canal from ch.0.00 to 38.50Km of NRBC for the year 2026-27
Improvements to draft canal road of Mantrikere, Construction of Slab Culverts and filling breached portion of draft canal of Mantrikere of Aralihallil village and Slab culvert to Sy no, 160 Vasanth and Suresh lands of Seetharampura village of Bhadravathi taluk. Package No.1
Supplying of Diploma Engineers, Jeep Driver for KA-45 , M- 4563, KA-45, M-4648 Computer operators, Sweepers, watchmens, Peons and Mazdoor for No.3 Harangi Canal sub division, Harangi canal Division and Harangi colony of Saligrama for the year 2026-27
Removing slipped earth, jungle, obstructions to water flow,in canals.
REMOVAL OF SLIPPED EARTH JUNGLE AND OTHER OBSTRUCTIONS IN CANALS
CLEARING OF JUNGLE AND OBSTRUCTIONS IN CANALS OF MAYASANDRA TANK
REMOVAL OF SLIPPED EARTH JUNGLE AND OTHER OBSTRUCTIONS IN CANALS
Renovation of roof and other repair works to Inspection Bungalow, Division office building and Sub Division office buildings at Dupadhal Irrigation colony
Supply of Man power required for Water management of UTP Main Canal and Distributary network and Group D/Attender pertaining to UTP Sub-Division No.2, Ranebennur for the year 2025-26
Providing water management to MRBC main canal, distributaries, sub distributaries and laterals under Mallapur sub division
Providing water management to MRBC main canal, distributaries, sub distributaries and laterals under Belavanaki sub division