Loading…
Loading…
9,651 results • Best match
Removal of Jungle and Silt Clearence from Ch. 20.00 to 22.87 km of Arakera Branch Canal of D-9 (A) of NRBC
Removal of silt and Jungle Clerance From km 0.00km to 1.00 km of Lateral no-02 of Sonthi Branch Canal of SLIS
Consultancy Services for Survey,preparation of DPR,Design & drawings for the Modernization of Distributaries & its Minors of Marur Branch Canal under HRBC
Improvements to road and canal in Srinivasapura and Ranganathapura village coming under the atchkat of Lat-8 of D-24 of DDUC
Improvement of road from Rainapur Toranagatti Road to Canal, from Chainage Km 0.00 to Km 0.250 in in Yaragatti Taluk Belagavi Dist.
Removal of Silt and Jungle from km 100 to 104.850km (in Selected Reaches) of GRBC Main canal for the year 2025-26
Restoration/Reconstruction of Open Trough Acqaduct at Ch. 4.400Km of RBC Main Canal under Upper Mullamari Project of Basavakalyan Taluka Bidar District.
Material Procurement For construction of canal from N V Gangadarappas Farm to clean drinking water plant in honnemaradahalli village in channagiri taluk
Removal of jungle and other debris/wastes obstructing the main canal at Ch 170.00 to 178.00 Km under KRBC using hydraulic excavator.
Special Repairs to damaged Canal lining Ch 10.00 to 20.00 Km of WBC and SR in selected reaches of WBC under RLIS
PROVIDING ASPHALT TO ROAD FROM GODDANAPURA -MARALURU VILLAGE TO RAMPUR CANAL AND SERVICE ROAD OF SD-2 IN DY-69400 OF DDUC
Puttur CMC limit Desilting Work Main Drain (Raja Canal) From Tenkila to Kallimar and kallimar to Yelmudi and Yelmudi to Adharsha hospital
Construction of Protection Wall and Raising Embankment from Ch 6.200 to 6.500 km of Arakera Branch Canal of NRBC Distry 9 (A)
Providing out sourcing manpower for No.5 VC sub-division Madhavamantri canal management and computer operator & drivers for the year 2025-26
AME of Canal for the year 2026-27 of Distry No.18 of NRBC from KM 20.00 to 40.00 including Direct Laterals
Raising of Monsoon Plantation from Mangaloor Maala to Hunasegala Canal side of 3 Km at Hunsur Social Forestry Range during 2026-27
Removal of silt ffrom Ch 0.00 to 17.00 Km in Karimuddanahalli RBC & 0.00 to 11.00 Km of Karimuddanahalli LBC Under Uddur Canal
Providing out sourcing manpower for No 1 Bannur sub-division Thuraganuru Branch Canal management& computer operator & drivers for the year 2025-26
Removal of jungle and other debris/wastes obstructing the main canal at Ch 160.00 to 165.00 Km under KRBC using hydraulic excavator.
Repairs to the Gates of sub Dy 12,17, 19,21 and 22 of Dy.37 of MLBC Canal for the year 2025-26
Supply of computer operator and other manpower under jurisdiction of no 12 hemavathi canal subdivision bellur cross for the year 2025-26
Providing basic aminity for J- block reach of RHLD-1 canal of Khot tota in Examba village of Chikodi Taluka Continuation work
Plugging of leakages in CRBC from ch.0.00km to 63.00km and from ch.0.00km to 39.00km under CLBC canal (at selected reaches)
AME of JBC main canal from Ch 20.00 to 40.00 km including its Distry No 7,7A & 8 for the Year 2025-26
Removal of jungle & silt in km 188,189 ,192,193 and providing protection wall near syphon at Ch.187375 m of TBC Main canal.
Providing basic facility to Khadaklat village in VPC No 778 under CBC Canal Km No 87 in Chikodi Taluka of Belagavi district.
Supply of manpower for Canal water management (Sowdies) and outsource employees to No.2 CNNL Subdivision Doddakuncha for the year 2025-26
Maintenance of 1st year plantation at Kirugavalu Channapillekopplu Canal Side -3km of Malavalli Range under the Scheme RSP-139 during 2025-26
Raising of Monsoon Road side Plantation at Sirwar Canal to Kyadigera cross Road Side 3.00 Km during 2026-27 SF Range Deodurga
Plugging of leakages in Escape sluice at Ch. 49.125 km and Canal bund at Ch.35.00 km to 45.00 km of CRBC
Maintenance of 1st year old plantation from Devasamudra Canal To Kampli main Roadside of Ballari S.F- 4 KM (unit-01)-CALL-04
Construction of RCC Trough and other Improvement works in Uddi nalas and Minors under R.P canal and HHLC in T. Narasipura taluk
Desilting of Storm Water Drains, Secondary Drains, Median drains and Canal in ward no.21,24 and 25, Zone-02 of SCC limits
Providing New Emergency gate in Left Bank Canal Sluice of Bhadra Dam including repairs to Sill beam groove portion of Emergency Gate.
Raising of Monsoon Plantation from Channagere Road to Harangi Canal side of 3 Km at K.R.Nagara Social Forestry Range during 2025-26
Improvements to Road From Chennur Cross to Bailapur Thanda Canal in Hunsagi Taluka, Dist. Yadgir (Under CMIDP for the year 2025-26)
Removal of silt and Jungle Clerance From km 2.00km to 3.00 km of Lateral no-07 of Sonthi Branch Canal of SLIS
Supplying manpower for watch and ward of main Canal from 95.00 to 120.40 Km of TBC for the Year of 2026-27
Maintenance of 1st year Plantation at Devar Hipparagi town and canal side & Other road side under Flexi B. head during 2026-27
AME of Canal for the year 2026-27 of BD-2,BD-4,&BD-5 and its Laterals NRBC Distry No.15.
AME of Canal of Dy-25 to D-26 and their Branch Distributaries and laterals of MBC for the year 2026-27
Plugging of leakages to damaged bund of chandagalu left branch, chandagalu right banch , odeyarapura right & left branch, kallahalli branch under RSM canal
AME of JBC main canal from ch 00.00km to 20.00km including its Distry No 1 to 6 for the year 2026-27
AME of JBC main canal from Ch 20.00 to 40.00 km including its Distry No 7,7A & 8 for the Year 2026-27
Repair to CR/Escape at Ch 22.980,37.980,14.520, and Minor at Ch 29420 under Malaghan west West Canal for the year 2026-27.
Repairs to CD, lining in selected reaches of Dy No-12, and 13 of MLI west canal for the year 2026 - 27
REPAIRS TO BREACHED SECTION OF CANAL FROM CH.10 KM TO CH.14.00 KM OF GBC DUE TO FLOOD UNDER BLIS AFZALPUR.
Restoration of Delivery chamber & Providing Irrigation facilities to areas of FC No 5L coming under Ankalgudiketar Distributory of Siddeshwar WUCS for the year 2025-26
Improvements to damaged CC lining & CD works, removal silt & jungle, construction of inlets at selected places to avoid repeated damage to canal in km 1 to 5, 9 to 13, 15 to 17 km of Dy-6 & km 246 to 258 of UTP main canal damaged due to high flood.
Maintenance repairs and improvement works in 60th, 61 th, 62nd PO canal and Javarayi kaluve AT ch 0.00 km to 0.850 km, 77th PO AT ch 0,00 to 1.200 km, 78th P0 AT ch 0.00 to 1.500 km and 80th PO AT ch 0.00 to 1.400 km under CDS Canal.