Loading…
Loading…
9,651 results • Best match
Construction of Vaddu (Pickup) & Reconstruction CTC, Box Drain in DPO 211A to 214 Achkat area at Halla portion under CDS canal
Improvement and Repair of at ch 22.222 km Head wall for Sides RCC wall main canal in 9th distributory under NMBC
Construction of Pipe Culvert in Km No 4 & Extension of Combined Structure at Ch 4.300 of Chinchali Main canal & Other works
AME of Canal for the year 2025-26 of Distry-17 of NRBC from KM 0.00 to 13.00 including Direct Laterals.
Removal of silt and jungle in selected reaches of branches in main canal coming under Mlbc for the year 2026-27
Construction of road from Operation camp of Kalluru village to 98 Distributery Canal via Seetanagar road ( 2.50 Km) in Manvi Constituency.
Maintenance of 2nd year plantation at Kirugavalu Channapillekopplu Canal Side-3km of Malavalli Range under the Scheme RSP during 2026-27
Filling up of Nagathan tank and Hunshyal Tank off taking from distributery No 1 of TBC comes under Bijapur Main Canal
Removal of silt and jungle in selected Reaches of Shanku Teertha Pick-up Canal from Ch.0.00 KM to 8.00 KM.
AME of canal Dy-25 to Dy-26 and there Branch Distributaries and Laterals of MBC for the year 2025-26
Improvements to Kodi canal and waste weir of Ooramundinakere in Chimanuru village of Heggodu GP in Soraba Taluk of Shivamogga dist.
AME of Canal for the year 2024-25 of NRBC D-17 from KM 0.00 to 13.00 including laterals/sub-laterals.
DIVERSION OF YENNEHOLE LEFT BANK CANAL AT KPTCL 2x500 MVA 400/200 KV SUB STATION AT KADAKOLA IN MYSURU TALUK & DISTRICT
Hiring of machinery and labours for removal of silt from ch.5.00 km to 10.00 km of Kabini Left Bank Canal.
Arresting of joint leakages of Tidagundi branch canal viaduct from chainage 2.70 km to 17.43 km under Mulwada LIS stage - III
Reconstruction of damaged CTC, POs, Sopanum, Cattle Ramp and Improvements to 3rd, 7th Dy and Holalu Pick up Canal under OMBC
Supplying of manpower for the maintainance of No.9. Hemavathi canal sub Division office in Gubbi for the year 2025-26
Providing basic aminity to J block of RHLD canal reach of RayaJadhav,Mali thota in Examba( Ullagaddiwadi) village of Chikodi Taluka
Removal of Jungle and Improvements to SR and IP From Km130.00 to 137.168(Excluding aqueduct portion ) of Chimmalagi East Main canal
Providing street lights from the Tunga Canal bridge near Sevalal Layout to the Sri Shivakumara Swamy Free Hospital in Shivamogga city
REPAIRS TO DAMAGED CTC AT CH 19.00 KM OF ALLAGI MAIN CANAL AT UDACHAN VILLAGE DUE TO FLOOD UNDER BLIS AFZALPUR.
Construction of rain water canal from Akash Hospital on Prasannahalli main road to Vedapurusha Indane Gas Godown under Devanahalli Municipal limits
Providing Outsourcing manpower for Iggaluru Barrage sub division office, flow canal and jeep driver of IBP for the year 2026-27
Special Repairs to damaged Canal lining and SR at Ch 2.00 to 4.20 Km of Lat-11 of WBC under RLIS.
Removal of Silt and Jungle clearance Selected reaches from Km 0.00 to 5.00 km of Dy.No. 59 of Indi Lift canal
Supplying, Erection and Commissioning of Chemical Based Earth Pit of 110/6.6 KV Sub-station at Almatti Left Bank Canal Headwork.
Removalof silt , jungle clearance for main canal from km 75.00 to 95.00 and 114.0 to 120.00 Km of ILC.(selected reaches)
Providing Outsourcing for Kanva dam, Kanva IB sub division office and canal maintenance of Kanva reservoir for the year 2026-27
Supply of Sowdies for Water management for Kharif crops for the year 2025-26 From ch.0.00 to 17.513 km of Hanagodu main canal, Nallur branch canal from ch 0.00 to 10.957 km, Kenchankere feeder channel from ch 0.00 to 11.00 km and tanks coming under Hanagodu Series.
Removal of Slipped earth in Deep cut reaches between Ch.0.80 km to 1.20 km & 2.25 km to 3.00km of DDUrs Canal.
Removal of silt , jungle clearance for main canal from km 76.00 to 94.00 and 114.0 to 119.00 Km of ILC.(selected reaches)
Improvements to Electrical and Plumbing works for New Chumari Block, Block-1, Block-2 Quarters in Vishweshwarayya irrigation colony Dharwad for the year 2025-26.
Facility Management Services - LumpSum Based - Office of the Chief Engineer KNNL Irrigation North Belagavi Dst; Group D 2 Nos; Consumables to be provided by buyer
SUPPLY OF MANPOWER FOR WATERMANAGEMENT IN CANALS OF SD1 OF D26 OF TBC
Removal of jungle & silt from ch. 0.00 to 8.00 km of Dy-19 and its laterals in vulnerable reaches of D.D.Urs Canal
One time development of the road from main road of Abbalagere village via Abbalagere to join Belalakatte village canal in Shivamogga Taluk.
Removal of silt and Jungle Clerance of Lateral-02, Lateral-03, Lateral-04 and Lateral-05 of Sonthi Branch Canal of SLI
Clearing jungle and removal of silt from Ch 4.00 Km to 7.50Km of Gundal Left Bank Canal (Reserved for Cat -IIA Contractor)
Hiring of machineries for clearing Jungle in selected reaches from Ch.52.00 km to 55.00km under Rampura Canal. (Reserved for SC Contractor)
Maintainance and Improvements in Chikkaiyankatte branch, channahalli Branch, Utturamanahalla Pickup, Bidrahallihundi branch, Uddinala, MRF, Gidaganddi and goobe mule branch under virija Canal
Repairs to Outlet and RCC lining from Km 0.00 to 0.200 (Deep cutting) of Borraz lateral of Gokak Branch Canal under GLBC
Removal of silt in Selected reaches of Devikere feeder canal branch 1, 2,3, 4, Devikere LBC and RBC coming under Hanagodu series
Removal of Jungle from ch 29.00 to 36.00 km of DDUC & DPOs of 29.720, 31.350, 31.800, 32.350, 33.075, 34.100,35.720 of D.D.Urs Canal
Providing basic amenity to Umesh Maste, Babasab Naik tota coming under RHLD canal J-Block reach of Nanadiwadi village of Chikodi Taluka.
AME of Distributory-27,28,29,29A & Escape cum Cross regulator gate at Ch.50.860 KM of Indi lift Canal for the year 2025-26
Removal of silt and Jungle from Km 89.500 to 92.600 of GRBC Main canal under GRBC project for the year 2025-26
Road asphalting from Belagali-Mirji Road to Nagaral Canal Road in Akkimaradi village of Mudhol taluk (Chain km 0.00 to 1.50 km)
Improvements and repairs damaged portion Canal Lining and Service road,Embankment in selective reaches of d24 between ch1.00 to ch10.00km under TBC
Maintenance and installation of crash barrier for the bridge irricagation Canal at Chainage 6.60km on Muguru Bannhallihundi Road in T Narasipura Taluk
Maintenance of One year old Monsoon Plantation from Neelasoge Canal Kodikere Road sideof 3 Km at T.N.PuraSocial Forestry Range during 2025-26