Loading…
Loading…
9,651 results • Best match
Conducting third party inspection and Supervision for quality assurance for the work of RE-CONSTRUCTION OF NEW IRRIGATION IB BUILDING AT RON, DISTRICT GADAG
CONSTRUCTION OF RETAINING WALL TO MAIN CANAL(RAJA KALUVE) NEAR SUNILS HOUSE AT WARD NO 23 DEREBAIL EAST IN MCC AREA
Removal of silt & Jungle from ch 0.00 to 15.00 km & Providing RCC pipe to Hunasekatte pickup under Hanumanthpura canal (selected reaches)
REMOVAL OF SILT FROM CH 4.50 TO 6.50 KM (IN SELECTED REACHES) OF WADAVATTI BRANCH CANAL OF NRBC DY-9(A)
Construction of bridge to Rampura Canal at Ch.49.25 Km and other Improvements works in Nanjangudu Taluk. (Reserved for ST contractor)
Construction of cc road and drain from upparatti road to canal near Lakshmava balobal house at Mamadapura village of Gokak Taluka
AME of Canal from Ch. 25.00 to 53.00 KM and its Distributaries and Laterals of ALBC for the Year 2025-26.
Removal of Silt & Jungle Clearance from 0.00 KM to 13.00 KM of Almatti Left Bank Canal for the Year 2025-26.
Maintainanace of main canal in selected reaches from Ch.55 to 78 km coming under MRBC for the year 2025-26.
Repairs Damaged bund and Removing of Silt From Nala of farmers effected from canal damaged at ch.132.400 km of ILC
Construction of canal and CD to lake outlet of the Kodathal village Savalanga Gram Panchayath of Nyamathi Taluk (Sheduled Caste) Reserved
IMPROVEMENTS TO HANADI ROAD FROM GOVT. SCHOOL TO BIG CANAL AT TONASANHALLI (T) VILLAGE IN CHITTAPUR TALUKA (for S.C. Bidders only)
Removal of silt and Jungle of km 15.00 to 19.00 to Bagojikoppa main canal under SRLIS for the Year 2025-26.
Removal of silt & jungle clearance from chainages km 30.00 to 40.00 of main canal and Dy-18 of NBC (selected reaches)
Service road improvements of IBC main canal from 5.00km to 10.00km and from 0.00km to 8.76km of Dy-2A of IBC
Preparation of DPR For Construction of Minor bridge across the Basavanna Canal 100-bed hospital road in Hospet taluk, Vijayanagar district
improvments of aspalt road from saibaba temple to canal beside the lake in hiremagi village of hungund taluk of bagalkote dist
Removal of jungle from ch 0.00 to 1.00km of D10, and ch 0.00 to 0.70 km of D11 of D.D.Urs Canal.
Electrification of drilled borewell near canal comes under mahalingpur jurisdiction near Satyappa Bhajantri home (2025-26 15th Finance Tied Grant works)
Canal construction work for disposal of excess rain water (Storm Water) from Anupina Katte waste treatment plant of Shimoga Municipal Corporation.
Providing Sowdies for water management of DDU canal coming under No-5 VCC Sub Division jurisdiction for the year 2025-26.
Material procurement for construction of a canal from bommenahalli road to shantappas areca nut palantation in honnemaradahalli vilage in channagiri taluk
Repairs to Malaprabha left bank main canal service road from Km 71 to Km 87 coming under Ramdurg taluk,Belagavi district.
Dredging and desilting work in Pumps Bowl chamber, Forebay and Removal of Silt in intake canal under Herkal South LIS Headwork
Construction of guide wall from feeder canal of Pura Tank waste weir to highway crossing in Gubbi Taluk of Tumakuru District.
Outsourcing of Unskilled category like heavy mazdoor etc. for water management of Canal of Saudagar Project for the year 2025-26
Improvements to Branches DPOs from ch 38.00 km to 45.00km and other works coming under the Hullahally canal in Nanjangudu Taluk.
AME of Canal for the year 2024-25 of NRBC D-17 from KM 13.00 to 26.00 including laterals/sub-laterals.
Providing basic amenity to Kokane, Shinde, Halijole totas coming under RHLD canal J-Block reach of Nanadiwadi village of Chikodi Taluka.
Annual Maintainance of Removal of silt and jungle under Munavalli right bank canal in selected reaches for the year 2024-25.
Removal of Silt and Jungle in selected reaches of branches in main canal coming under Mlbc for the year 2025-26
AME of Machine for SBC Main canal from Ch 30.00km to 40.00km including distributaries and laterals for the year 2026-27
AME of Machinery SBC Main Canal from Ch 52.00 to 63.00 km including distributries and laterals for the year 2026-27
Removal of silt and jungle in selected reaches and repairs to C.D structures in Keetur Canal for the year 2026-27
Providing Protective works and box drain in Pattasomana Hally branch canal at selected reaches under 20 th mile dy of VC
Improvements to atchcut road and Reconstruction of CD works from Doddakere temple to Chowdeswari temple coming under Kattepura Right Bank Canal
Providing basic amenity to Naik, Vatare, Aparaja totas coming under RHLD canal J-Block reach of Nanadiwadi village of Chikodi Taluka.
Removal of Silt and Jungle clearance of MLIS Masuti Head Work for Lead off Canal-2 for the year 2025-26.
Water management from D-1 to D-15 of Kabini Right Bank Canal during Khariff season for the year 2025-26
Raising of Monsoon Plantation from Neelasoge Canal Kodikere Road side of 3 Km at T.N.Pura Social Forestry Range during 2025-26
Protective works to Halaganahalli Sulekere Tank halla and Improvements to Canal service road of Dy-16 (Near Halaganahalli village of PLIC)
Removal of Silt and Jungle in selected reaches of branches and main canal coming under MRBC for the year 2025-26
Removal of silt and jungle in selected reaches and repairs to C.D structures in Kudlur canal for the year 2025-26
Removal of silt and jungle in selected Reaches of Shanku Teertha Pick-up Canal from Ch-0.00 KM to 8.100 KM
AME of Canal from Ch. 0.00 to 25.00 KM and its Distributaries and Laterals of ALBC for the Year 2025-26.
Removal of jungle from ch 0.00 to 3.00km of D9, and ch 0.00 to 1.00 km of D9A of D.D.Urs Canal.
Repairs to Malaprabha left bank main canal service road from Km 52 to Km 66 coming under Ramdurg taluk, Belagavi district.
AME of Main Canal from km 70.00 to 75.00 and km 135.00 to 142.00 of ILC for the Year 2025-26.
Removal of silt and Jungle Clearance of Lat-4 and Lat-6 of Wadavatti Branch Canal of NRBC Dy-9(A).
Construction of Foot bridge at Mydholalu Gram Panchayat, Mallapura Village connecting Sy no 2/6 to Bhadra Canal In Bhadravathi tq.