Loading…
Loading…
9,651 results • Best match
Supply of Sowdies for Water management for Kharif crops for the year 2026-27 to Hyrige Tank, From ch.0.00 to 17.513 km of hanagodu main canal, Nallur branch canal from ch 0.00 to 10.957 km, Kenchankere feeder channel from ch 0.00 to 11.00 km and tanks coming under Hanagodu Series.
AME of Irrigation Water Management of RBC and LBC and its Distributories (MAN POWER)under Anjanapura Reservoir Project in Shikaripura Taluk for the year 2025-26
Construction of RCC drain with slab from Sangama House to H. L. C Canal in ward no 14 TMC Kurugodu Limits Reserved for CAT-2A
Construction of a grey water treatment drain for the canal leading from Kambalageri to Anekere within the limits of Hanagalla Municipality
Removal of silt and jungle clearance from ch.110.00 to 130.00 KM(Selected Reaches) of CLIS East Canal for the year 2026-27.
Improvement of road from Government School to Canal at Kodliwad Village, from Chainage Km 0.00 to Km 2.50 in Yaragatti Taluk Belagavi Dist.
AME of JBC main canal from ch 0.00 to 20.00 km including its distry no 1 to 6 for the year 2025-26
AME of canal network for ILC Dy.No.23 from Ch 0.00km to 6.5km and its laterals of ILC for the year 2025-26
Clearing jungle and removal of silt from Ch 0.00 Km to 8.00 Km in Gundal Left Bank Canal.(Reserved For Cat-IIA Contractor)
CONSTRUCTION OF REATINING WALL AT HOSABETTU NAVAGIRI NAGARA MAIN CANAL (RAJA KALUVE)AT WARD NO 8 IN MCC AREA(SCHEDULED CAST (SC) RESERVED)
Removal of Silt and Jungle clearance from ch 25.00 to 26.00 km. 30.0 to 32.00,38.00 to 40,00 km of Almatti Left Bank Canal
Removal of silt in 1 to 5 branches, odeyapura L/S & R/S and Kabbinakule Pick up of RSM Canal. (at selected reaches)
Removal of silt and jungle in tank atchkat canal of kondajji tank ,sampige tank, veerasagara tank,sampige hosahalli,gonitumkur tank and ammasandra tank
Construction of road connecting from atchkat land of Lateral-8 to kadavekattehundi village of D-26 of D.D.Urs canal (Reserved for CAT-IIA)
Removal of Silt and Jungle Clearance of Lat-1, 2 & 3 of Dy-6 of MLI East canal for the year 2025-26.
Special Repairs to damaged Canal lining at Ch 20.50 to 22.00 Km of WBC and SR in selected reaches of WBC under RLIS.
Special Repairs to damaged Canal lining at Ch 13.00 to 15.00 Km of WBC and SR in selected reaches of WBC under RLIS.
Restoration of Canal Lining at Ch. 10.00 to Ch. 50.00 at Selected Reaches of RBC of BNT Project for the year 2025-26
AME of Main canal from 95.00 to 113.00 and Escape at km 96.4 and 110 km of ILC for the year 2025-26
Removal of Jungle and silt of Dy-7 and its Laterals of Mulwad West Canal at selected reaches for the year 2025-26.
Construction of C.D. in Survey No. 10/1 in Inachagal Village under Command area of CLIS East Canal in Muddebihal Taluk, District. Vijayapura
Removal of silt and weeds in ch 40.500 Km to 57.00 Km of RSM canal from Goragundi to Degganahalli Village(at selected reaches)
Conducting survey & preparation of detailed Project Estimate for the Improvements to Karagada village Devikere and its feeder canal in Belur Taluk Hassan District
REMOVING OF SILT AND JUNGLE CLEARANCE FROM ALLAGI(B) LIFT MAIN CANAL FROM CH.0.00 TO 35.65 KM AT SELECTED REACHES UNDER BLIS.
Construction of RCC Box for G.Hosahalli Feeder Canal in 11th km of D-23 under T.B.C and Improvements of Embankment at G.Hosahalli tank
Construction of retaining wall at 8th km,Providing embankment in 2nd ,11th Km and other Improvements works of D18 of Nagamangala Branch canal
Clearing jungle and removal of silt in Vulnerable reaches from Ch 7.00 Km to 13.00Km of Gundal Right Bank Canal using hydraulic excavator.
Removal of silt and jungle clearance in selected reaches of Daddi Naganur LIS 2nd stage Main Canal for the Year of 2025-26
Improvements of Modebaie uddi and Rajashekar uddi at Ch 39.00Km and Construction of Cart bridge at Ch 44.00Km of Kattepura Right Bank Canal
CONSTRUCTION OF PROTECTION WALLS A U/S & D/S SIDE OF AQUEDUCT AT CH 47.632 KM OF BALUNDAGI MAIN CANAL UNDER BLIS AFZALPUR.
Construction of retaining wall at Ch 38.00Km of IP side and Installation of damaged escape gate at ch 40.00km of ILC main canal
Raising of Monsoon Roadside plantation at Kadalipura to Yaraganahalli to Thoreshetthalli canal side 3 Kms in S F Range Maddur during 2026-27
Special Repairs to damaged Canal lining at Ch 20.00 to 22.00 Km of WBC and SR in selected reaches of WBC under RLIS.
Construction of foot bridge across canal to connect Gonibeedu main road to Malligenahalli road within Singanamane (Tavaragatta) grama panchayat limit in Bhadravathi taluk
Special Repairs to damaged Canal lining at Ch 0.00 to 10.00 Km of WBC and SR in selected reaches of WBC under RLIS.
Hiring of machinaries for clearing jungle and silt in Rampura canal from ch.0.00 km to 12.00 km for the year 2026-27.
Construction of CC Box Lining for offtake PO Ch.48.50 Km and 49.40 Km and other improvement works under Rampura Canal near Yadakola.
Providing day/night Man Days for water management of Malaprabha left bank canal from Km 13.120 to 51.440 for the year 2025-26.
Filling Murrum Rain cut Reaches Along GRBC Main Canal From KM 113.760 to 119.000 under 2701 H/A for the Year 2025-26
Removal of silt and jungle in selected reaches of Old madapura canal and Repairs to D-49 and D-52 coming under HLBC
Improvements to Atchkat Road Connecting From Guluru Village to Koppa-D.Hosahalli Main Road via Guluru Tank Waste Weir under KBR (Keragodu Branch Canal)
Providing Basic Amenity to Kotiwale, Sulkude and Kamate areas of RHLD K-Block canal reach of Ankali village in chikodi taluka (part-1)
Special Repairs to damaged Canal lining at Ch 18.50 to 20.00 Km of WBC and SR in selected reaches of WBC under RLIS.
Removal of silt at vulnerable reaches of 23rd pickup canal ,23rd dy, 20th dy & Keelara pickup channel and Alkere pickup channel under NMBC.
Maintenance of One year old Plantation from Chikkahally Yandahally Varuna canal side of 3 Km at Mysore Social Forestry Range during 2026-27
Removal of silt in selected reaches of Ramaswamy main canal and uddinalas coming from chainage 0.00 to 40.00km for the year 2026-27
Formation of Rod from Devalapur to Ganjyal Farms and Hiremagi Farms and Bevinamatti canal to Ashok Lagaloti farm in Bagalkot Taluk Bagalkot Dist.
Removal of Slipped earth and jungle clearance of Vajrankatte to Chikkakattigenahalli tank feeder canal and Koppa tank coming under D-23 of TBC
Removal of silt in selected reaches of Ramaswamy main canal and uddinalas coming from chainage 41.00 to 80.00km for the year 2026-27
Providing basic amenity to Desai, Mane, patel and Danger areas of CBC Canal KM No.55 reach of Hirekodi village of Chikodi Taluka