Loading…
Loading…
9,651 results • Best match
Removal of Silt and Jungle clearence of Block No.19 at ch. 0.000 to 4.000 km of MRB Canal for the year 2025-26
Construction of cistern tank at ward no 8,13, near durga devi temple and prakash mang house, 4th canal in the limit of TMC Terdal
Providing Basic Amenity to Gavade, Joshi and Patil colonies coming under CBC canal block 25A reach in Khadaklat village of Chikodi taluka Belagavi district.
Maintenance of Second year old Plantation from Halepenjahalli to Mahadeshwara Colony Canal side of 3 km at Hunsur Social Forestry Range during 2026-27
Removal of silt, jungle clearance and repairs to the damaged portion of CC lining of Dy No.03 of Atiwal North Canal of KP.
Removing and Hauling all kinds of soil including Boulders at selected reaches ( In Deep cut) from Km 12.000 to 24.00Km of UTP main Canal
Supplying of Gangman/Patakaries for water management in Chinchali main canal, Chinchali Extension Dy & Paramanandawadi Dy under Kharif season for the year 2025-26
Removal of Silt and Jungle clearance in the main canal from Ch 10.00 Km to 20.00 Km of MBC for the year 2025-26
Hiring of machinery and labours for removal of silt in deepcut reaches from Ch 11.720 km to 11.840 km of Kabini left bank canal.
Removal of jungle ch. 0.00 to 8.00 km of Dy-18, its laterals of D-18 and silt in vulnerable reaches of D.D.Urs Canal
Removal of Silt from 18.00 Km to 27.00Km of Tunga Left Bank Canal in Selected reaches of Shivamogga City For the year 2024-25
Maintenance of Third year old Plantation from Kuppahally Forest Gate Kenchanahalli Canal side of 3 km at K.R.Nagara Social Forestry Range during 2026-27
Removal of Silt and Jungle clearance from Ch.0.00 to 13.00 km in selected reaches of Salawadagi Branch Canal for the year 2025-26.
Removal of silt and Jungle in selected reaches of PLIC main canal from 2.00 km to 24.00 km and for the year 2025-26
Hiring of machineries for clearing jungle from D-36 to D-39 and from D-41 to D-44 of Taraka left bank canal.
Hiring of machinery and labours for removal of silt in deepcut reaches from Ch 22.050 km to 22.740 km of Kabini left bank canal.
Improvements to Tank and Sluice canal of Tavarekere in Bettadapura Village ,Chikkanerale Kere in Chikkanerale Village and Doddakere in Haranahalli Village coming under PLIC.
Removal of jungle & silt from 1st km to 5th km and Repairs to damaged canal in 1st km of D-27(A) under TBC
Removal of Jungle Clearance from Ch. 00.00 KM to Ch. 50.00 KM (Selected Reaches) of East Canal under CLIS for the Year 2026-27.
Removal of silt and jungle in Selected reaches from ch 0.000 to 5.00 km of Santhekere tank high level canal coming under Hanagodu Series
AME of Canal from Ch 40.27 to 50.62 km & Dy-19 to D-24 and their laterals of MBC for the year 2026-27
Removal of Silt & Jungle Clearance of Distributaries No. 1 to 21 including its laterals of West Canal under CLIS for the Year 2026-27.
Removal of Silt and Jungle Clearance of main canal from Ch 77.00 Km to 78.06 Km of MLI West Canal.for the year 2026 - 27
Construction of Bridge across Madanahalli Branch under Nugu right bank canal at ch 0.62 km connecting Kappasoge village to Madanahalli village of Nanjangud Taluk
CONSULTANCY SERVICE FOR PREPARATION OF DETAILED PROJECT REPORT FOR KAVALAGA(K) LIFT TO PROVIDE IRRIGATION FACILITIES FOR 33 VILLAGES COMING UNDER AFZALPUR CONSTITUENCY OF KALABURAGI DISTRICT UNDER BLIS.
Scheme to lift water from Cauvery river near Bannur town to Augment the atchkat of Harohalli high level and low level Canal in T.Narasipura Taluk
HIRING OF MACHINERIES FOR CLEARING JUNGLE ON SR SIDE AND REMOVAL OF SILT IN MAIN CANAL AND DISTRIBUTORIES FROM CH.67.00KM TO 77.00KM UNDER NHLC
Hiring of machineries for clearing jungle from ch. 3.00 to 5.00km, 18.50 to 20.00 km and 23.50 to 26.00 km of Hebballa left bank canal.
Providing Basic Amenity to Patil, Mirje, Jadhav, Ambi and Hiremath areas of RHLD J Block canal reach of Kallol village in chikodi taluka (part-1)
Removal of silt and jungle in selected reaches from Ch. 0.00 km to 14.500 km of Haluvagilu pick up canal for the year 2025-26
Canal construction work to drain excess water from Navale lake to the channel in Maruthi badavane at ward no 03(Reserved for CAT II(A))
Removal of Silt and Jungle clearance from Ch.0.00 to 72 km in selected reaches of Basavana Bagewadi Branch Canal for the year 2025-26.
Removal of Silt and Jungle Clearance of Lat-1, 2 & 3 of Extension of Dy-6 of MLI East canal for the year 2025-26.
Removal of Silt and Jungle clearance from Ch.20.00 to 40.00 km in selected reaches of Basavana Bagewadi Branch Canal for the year 2025-26.
Removal of Silt and Jungle clearance from Ch.40.00 to 60.00 km in selected reaches of Basavana Bagewadi Branch Canal for the year 2025-26.
Maintenance of Canal side Plantation for the year 2024-25 raised during 2020 rains at NLBC 12km to 34km equal to 22km plantation (8000 plants)
Special repair work for Damaged portion of Hume Pipe culvert of Dy-1 and Dy-2 of MLI East Canal for the Year 2025-26.
Removal of Silt and Jungle Clearance of Dy-6 and Lat - 1,2,3 Extension of Dy-6 of MLI East canal for the year 2025-26.
Removal of silt in Selected reaches of Mulkere pickup canal from ch 0.000 to 6.00km, Karigalla Pickup from ch 0.000 to 4.00km under Hanagodu series
Removal of silt and jungle in selected reaches of Changravally anicut canal from Ch.9.00 Km to17.30 Km, Dy No.1 to 8A under HLBC.
Restoration to canal embankment of BTSD of d-5 of NLBC & Repairs to damaged CTC of D-5B of NLBC (Package work) (Reserved for SC)
Removal of Jungle and Silt of Lateral 1,3,5,6 & 7 its sub laterals of Arakera Branch Canal of D-9 (A) of NRBC. ( In selected reaches )
Repairs to structure, lining and Improvements to the Service road at Ch.105.400 km and 108.960 km of Bijapur Main canal under MLI stage-III
Epoxy painting to upstream face of radial crest gates, river sluice gates and sluice gates of Kabini left and right bank canal of Kabini dam.
Removal of silt and jungle clearance of Dy-1A,Dy-1B of IBC and jungle cutting of IBC main canal from ch 0.00km to 5.00km.
Advance work (Including Raising of 14x20 Seedlings) at Chikkakothagere Canal to Shivapura Main road -3Km of Mandya Range under the scheme RSP during 2025-26
AME of JBC Main Canal From Ch.54.00 to 70.00 Km(Dy-11A,Dy-12(12.00 to 24.00km)Dy-16 & Dy-17 and Its Connectivity).
Removal of Silt and Jungle clearance from Ch.60.00 to 72.00 km in selected reaches of Basavana Bagewadi Branch Canal for the year 2025-26.
Service road improvements of ILC main canal from ch 8.50km to 15.00km and Dy-5 of ILC from ch 0.00km to 10.24km in selected reaches.
Providing Neeragantis/Sowdies for canal water management for Kabini, Nugu & Hullahally anicut project under No-3 KC sub division, Hullahally for the year 2025-26