Loading…
Loading…
9,651 results • Best match
CONSTRUCTION OF CUT AND COVER TYPE RCC TROUGH FROM CH 2200 TO 2450 IN L-2A SUB DYST UNDER D-26 OF TUMKUR BRANCH CANAL
Removal of Silt and Jungle of Teggi-Siddapur Main Canal from Ch 0.00-12.18km and its Distributaries at selected reaches for the year 2025-26.
Improvements to escape Sluice at Ch 4.00 Km and Construction of new escape sluice at Ch 9.10 Km and Ch 12.00 Km of Rampura Canal.
Hiring of machinaries for removal of weeds, jungle and silt in slusy condition from Ch.10.00 to 19.00 km of Hullahally canal for summer 2026
Improvements to Atchkat road from Chinkuruli Hobli Haravu Shyadanahalli Road Via LBLL Canal to Shyadanahalli Village Moganna gowda land in Pandavapura Taluk in Mandya District
Restoration of damaged portion of CC Lining, Structures and improvements to SR from Ch KM 65.00 to 70.00 of East Main Canal of Chimmalagi LIS
Asphalting of the road from Itanal Village to Teradal tota Canal in Itanal Village of Kudachi Constituency of Raibag Taluka (Chainage 0.00 to 1.50 Km)
CONSTRUCTION OF BRIDGE AT KM 6.10 RANGAPUR TO MAIN CANAL IN SINDHANUR TALUK, RAICHUR DISTRICT. UNDER KKRDB INTREST FUND FOR THE YEAR 2025-26(GENERAL).
Providing and fixing of cistern tank and layng of GI pipe line at for existing hanndpump near canal and ramnagar, ward no.01, Ballari City
Supplying sowdies for water management during Khariff-2025 for Tellanuru Branch Canal & its Distributaries and LBC and RBC of URP for the year 2025-26
Clearing jungle, Removal of Silt and SR improvement in selected Reaches form Ch161.00 to 169.20 km Under UTP Main canal for the year 2025-26
Construction of a drainage system from the main canal of the new SC colony in Hunashyal PG village of Mudalagi taluk to the main road.
Repairs to Gates in combined Structure at Ch 15.300 and Removal of silt in selected reaches of Chikkud Branch Canal for the year 2025-26
Removal of silt and jungle in selected reaches from Ch 23.10 km to 27.00 km of Main canal of HLBC for the year 2026-27
Maintenance of Second year old Plantation from Kirangur Gate to Hale Penjahalli Canal side of 3 km at Hunsur Social Forestry Range during 2026-27
Maintenance of 4th year Plantation at Sindagi town roadside & Other area & Mannr to Jalawad road /Canal side under Social Forestry B. head during 2025-26
Removal of silt and jungle of selected reaches from ch. 0.00km to 15.00km of flow canal and RBC & LBC of LIS D Point of IBP
Maintenance of Third year old Monsoon Plantation from Saragur to Agatthur Canal side plantation of 3 km at H.D.Kote Social Forestry Range during 2026-27
Improvements to road connecting doddankanahalli village to kemanpura village via virija canal 46th km to 43rd km atchkat road and tank road in srirangapattana taluk
Improvements to Sub lateral and service road connecting to Kuppegala main road coming under atchkat of Lateral-8 of D-24(26) of DDUrs Canal
Hiring of machinaries for clearing jungle and removal of silt from ch.0.00 km to 15.00 km of Hullahally canal for the year 2026-27.
Maintenance of Third year old Plantation from Kaggere Village to Moodalakoppalu Village Canal side of 3 km at K.R.Nagara Social Forestry Range during 2026-27
Removal of Silt and Jungle of Dy-16, 20-21 L-3 and Dy-22 at CH. 0.000 to 2.500 of Malaprabha left Bank canal
Repairs to Aqueducts at Ch 7.850 & Ch 11.900 of High level canal of Yaragatti LIS & Annual maintainance of Hirur Barrage for the year 2024-25.
Providing day/night Man Days for water management of Distributarys No. 36 & 37 including sub distributories gates of MLBC Canal for the year 2025-26.
THE SUPPLY OF MATERIALS FOR THE CONSTRUCTION OF CANAL FROM KEREKODI OF GULLADAMANE GRAMA TO HALLA, GULLADAMANE GP, TARIKERE TALUK, CHIKKAMAGALURU DIST UNDER MGNREGS SCHEME
Fixing of Gates 1 to 13 Laterals & formation of Service Road of lateral 12 of Arakera Branch Canal OF D-9A NRBC in selected reaches
Removal of Silt and Jungle clearance from Lat 11 to 20 of Dy 13A Selected Reaches of CLIS East Canal for the year 2026-27
Plugging of leakages near Reliveing weir at Ch. 5th mile and Canal bund from Ch. 9th mile to 12th mile of Hirenala under Mirle Series
Removal of Silt and jungle in Main Canal from Km Ch 10.00 to 20.00, ch 30.00 to 40.00km, under DC-1 of TLIS (Selected reaches)
Repairs to Side bed and side lining at Selected reaches of KM 66, 70, and 71 of MLI west canal for the year 2026 - 27
Restoration of Distributaries Gates of Laterals-1, 2 & 3 of Dy-1, Dy-9 and Additional Dy-10.71 and 12.60 of Almatti Left Bank Canal.
Creation of electrical network by creating infrastructure by extending 11kV HT lines, erection of 25KVA, enhancement of 25KVA by 63KVA 1-Star Rated Distribution Transformers and extension of 3 phase 4 wire LT line for energisation of 97 nos. of ... of Irrigation Pump ...
Removal of Silt & Usage of Machinery Hydraulic Excavator for silt & jungle removal.
HDPE Elbow 75 mm, HDPE TEE 75 mm, HDPE end cap 75 mm, Quick coupling valve, Sprinkler tripod stand with bracket, Brass gate valve 2 and half inch, HDPE connector 75 mm, HDPE pond liner, Rain gun head, Mounting stand, Riser pipe, Saddle base, Ball valve 40 mm, Open Well Submersible pump 15 HP, Diesel Engine Pump 10 HP, Starter Assembly 15 HP
Removal of silt and jungle clearance from Ch 20.000 to 30.000 Km including Dy No 14,15 and 16 of East Main Canal of Ramthal (Marol) LIS
Providing chainlink fencing and fixing Gate to cremation ground near canal and Upgrdation of CC Road near Santosh Ghatgi House at Ward No6 in Nidagundi Town
Maintenance of Canal in selected reaches of 24 Block, Mantur distributaray, 42,43A,43B, Shishuvinhalli,44 & 45 block distributaries coming under MRBC for the year 2025-26.
Removal of jungle from km 0.00 Km to 90.00 km of Bijapur main canal under MLI Stage-III for tank filling for the year 2025-26.
AME of canal network for ILC Dy.No.22 from Ch 0.00km to 5.00km and lateral no.1,2,3 and 4 of ILC for the year 2025-26
Removal of silt in Selected reaches of Mulkere pickup canal from ch 0.000 to 4.500km, Karigalla Pickup from ch 0.000 to 2.000 km under Hanagodu series.
Removal of jungle and other debris/wastes obstructing the main canal at Ch 150.00 to 160.00 Km under KRBC using hydraulic excavator. (Reserved for ST Contractor)
Package Estimate For the work of Removal of silt and Jungle Clerance From 0.00km to 06.00km and 6.00km to 11.00km of Sonthi Branch Canal of SLIS
AME of canal network for ILC Dy.No.18 from Ch 7.00km to 14.50km and lateral no.5,6 and 7 of ILC for the year 2025-26.
AME of Canal for the year 2025-26 of BD-2, BD-3, BD-4 & BD-5 and its laterals of BDs under NRBC Distry.16
AME of canal network for ILC Dy.No.24 from Ch 0.00km to 5.00km and its laterals 1 and 2 of ILC for the year 2025-26
Removal of Silt & Jungle clearance from km 0.00 to km 56.00 of Tidagundi Branch Canal under MLIS -III for Tank Filling for the year 2026-27.
Providing Light Motor Vehicle (With AC) on rental basis to the office of AEE , KNNL , Amarja Project Canal Sub Divn Nimbarga for the year 2026-27
Conducting survey & preparation of detailed project estimate for the Improvements to Basavanahalli Dantaramakki tank kodihalla and its Chikkakurubarahalli Pickup and canal in Kasaba Hobli, Chikkamagaluru Taluk
Construction of Concrete road from Kerehalli village to Singarahalli village connecting Yettinahole Gravity canal Ch 9 600 bridge in Alur and Belur Taluk of Hassan District