Loading…
Loading…
9,651 results • Best match
Construction of Road bridge across the Tungabhadra LLC canal at CH.0 km of Chittawadagi - Hosur road in Hospete taluk, Vijayanagar District. (HOA Appendix e(MDR Bridges)
Protection works to Damage portion of UTP Main canal KM 36.00 to 89.00 KM (Some Selected Reaches) of Honnali Taluk Davanagere District (UTP WORK SL NO-7)
Construction of Cut and Cover from Ch 1.480 km to 2.225 km of minor-5 of Dy-4 Offtaiking at Ch 201.055 KM of UTP Main canal
Removal of Silt and Jungle from km 85 to 89.50km and 93 to 100.00 km (in Selected Reaches) of GRBC Main canal for the year 2025-26
Construction of Bridge at HLC Canal Distributor D-14 (Havambhavi) on NH-150A Siruguppa Road in Ballari Town, Under 8443 Deposit Grants for the year 2026-27.
Shifting of Existing 11 KV BESCOM Power Line coming across Chitradurga Branch Canal from km 61.230 to 73.00 km at Hosadurga and Holalkere Taluk in Chitradurga District
Hiring of machinery and labours for removal of silt from Ch 11.500 km to 11.600 km & Ch 12.000 km to 16.880 km of Kabini left bank canal.
Providing & fixing Metal crash barrier to selected critical reaches and improvements to service road in virija Canal from CH 33.00km to 69.00km in Srirangapattana Taluk, Mandya District
Hiring of machinery and labours for removal of silt from Ch 22.750 km to 23.000 km Ch 23.300 km to 25.250 km of Kabini left bank canal.
Hiring of machinery and labours for removal of silt from Ch 11.500 km to 11.600 km & Ch 12.000 km to 16.880 km of Kabini left bank canal.
Removal Of Jungle on GLBC Main Canal in selected reaches From Km No.50 to 70 and strengthening of Embankment in Km no. 70 and Other works
Outsourcing of labour for canal water management(sowdies) of HRBHLC data operation gauaging and other miscellaneous works coming under NO5 HRBHLC subdivision Hallymysore for year 2025-26
AME of canal from Ch 40.27 to 50.62 km & Dy-19 to Dy-24 and there branch distributaries and Laterals of MBC for the year 2025-26.
Supplying of Gangman/Patakaries for water management in Chinchali Main Canal, Kudachi Dy, Suttatti Dy-I & Suttatti Dy-II under Rabi season for the year 2025-26
Maintenance of One year old of Monsoon Plantation fromMysore Manandavadi Main Road to Motthahadi Canal side of 3.00 Km at H.D.Kote Social Forestry Range during 2026-27
Maintenance of 4th year plantation at Taripura Canal to Habbadi roadside (Mahadevapura Main Road)-3km of S R Patna Range under the Scheme RSP during 2026-27
Removal of silt in selected main canal chainages from ch 41.00 Km to 56.00 Km and 69.00km to 71.00 Km Under NBC for the year 2025-26
Construction of guide wall to waste weir draft channel of Nittur tank and construction of RCC slab over feeder canal passing through nittur village of gubbi taluk
Construction of CTC in Surveye No 73/2 near Herur Tank and improvements to feeder canal of heruru DWS tank coming under D-15 Of Gubbi Taluk
Repairs to Rain damaged portion from Ch 3800.00 m to 3900.00 m and Ch 6850.00 mt to 6900.00 m of Main Canal under DC-2 of TLIS.
Improvements to Pickups Canal Coming under the atchkat of Thonnur tank of HLBC and construction of Bridge to halla crossing Hosahalli Kuppahalli Road under D66B of HLBC.
Improvements to tanks, Canals and Escapes comes under Kamanhalli (LBC), Gejjahalli, Dolleswara, Suraleswara (Including Cross regulator at Suraleswara) and Akkivalli village comes under Ch 8.00 km to 16.00 km of RBC (proposed chainage as LBC 0.00 km to 4.50 km and RBC 7.00 km to 19.70 km) under Dharma project in Hanagal taluk of Haveri District.
Supply of man power required for Water Management of Malebennur Branch Canal from CH 32-00 to 48.00 KM , and Distributories of DHLS, 9thC, 10th, 10th A, 11th A,B,C,D,E,F, 12th, 12thA and 13th, 14th, 15th, 16th, 17th Z/D and Maintenance of WRD Colony at Malebennuru, Driver for Vehicle KA-17 G-426 & KA-17 G-427 under Bhadra and Supply of man power required for Water Management of Devarabelakere Pickup R.B.C. from ch.0.00 to 26.00km and L.B.C. from ch.0.00 to 33.00 km under D.B.Kere pickup Annual Maintenance for the year 2025-26
Providing & fixing Metal crash barrier to selected critical reaches and improvements to service road in virija Canal from CH 0.00km to 32.00km in Srirangapattana Taluk, Mandya District
Construction of Retaining wall for the Raja Canal behind Velankani Residential Complex old road of 48 Kankannady Valencia ward in MCC limits (Scheduled Tribe(ST)Reserved)
Package-I Removal of silt and Jungle in selected reaches of Ramateerth Dy (0.00 to 4.00 Km) & Jamkhandi Branch Canal From Km No 0 to 15 & other works.
Clearing jungle and removal of silt in Vulnerable reaches from Ch 0.20 Km to 7.00 Km of Gundal Right Bank Canal using hydraulic excavator(Reserved For SC Contractor)
CONSTRUCTION OF SURFACE DRAINAGE WORKS IN SY.NO 215 TO NALA OF YADRAMI VILLAGE UNDER COMMAND AREA OF JBC DY.NO.10& 11 OF JBC MAIN CANAL. (SC Bidders only)
Improvements to Handigund -Sultanapur main Road to Joining Handigund -Kappalguddi main road Through canal in Raibag Taluk of Belagavi District Under CM FUND for the year 2025-26
AME of canal network for ILC Dy.No.19 from Ch 8.00km to 16.00km and lateral no.3 and sub minor-1 of ILC for the year 2025-26
Removal of silt and Jungle clearance of ILC main canal from Ch 41.00 to 50.00 Km and M-3 to M-7 of Dy No 18 of ILC.
Bhadravathi Taluq,Construction of Foot bridge at Dasara kallhalli Gram Panchayat, agasanhalli village canal connecting Sy no 52,53 and 54 in Bhadravathi Taluq.(Reserved For CAT-II(A))
Providing Man Power for Water Managment of Bijapur Main Canal (From 90.00 to 160.00 Km) and Its Distributaries Network for tank filling purpose for the year 2025-26.
Removal of Silt & Jungle from Km 0.00 to 3.00, 3.00 to 6.00, 6.00 to 9.00 and 9.00 to 10.35 Channur pickup feeder canal (Package work) (Reserved for SC)
Removal of Silt and jungle clearance from 50.00 to 57.00 km including Dy-27.28.29.29A including its laterals of indi lift canal for the year 2026-27 (Selected Reaches)
Removal of Jungle and Silt Clearence from Ch. 10.50 to 13.80 km including aquaduct reach of Arakera Branch Canal of D-9 (A) of NRBC ( In selected reaches )
Removal of Silt & Jungle clearance in from km 0.00 to km 63.88 of Huvina Hipparagi Branch Canal under MLIS - III for tank filling for the year 2026-27.
Supply of materials for Construction of a CD for the canal that brings water to the lake, where the road leads to Rottigawada and Umachagi in Yaraguppi village
Construction of Surface and Sub-surface Drainage works surrounding Kamaladinni & Anapakatti villages under command area of Dy No-2 of Marol LIS East Canal. TQ- Hunagund Dist-Bagalkot
Raising of Monsoon Roadside plantation at Mahadevapura to Tharipura Main Road to Hababdi Road canal cross channel Roadside 3 Kms in S F Range Srirangapatna during 2026-27
Maintainance and Improvements in Sahukar nale, Doreswamy branch, Kumbargundi pickup, Kunthikal pickup, Lakshmihalla pickup & Mahadevapura Pickup, Hunasemara pickup, Yerkuntehundi pickup, chennahalli pickup and Aramanehalla pickup under vinija Canal
Removal of silt and Jungle clearance at selected reaches from Ch 69.000 Km to 88.000 Km and rising of Embankment at Ch 84.500 Km of Chikodi branch canal
Restoration to CC Lining at Ch 3.200 to 3.600 km , 4.800 to 5.200 km , 6.200 to 6.500 Km , 28.200 to 28.500 of West main canal Ramthal (marol) LIS
Construction of CTC at downstream of weir of Naregal Doddakere and Naregal feeder canal at Ch 2.200, 3.400 and 4.800 of tank of Naregal Doddakere under Dharma project.
Improvements to road Connecting Halagayanahundi (State Highway-33) Village to Sugganahalli Via Varuna Canal in Mysuru Taluk at Ch 0.70 to 1.95km and Ch 3.40 to 3.50 Km
Annual Maintainance of Removal of silt and jungle under MLBC main canal from km 0.00 to 13.20 and its Distributeries in selected reaches for the year 2024-25.
Improvements to atchkat road from Manchanabele Right Bank Canal to Savanadurga forest border via Sy.No.256 and Sy.No.235 of Hagalahally village in Ramanagara Taluk and Ramanagara District
Supplying & Installing wire Rope to Rope Drum Hoist of Canal Sluice Gate in Varahi Diversion Weir at Horriabbe, Siddapura Under Varahi Irrigaiton Project for the year 2025-26
Removal of silt and jungle clearance from Ch 0.00km to 13.50km of Dy-2B of IBC and Jungle cutting of IBC Main canal from Ch 10.00km to 15.00km
Hiring of machineries for removal of silt in Haladakeri branch, Mulluru Branch, Sarguru Branch, Sutturu branch, Kalmalli branch, Danayakanpura branch of Hullahalli canal for Kharif crop 2025-26.