Loading…
Loading…
9,651 results • Best match
Improvements to Hemavathy Left Bank Canal Service Road from Ch.3.00 km to 5.00 km to connecting Uduvare village to Devihalli village under atchkat of HLBC in Kattaya Hobli, Hassan Taluk and Hassan District and Construction of protection wall on IP ... Bank Canal at ...
Improvements to the bridge constructed for the Tumkur branch canal near Arekere and Comprehensive repairs and reconstruction work of Sluice and canal system of Beguru lake and Construction of escape gate to release water from Tumkur branch channel to Begur lake and Improvements to internal roads in T.Hosahalli, Girigowdanapalya, Salantripalya villages and Improvements to Internal roads of Arakere Village of Kasaba Hobli in Kunigal Taluk.
Reconstruction of Cart Bridge at Ch.1.80km of Bidagandi halla off take at 14th km of RSM and 1.2 km of Kestur halla off take at 6th km of RSM & Improvements and Protective works to Hanumana kaluve of RSM, 4th branch and Kabbina kule pickup canal of ... RSM canal and ...
Construction of Road & box drain from Guddadanerlekere main road to CM Kadar lands, box canal in Sy.no. 158/p1,p2 of Kiran kumar lands of Devaranarsipura village, Improvements to connecting road from Masarahalli village to Yerehalli village , box ... box canal in ...
Appointment of third party Consultant for Design, manufacturing, supply, installation, operation and maintenance of SCADA and GIS based Automation for Narayanpur Right Bank Main Canal From Km 0.00 to 95.00 and Canal Network under Dy No.1 to 14 coming under the reach between Km 0.00 to 82.00 including maintenance of the system for 5 years after commissioning of the scheme on turn key basis
Removal of jungle and silt from ch 0.00km to 3.00 km Manjlapur minor Distry under D-5 of HBC, Removal of jungle and silt from ch 3.00km to 5.94km Manjlapur minor Distry under D-5 of HBC and Removal of jungle and silt from Manjalapur Distributary of D-5 of HBC (Reserved for CAT-IIA)
Removal of jungle from ch 0.00 to 1.60km of D1, ch 0.00 to 2.00km of D3A and ch 0.00 to 0.50km of D4 of D.D.Urs Canal.(Reserved for Category IIA)
Annual maintenance Silt and jungle removal under MLBC main canal from km 0.00 to 13.100 (in selected reaches) and its distributaries for 2025-26.(Reserved for CAT-II(A) bidder)
Hiring of machineries for Removal of Jungle and silt from Ch 0.0km to 1.20km,1.80km to 5.10km in D-5 of Kabini Right Bank Canal for the year 2026-27.
HIRING OF MACHINERIES FOR CLEARING JUNGLE ON SR SIDE AND REMOVAL OF SILT IN MAIN CANAL AND DISTRIBUTORIES FROM CH.57.00KM TO 67.00KM UNDER NHLC (Reserved for Cat-IIA Contractor)
Reconstruction of CTC at ch 4.90km of Dy-10 (Ch 1.90km of Dy-14) of MBC and Repairs to cc Lining and bed at ch 4.400km of mbc main canal
Providing and Erecting Metal Beam Crash Barrier from CH 16.00 km to 32.00 km (Balance Reaches) in SR/IP side of VC Main Canal coming under Pandavapura Taluk, Mandya Dist.
Providing and Erecting Metal Beam Crash Barrier from CH 0.00 km to 16.00 km (Balance Reaches) in SR/IP side of VC Main Canal coming under Pandavapura Taluk, Mandya Dist.
Providing Man Power for Water Management of West Canal from Ch 0.00Km to 30.00 Km and Distributory 1 to 11A Under Mulwad LIS Stage-II for the year 2025-26
Hiring of machinery and labours for removal of silt from Ch 0.00 km to 0.900 km & Ch 2.700 km to 3.900 km of D-3 of Kabini left bank canal.
Providing and Erecting Metal Beam Crash Barrier from CH 0.00 km to 42.00 km (Balance Reaches) in SR/IP side of CDS Main Canal coming under Pandavapura Taluk, Mandya District.
Hiring of machinery and labours for removal of silt from Ch 0.00 km to 0.900 km & Ch 2.700 km to 3.900 km of D-3 of Kabini left bank canal.
Providing and laying of main distribution pipeline from newly constructed OHT in Sadashivanagar to Samrudhi layout, Veera Bramaiah Colony canal and others in Talur road within Ballari City Corporation limits.
Providing Light Motor Vehicle (With AC) on rental basis to the office of AEE, KNNL, Gandori Nala Project, Canal, Sub Division No.3, Mahagaon Cross for the year 2026-27
Supply of Man Power for water Management of Main Canal from 41 to 62th km of TBC and D-8 and D-9A of TBC For the Year 2026-27
Removal of silt and jungle in selected reaches of Koppa branch canal from 0.00 km to 05.00 km and its Sub Dy 01 to 05 for the year 2025-26
Providing Man Power for Water Management of East Canal from Ch 0.00Km to 17.20 Km and Distributory 1 to 6 Under Mulwad LIS Stage-II for the year 2025-26
Construction of Seepage Drain in Sy.No 237/13 to Sy.No 242under suganahally village Panchayath in Manchanabele Right Bank Canal to Ramanagara- Hagalahalli Main road in Ramanagara Taluk in Ramanagara district.
Conducting survey & preparation of detailed project estimate for the construction of Belavadi doddakere Kodi cum road bridge and Improvements to Belavadi doddakere to machenahalli tank pickup canal in Chikkamagalur Taluk
Supplying of Gangman/Patakaries for water management in Raybag High Level Dy(RHLD) and Connected Canal Network Coming under Raibag Sub division for Kharif season for the year 2025-26
Conducting Third Part Inspection & Project Management Consultancy services for quality assurance for providing drinking water supply to Matadahalla & other tanks through Lift scheme from 101.725 km of Tumkur Branch Canal
Removal of silt and jungle in selected reaches of Koppa branch canal from 5.00 km to 10.00 km and its Sub Dy 06 to 10 for the year 2025-26
Supplying of Gangman/Patakaries for water management in Raybag High Level Dy(RHLD) and Connected Canal Network Coming under Raibag Sub division for Rabi season for the year 2025-26
Special Repairs to damaged Canal lining at Ch 0.00 to 3.00 Km and at Ch 5.10 to 6.00 Km of WBC and SR in selected reaches of WBC under RLIS.
Removal of silt and jungle clearance from 0.00 km to 10.00 km of dy-5 of ILC and jungle cutting of ilc main canal ch 8.50 km to 15.00 km.
Supply of Sowdies for Water management for Kharif crops for the year 2025-26 From ch106 to138.00 km, Dy.60 to 98, Hyrige LBC, RBC, Pickup canal coming under HRBC.
Providing and Erecting Metal Beam Crash Barrier from CH 49.000 km to 104.00 km (Balance Reaches) in SR/IP side of CDS Main Canal coming under Srirangapattana Taluk, Mandya District.
Road and Pathway Development Works with Hardscaping and road safety elements, Landscaping and Horticultre along with related Irrigation works for Gardening, Providing Entry and Exit Gates, Signages Allied miscellaneous works for the proposed State
Removal of Silt and Jungle clearance in selected reaches of Distry No- 12 to 13 and 15 to 16 including its Laterals of MLI West canal for the Year 2025-26
Restoration to the embankment portion and repairs to CC lining of Sonthi Branch Canal at Chainage from 9.00km to 10.00km of Sonthi LIS ( In Selected Reaches) for the Year 2025-26.
Removal of Silt and Jungle clearance in selected reaches of Distry No- 19 to 22 and 24 to 28 including its Laterals of MLI West canal for the Year 2025-26
Repairs to Head work Of Dhavaleshwar Distributory,Munyal Distributory and Removal of Silt and Jungle in selected reaches of Saidapur Branch canal ,Munyal Distributory,Dhavaleshwar Distributory,Kappalaguddi Minor and Other Works
Construction of Surface & Sub Surface drainage work sorround in Mangaluru village under command area of Distributory No-2 & 3 of SBC Min Canal in Shorapur Tq. yadgir district (ST Bidders only)
construction of low level causeway and pipe culvert to Hadinaru tank feeder canal with improvements to Hadinaru tank Bund coming under the atchkat of D-26 of DDUC (RESERVED FOR ST)
Package-III Construction of Bridge in Km No 5 (Ch 4.500) of Jamkhandi Branch Canal & Other works & Removal of Silt & Jungle in Selected reaches of Shegunashi Left & Right Dy & other works
Providing out sourcing man power for canal management of RBLIS (0.00 km to 23.00 km) and RBC (0.00 km to 22.00km) and Nittur LIS of ARP for the year 2026-27
Providing Manpower for water management (Tank filling) of Dy No 26, 33 of BMC and Dy No 3,4,7 of HHBC under MLI stage-3 canal network for the year 2025-26.
Removal of silt and jungle in selected reaches of Changravally anicut canal from Ch- 09.60 Km to 17.30 Km, Dy No-2,7,8 ,8A and Amanikere Left & Right side Canl under HLBC.
Advance Pitting work at Hemavathi Park Malekoppalu Village (Canal Road side) Area 3.00 Km Ha in channarayapatna Patna Range Including Raising of 14X20 size 330 pbs Seedlings Estimated Cost 2.273 Lakh
Supply of Man Power for the water management of Main Canal from 41 to 62th km of TBC and D-8 and D-9A of TBC for the year 2025-26
Construction of R.C.C Retaining wall for Protection of Side Slope from Ch, 14865 mt to 14925mt & Ch, 15.325 mt (on IP Side ) in 15th KM & 16th KM of U.T.P Main Canal.
Improvements to Hyrige Tank RBC from ch.0.00 to 7.200 km, from ch.1.500 to 4.00 km of Pickup Canal and ch.0.00 to 3.00 km of LBC coming under HRBC
Reconstruction of canal crossing bridge at Ch.12.30 km and 14.00 km under the road of Mysuru-Mahadevapura-Arakere -Kodiyala -Kothatthi road from ch.6.90km to ch.27.40km in Srirangapatna Taluk.
Improvements to atchkat roads at Jakkahalli coming under Taraka atchkut, at Hoskote coming under Harangi right branch canal and at Kattepura coming under Distributory -21 atchkut of Harangi project (ST Category)
Package work of Removal of silt, and jungle from ch 0.020 to 3.30 of Lat 5 of D-14 , from ch 0.020 to 2.360 of SL1 of Lat 5 of D-14 , from ch 0.020 to 3.700 of Lat 6 of D-14 , from ch 0.020 to 2.500 of D-11 A , from ch 0.020 to 1.500 of Lat 1 of ... R/S canal of ... L/S canal of ... tank canal of