MANPOWER TURVIHAL
Re-Construction of Canal Cross Bridge (Box Culvert) at ch.4.850km of Mahadevapura road to join Erekunte Hundi road (Via Channahalli , Taripura ) in Srirangapatna taluk for the year 2025-26.
Consultancy service for investigation of survey preparations of designs drawings estimates and draft bid documents for FIC work of Minor 4 Minor 5 and sub minors SM1 SM2 SM3 SM4 SM5 SM6 and branch minor of SM6 Minor 7 and Direct outlets DOR 34 35 36 ... of Distributary 6 ... main canal command ...
Construction of Retaining wall along the banks of Krishna river to provide protection to the shores against backwater due to floods in the river coming under irrigation command area of Ingali village Chikodi Taluka (Part-1)
Construction of Retaining wall along the banks of Krishna river to provide protection to the shores against backwater due to floods in the river coming under irrigation command area of Ingali village Chikodi Taluka (Part-2)
Supply of materials for the Construction of Construction of 13L Canal Road Maitling Road from Thimmapura Road to Kumbara Holada at Ragalparvi village. works under Ragalparvi Gram Panchayat under MGNREGS Scheme 2023-24
Hiring of machinaries for removal of weeds and jungle from Ch.3.0 to 8.0 km and 16.0 to 20.0 km of Rampura canal for Summer 2025-26 (Reserved for Cat-IIA Contractor)
Removal of jungle from ch 0.00 to 1.50km of D5, ch 0.00 to 0.90km of D7 and ch 0.00 to 1.30 km of D8 of D.D.Urs Canal. (Reserved for Category II A)
Hiring of machinery and labours for removal of silt from Ch 0.00 km to 1.800 km of D-9 & Ch 0.300 to 3.00 km of D-10 of Kabini left bank canal.
Removal of Silt and Jungle clearance in selected reaches of Tank filling Distry No 2,3,5,6,9 and Lat No 1 of Dy No 9 under Malaghan West Canal for the Year 2025-26
Supplying of Manpower for Water Management of Dy-29.720, 31.350, 31.800, 32.350, 33.075, 34.100, 35.720, D-24, D-26, GBK link canal and Dyst.41.510 of DDUC for the year 2025-26
Annual Maintainance of Removal of silt and jungle under Low level main canal and its Distributeries in selected reaches from km 0.000 to 14.00 of yaragatti LIS for the year 2024-25.
Annual Maintainance of Removal of silt and jungle under High level main canal and its Distributeries in selected reaches from km 0.000 to 18.00 of yaragatti LIS for the year 2024-25.
Improvements of road from Chinnanayakanahally-Tubinakere road to join T.M.Hosur Link canal in Srirangapatna Taluk, Improvements of road and Construction of CC drain in Chandagalu Village Limit in Srirangapatna Taluk Mandya District.
Construction of parking facility for solid waste management vehicles on the municipal land adjacent to the Raja canal near Fern Hotel on Gokul Road within the limits of Hubballi-Dharwad Municipal Corporation
Removal of Silt and Jungle of Dy-1 &its laterals of MLI West And Removal of Silt and Jungle of Dy-2 & 2A of MLI West Canal for the year 2025-26.
Construction of road SH-20 at Sirwar Town Panchayath Premises from Bhagyanagar canal to APMC and Bangle Nala to Muchalagudda camp (Manvi Constituency) . for the year-2024-25. Under.KKRDB MACRO Development Fund .
Removal of Silt and Jungle clearance in selected reaches of Distry No- 29, 32 to 33 and 35 to 43 including its Laterals of MLI West canal for the Year 2025-26
Removal of silt and jungle from Main canal Km 0.00 to 28.00km, Dy No 1,2,3 and 4 and lateral -1 of Dy No 3 under DC-2 of TLIS (at selected reaches)
Clearing of Jungle and silt and Repairing of lining at selected reaches from CH 0.000 km to 19.280 km of Mundawada Branch Canal and its Distributory network on Left Bank of SLIS
Removing of jungle and silt from ch 0.00 to 4.00 Km of Dy no.20 of SBC. & Scour Fillings from ch 65.00 to 67.00 Km of SBC Main Canal ( In Selected Reaches)
Supply, Installation and commissioning of Drip automation irrigation and fertigation system and sensors, The system must be installed one controller with two separate head units holding the capacity to irrigate the whole CoE within 8 working hours
Providing Basic Amenity to RHLD canal reach of Nanadiwadi and CBC block No 23 B Minor which passes through to the areas of Hegganavar thota of Nagaral village in chikodi taluka (part-2)
Removal of Jungle and Silt of Dy-10, Dy-11 and Dy-11A and Laterals of Dy-10 and Dy-11 & Dy-11A of MLI West Main Canal for the year 2025-26.
Drilling of Bore well to Resolving Drinking water problem in Summer Season Near HLC Canal and Supplying of Motar, cable, pipe and other drinking water supply material through borewell at Kamalapura (SC CATEGORY)
Sinking of bore well and installation of motor near Canal in Allavali layout at ward no 02 and near SC ST hostel in Soniya Gandhi nagar at ward no 09 in Manvi Town
Restoration to the embankment portion and repairs to CC lining of Sonthi Branch Canal in Between at Chainage from 8.00km to 8.50km of Sonthi LIS ( In Selected Reaches) for the Year 2025-26.
Removal of silt and jungle clearance of Dy-6 to Dy-15 of ILC and Removal of silt and jungle clearance Main canal from Ch 15.00km to 32.50km in selected reaches of ILC
Removal of Silt and jungle clearance of Lat-1 from Ch.1.00 to 3.00 km & Lat-3 from Ch.1.00 to 5.00 km of Wadavatti Branch Canal of Dy-9(A) of NRBC.
Construction of Surface and Sub suface Drainage in Sy. No. 46/1, 46/2, 46/3 & 46/4 of Jalapur village under command area of CLIS East Canal in Muddebihal Taluka, District Vijayapura
AME for Water Management of Main Canal from km 0.00 to 53.06km and its Distributaries Network (Dy No. 1 to 24) coming under DC-1 of Thimmapur LIS for the Year 2025-26
Restoration to the embankment portion and repairs to CC lining of lateral no -7 of Sonthi Branch Canal from Ch. 1.00 Km to 1.60 Km of Sonthi LIS for the year 2025-26
Removal of jungle , silt and strengthening of embankment on Ghataprabha right bank main canal from km no 120 to 122 and km 131 to 148 at selected reaches During the year 2025-26
Repairs to CC lining from Ch.0.110 to 0.180 of Lat -2 of Dy-19, Dy-26 and lat No-2 of Dy-25 of MLI west canal for the year 2025-26
Widening of road from Nadakal Masjid to Gangavathi by-pass road (SH-49) via Jogi Canal, including shifting of electrical poles, shifting pipeline, providing streetlights in Kampli town limits under 8443-Depsoit grants
Construction of bridge across Hebburu nala at ch 3.00 km to connectivity road of Katiganere to Abbinaholalu village of Ajjampura Taluk for letting out water from UBP Main canal to vanivilasa sagara dam
Construction of Bridge for LLC canal At Ch. 1.450 km in Devasamudra MDR Approach Road from Mudugal-Kudthini (SH-29) in Kampli Taluk, Under 5054 KRDCL-Budget Expenditure for the year 2025-26.
Protection wall in IP side Breached portion beside of CTC/SP Ch.85.70Km of JBC main canal and Construction of Chute at tail end of lat1 of BD-2 of Dy-18 JBC
Creation Of Electrical Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, 1-star Rated Distribution Transformers, Enhancement Of 25kva By 63 Kva Transformer And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of Irrigation Pump Sets Below 500 Mtrs From Existing Electrical Network Registered Before Dt 22.09.2023 And Rs. 10,000/- Infrastructure Charges Collected As Per Order Of Gok Energy Department, Energy/vsc/241/2023 Bangaluru Dt. 07.10.2023 In O&m Sub Division, Navalgund Of O&m Rural Division, Hescom, Hubbali On Ttk & Lump Sum Basis.
1Improvements to Damaged Canal Bund at Dy No.24 of HRBHLC.2) Repair works to Damaged Main Canal Bund at CH1200 M and South Branch Under Tunnel at CH1800 M and 2400 M of HMLIS.3) Removal of silt and jungle in Dy.No.32A ,34A, 38 Minors and Hiritalalu Water Cource of Dy No-41 of HRBHLC 4) Construction of Breached Embankment Portion at Ch10800.00M IP Side of Dy No 28 of HRBHLC.
Improvement to Service Road of Lateral-15 from ch Km 0.00 to 2.00and improvements to service road of Lateral -16 from ch Km 0.00 to 0.500 of Dystributary-1 of Sonthi feeder canal
Due to letting of water in canal,there will be deposition of silt and debries in the canal which is is obstructing the flow in the canal.The rain water falling on side slopes of canal will also carry soil particles and cause deposition of silt in the ... of canal . ... west canal . ... of canal letting ... in canal for ... of canal which ...
Damage due to Flood in august and september month Lining,SR ,IP and embankment portion damaged in severe condition. to give water to farmesr of command area and to safe guard canal system this work is taken up.
Removal of jungle & silt in selected reaches of SD-1 of D-26 & 1st km of D-25A and Repairs to damaged canal of D-25(A) & SD-1 of D-26 under TBC
CONSTRUCTION OF BT ROAD FROM SURESH REDDY HOUSE TO 54th CANAL (LINGAPPA HOUSE) IN RAMREDDY CAMP OF SINDHANUR TALUKA RAICHUR DISTRICT UNDER KKRDB (MICRO) FOR THE YEAR 2025-26 (RCH2520223414)(RESERVED FOR CATEGORY IIA)
Jungle cleaning near the National Highway near the vacant site of Nagaraju under Bashettihalli Town Panchayathi and construction of a concrete royal canal by removing silt mixed with sewage, leveling it with large gravel.
Restoration Of CC Lining and Embankment reach from chainage 8.50KM to 9.60Km and Grounting (Water proofing) of Aqueduct including trough joint from Chainage 6.70Km to 8.20Km of west main canal under Herkal south LIS.
Construction of mitigation works in Biluval Amruth Mahal Kaval land as a part of mitigation measures proposed by animal husbandry department for the construction of the Tumkur Branch Canal under the Upper Bhadra Project.
Construction of Surface and Sub-surface Drainage works surrounding Ingalagi village under command area of Dy No-21 & 24 of DC-1 of TLIS. & Main Canal AT Ch 49.00 Km. TQ- Bagalkot. Dist-Bagalkot.
Providing Manpower for operation and Maintenance of 1 MW Solar photo voltaic system & 11KV line and terminal Bay of solar plant at Ch .11.00km of ARBC main canal top for the Year 2025-26