Loading…
Loading…
9,651 results • Best match
AME of canal network for ILC Dy.No.18 from Ch 0.00km to 7.00km and lateral no.1,2,3 and 4 of ILC for the year 2025-26.
Providing day/night Man Days for water management of Distributarys No.38,39,40,41,42 & 43 including sub distributories & escape Gates of MLBC Canal for the year 2025-26
AME of canal network for ILC Dy.No.19 from Ch 0.00km to 8.00km and lateral no.1 and 2 of ILC for the year 2025-26.
Construction of concrete road and drain from 0.00 to 0.80 km from canal to Mareguddi road in Budni PM village of Mudhol taluk of Bagalkote District
Removal of Silt & Jungle in South Branch Canal (Selected Reaches ) and Bidari Dy,Chikkalagindi Dy and Arakeri minor-1 (Selected Reaches ) for the year 2025-26
Providing Manpower for Water Management Right Bank Canal from Ch 10.00 to 50.00 Km & 65.00 to 82.00 Km under BNT Project for the year 2025-26
Annual Maintenance of main canal from CH 40.00km to 52.00km of SBC and including all Distributaries, laterals & sub laterals of SBC for the year 2025-26
Hiring of machinaries for removal of weeds and jungle from Ch.0.0 2.0 km and 9.0 to 15.50 km of Rampura canal for Summer 2025-26
Annual Maintenance of Neralekere Sulthan road to Join 12th V.C. Canal Road Via Koramegowdanakoppalu, Marasinganahalli, Gamanahalli (SPT-215) in Srirangapatna Taluk for the year 2025-26
AME of Distributory No 13 Lat 10 to 17 of Indi Branch Canal and From 20.00 to 25.00 km for of KBC the year 2025-26
Improvements to tanks, Canal and Escapes comes under Naregal, Shighihalli and Shingapura village of Hangal taluk coming under Dharma project in Hanagal taluk of Haveri District.
Restoration of CC Lining and Embankment at Ch. 0.150 KM to 0.450 KM of Dy-13 of East Canal under CLIS to fill Rayankere M.I. Tank.
THE SUPPLY OF MATERIALS FOR THE CONSTRUCTION OF CANAL FROM SIDDAPURA ANTARAGHATTAMMANA TEMPLE GULLADAMANE GRAMA TO HALLA, GULLADAMANE GP, TARIKERE TALUK, CHIKKAMAGALURU DIST UNDER MGNREGS SCHEME
Providing and laying of HDPE pipeline for Drinking water purpose from 91 canal to P Adeppa Library at Ward No 17 in Sirwar Town Balance Work
Providing Neerugantis/Sowdies for canal water management for Kabini,Nugu, Hullahally and Rampura channel under No-4 Nugu sub division, Nanjangud for the year 2025-26.
Engaging Sowdies , Sluice operator,for HLBC,from Dy.No. 19 to 53, Kattepura Left bank & Right bank Canal for effective Khariff watermanagement for the year 2025-26
Restoration & special repairs for sill Beam & PMC Concrete of Damaged portion including gate paintings of Left bank canal of tunga dam for the year 2025-26
AME of Canal of Branch Distry No.1 of NRBC Distry No.16 from Km 0.00 to 25.00 Km & its Laterals for the year 2025-26
Temporary Repair of colapsed Road Bridge Abutement across the BRRBC main canal at Ch 83.15 Km near Basavapura Village in Channagiri Taluk.for the year 2026 27
Construction of Cross Regulator at Ch 41.00 Km of SBC Main Canal for diversion of Water to Shahapur Storage tank for drinking purpose during summer period
Maintenance of Second year old Monsoon Plantation from H.Matakere village to Hebbalaguppe village Canal side of 4.50 Km at H.D.Kote Social Forestry Range during 2026-27
Clearing thick Jungle & Removal of Silt in Branch Canal at Ch 3.00 to 4.60Km & its minor no 3 and 4 coming under D-56 of KRBC.
Construction of New Aqueduct parallel to the Existing Aqueduct at Ch.14th Km of Chamaraja Right Bank Canal (CRBC) in K R Nagara taluk, Mysore district
AME of canal network for ILC Dy.No.22 from Ch 5.00km to 12.00km and lateral no.5,6,7 and 8 of ILC for the year 2025-26
Construction of surface & sub surface Drainage work surrounding Kambagi & Katral villages under command area ofMalaghan west canal AT Ch. 66 & 67 Km.of Tq-Babaleshwar , Dist-Vijayapura.
REMODELLING OF DD URS CANAL FROM CH 74.00 KM AND BEYOND TO ACCOMMODATE THE ADDITIONAL DISCHARGE OF CHIKKANANDI LS TO FILL TANKS IN TAIL END REACHES.
Construction of Bridge and pickup in Lokapavani valley near Jodihosuru village, Improvements to Road and feeder canal from Lokapavani valley to Somanahalli tank in Nagamangala taluk.
AME of Canal of Branch Distry No.1 of NRBC Distry No.16 from Km 0.00 to 25.00 Km & its Laterals for the year 2026-27.
AME of Canal for the year 2026-27 of BD-2, BD-3, BD-4 & BD-5 and its laterals of BDs under NRBC Distry.16.
Repairs to bed and side Side lining at Chainage 40.280 to 40.290 and 42.470 to 42.500 of MLI West Canal for the year of 2026 - 27
Repairs to bed and side Side lining at Chainage 46.370 to 46.470 and 48.890 to 48.900 of MLI West Canal for the year of 2026 - 27
Construction of rain water canal from Vedapurusha Indane Gas Godan on Prasannahalli main road to Devanahalli boundary Rajkaluve at ward no.01 under Devanahalli municipality limits
Due to letting of water in canal, there will be deposition of silt and debris in the canal which is obstructing the flow in the canal. The rain water falling on side slopes of canal will also carry soil particles and cause deposition of silt in the ... of canal . ... of canal of ... West Canal . ... of canal before ... in canal for ... of canal which ... West Canal . ...
Renovation of Superintending engineer, Deputy chief engineer and Design executive engineer chambers in the chief engineers office, KNNL, Irrigation north zone Belagavi and Construction of toilet block at CE quarters
Conducting third party inspection and Project management consultancy services for quality assurance for Re-Modelling of Nagamangala Branch Canal from Ch0.00km to 78.46 km
MANPOWER NO4 MASKI
Repairs to damaged portion of CC lining at selected reaches and SR formation at selected reaches from 22.00 to 33.00 km and its distributaries ARBC Main canal.
Hiring of machinery and labours for removal of silt from Ch 22.750 km to 23.000 km & Ch 23.300 km to 25.250 km of Kabini left bank canal.
Hiring of machinery and labours for removal of silt from Ch 17.400 km to 19.100 km & Ch 19.200 km to 22.050 km of Kabini left bank canal.
Providing water management to regulate gates coming under main canal Km.106 to 115 under MLBCanal & 44 to 46th bock of MLBCanal for the year 2025-26
Jungle clearance and improvements to SR of JBC main canal from ch 2.00km to 7.ookm, 7.00km to 12.00km, 12.00km to 16.00km and 16.00km to 20.00 km.
Hiring of machinaries for clearing jungle and silt in Rampura canal from ch.12.00 km to 24.00 km for the year 2026-27.(Reserved for ST Contractor)
Removal of silt and jungle clearance from 0.00km to 8.76km of Dy-2A of IBC and Jungle cutting of IBC Main canal from Ch 5.00km to 10.00km
Clearing thick Jungle & Removal of Silt in Ridge Canal at Ch 1.20 to 3.90Km and its minors coming under D-56 of KRBC (Reserved for SC Contractor)
Removal of Jungle and Silt Clearence from Lateral No.9,11,12 ,13 & its Sub laterals of Arakera Branch Canal of D-9 (A) of NRBC.( In selected reaches )
Providing outsourcing man power for canal management of LBLIS (0.00km to 21.00km) and LBC (0.00km to 23.00km) and Arkavathy dam of ARP for the year 2026-27
Restoration to the embankment portion and repairs to CC lining of Sonthi Branch Canal at Chainage 7.50km to 8.00km of Sonthi LIS for the Year 2025-26.
Construction of cut and cover conduit in deep portion at ch 54.950 to 55.450 and other improvements works in KM 56 to 62 of MRBC main Canal
Restoration/Replacement of trash rack gate & platform for intake canal at 2nd head work, 5 trash rack gates at 1st & 2nd head work of RLIS at Anehosur.
Construction of C.C road and drain in Yadakola village(Balance work), Basaveshwara, Mallikarjuna and Dandinamaramma temple road coming under the atchkat of D-26 of D.D.Urs canal.