Loading…
Loading…
13,592 results • Best match
Clearing the canal by removing all accumilated silt,Vegitations, jungle etc
646/24 Thilannur Canal Changatt Kavu Road Tarring In Division 30
269/23-24 pazhaya post office canal pady road maintenance IN KADAMBANAD GPKADAMBANAD GP
Pro No-499/25-RENNOVATION OF VAYANASALA CANOLI CANAL ROAD IN WARD 22Civil Work
Canal bridge Milma society road 4th reach metalling and tarring 5TH REACH Ward 19
SULTHAN CANAL-Re construction of Damaged Drainage on the left and Right Bank of Sulthan Canal Between MLC foot Bridge and Muttom Foot Bridge in18th Ward of Madayi Panchayath.-General Civil Work
Erection and commissioning of Hanging Solar Power Fencing from Potta to IIP Canal in Kurisumudy Forest Station under NSC, Kalady during 2024-25
Canals and Bunds- Ch.1628.00 to 3656.00 m, Construction of Box Culvert-Single span-2 Nos., Construction of Sluices- 3 nos., Construction of Ramp-2 Nos.
Lining of canal between Ch. 0.250km and Ch.0.300km of Ambunad MD
Rehabilitation of LIS- Reconstruction of damaged canal of Payode North LI Scheme
Providing fancy lights in canal side walk way ,Pannampalli Nager ,Division 56
Ch.2960m of Cleaning Chenkal Minor Branch canal and near Ch. 4260m
Urgent rectification works to Manappattuchira right bank canal of Malayattoor - Neeleeswaram Grama Panchayath.
Reconstruction of Pongamoodu - Punnavoor Bridge across NIP Canal inKattakada Constituency in Thiruvananthapuram District
Clearing and Desilting of Moorikkara dty canal and moorikkara fb in kakkodi gp
Rectification works to Kulanada Branch canal near ch 250m
Construction of Pump House
Soil and water conservation works-Construction of check dam with laterite masonary side protection work for existing recharge pond and revetment works.
Tirurangadi Block Panchayath Annual Plan 2019 2020 . Project No 33 Repair works to naduthodu construction of check dam at peruvallur grama panchayath
SDRF 2018 Urgent rectification of side bund of upstream side of eettichuvad check dam in ward no.10 of Chittar Grama Panchayath
Maintenance of Irrigation structures like VCBs,Office Building and other allied works etc.
KND 2020-21 Proj. No. 105/21 Mar Coorilose Canal Junction Kuruppupady Road Retaring in Ward 7
GENERAL-MSN/WS/2022-23-MVIPOverhauling and annual maintenance of main canal shutters at Malankara dam (Mechanical) -
-Puthuppady LI Scheme-Rectification of branch canal near Puthuppady - Mulavoor junction in Kothamangalam Municipality-General Civil Work
Annual maintenenance of canal
Annual maintenance of canal
Annual maintenance of canal
rECTIFICATION OF CANAL
Construction of aqueduct in place of collapsed Varayannur aqueduct
Clearing jungle,earth work excavtn,DR masonry,PCC 14 8 40mm, Centring,PCC 1 2 4 20mm,RCC,Plastering,Scheme 1 to 7 and Filling with Quarry Muck
Retarring works to Karinkal kuzhi canal Neerpalam road
Road ,INTERLOCKING AND CONCRETING OF FOOTPATH, Canal work
Cleaning of West Coast Canal
Construction of Kannankara Aqueduct - Vellamkoore Canal road
PVIP -Construction of Culvert across PVIP canal
Maintenance of Canal road Puthuchira Muthalakkodam road
Rectification and Maintenance of peruvayal fb canal
GENERAL-DEVELOPMENT OF WATER WAYS AND CANALS- Feasibility study- for Inland Water Transport-Feasibility study- for Inland Water Transport-Improvements to boat channel from Nanicheri Bridge towards Chengalaayi in Valapattanam River in Irikkur LA
Providing Irrigation Facilities to Manikkathakidy Padashekharam in Peringara Panchayat of Thiruvalla Constituency.General Civil Work1
GENERAL Action PIan 2O23 24 KIP LB Cleaning of canals for ensuring smooth flow of water prior to water distribution for the year 2023 2024 under KIP LB section 28 19 Kottiyam General Civil Work
GENERAL Action Plan 2023 2024 KIP LB Cleaning of canals for ensuring smooth flow of water prior to water distribution for the year 2023 2024 under KIP LB section 30 19 Kottiyam General Civil Work
GENERAL-Action plan 2025-26-MVIP - ACTION PLAN 2025-26-Engaging labour/Machine and Annual maintenance works for the canals under MVIP Section No.1/7 Muvattupuzha for the year 2025-26- General Civil Work
GENERAL Action Plan 2024 2025 KIP LB Cleaning of canals for ensuring smooth flow of water prior to water distribution for the year 2024 2025 under KIP LB section 30 19 Kottiyam General Civil Work
GENERAL Action Plan 2023 24 KIP LB Cleaning of canals for ensuring smooth flow of water prior to water distribution for the year 2023 2024 under KIP LB section 29 19 Kottiyam General Civil Work
GENERAL-ACTION PLAN 2025-26-MVIP - ACTION PLAN 2025-26-Engaging labour/Machine and Annual maintenance works for the canals under MVIP Section No.2/7 Muvattupuzha for the year 2025-26- General Civil Work
GENERAL Main canal PyIP Construction of wingwall and leading channel at D S of Super Passage of Main Canal near Ch 11 050km at Kara for the year 2023 24 General Civil Work
Tarring works to Alakkadan Kolachery palam canal kozhi farm road
Clearing light jungle and removal of silt from open canal
Clearing light jungle and removal of silt from open canal
Providing irrigation facilities in newly constructed naturally ventilated poly house for black pepper quality production