Loading…
Loading…
13,620 results • Best match
Annual Plan-Thirunnavaya G P- Pro no 158/2023-24-Avasana Karathur Canal Road Concreting-General Civil Work-Re tender
GENERAL CPP MLBC Urgent Rectification of damaged portion and arresting leakages near Ch 4 100 Km of High Level Canal
KONGAD GP 2024-25 RENOVATION OF CANAL ROAD FROM SULTHAN ROAD TO AQUADUCT WARD NO. 1-PROJECT NO. 369/25
GENERAL-MP-AP-2025-26- Urgent repair works to the off take shutter of Kuzhalmannam branch canal-.-General Mechanical Work
north paravur municipality layinf of cover slab to existing drain at park avenue road and stadium canal in ward 21
2025-2026 PRO NO 135 KAITHARAVU- THATTANCHALLA-VANUVAMPADAM AKAMPADAM CANAL MAINTENANCE IN PERUMATTY GP-135 25-26-General Civil Work
196/2023-24-2023-24 velinalloor GP annual plan project- Contruction Kip Canal road in oyoor ward(196/2023-24)
CPP MLBC Annual mtce for the year 22 23 clearing and jungle and removing silt Meenkara No 1 branch canal
GENERAL PIP LBC 2024 25 Annual Maintenance to Chennithala Branch canal between 0 m to 8032 m General Civil Work
GENERAL-KPIP-Replacement of cross regulator shutters and rectification works of surplus shutters of Kanhirapuzha Canal system- General Mechanical Work
Rehabilitation of LIS 2021-22 Urgent Reconstruction works of Unneenkutty branch canal of Thrithala LIS in Thrithala Panchayat Phase II
Renovation Canal at Kuttur Paddy Field-ward -2 in Vengara GP under annual plan 2022-23-Project No.012/23
SDRF - De silting of NC Canal Ch1940m to 4840m (Reach 2) in Vatakara Muncipality, Chorode and Eramala Panchayat , Kozhikode District.
GENERAL-Ponnani Municipality Project No E5 - 17082-23 - Rejuvenation of Nila Bridge PondCanoli Canal Water Rejuvenation Park-General Civil Work
GENERAL-OPERATION VAHINI 2026 -2027-Cleaning of branch of Champakkara Canal near Kadakkodam Anganawadi in Thripunithura Municipality-General Civil Work
Annual Plan-Vattavada GP 2024-2025 Thalakottavadi Umankadavu Palam Varai Canal Construction Ward-10 36/25-General Civil Work-1
Annual Plan pro no 272 25 Neeleeswaram no 1 canal side protection Malayattoor Neeleeswaram gp 25 General Civil Work 25
IIP-LLC- Annual maintenance of Low level canal from Ch.9100 m to 12000 m or the year 2025-26
KIP Oand M Annual maintenance of RB main canal from ch 51029 m to 57340m for the year 2022 23
Annual Plan-Karukutty GP Pro No 185-26-Balaji kavala Mookkannoor Canal Bund Road Construction Ward-6-General Civil Work
PREMONSOON 2026- 27-Urgent cleaning and desiltation of Puthumanal Thekkedathu thodu connecting TS Canal near AMC Junction in Neendakara Panchayath
Annual Plan-Nenmara GP 2023-24 Kothassery maataayi canal bund road in ward No 12-Prj No 207/2023-24
MLA-SDF-Edavetty GP 2023-24 MLA SDF Ambalam Canal road construction in ward 01-Road concreting-General Civil Work
MIRPA Revamping of LIS 2019-20 Uent repair works to Main canal near 550m of Thirumittacode LIS in Thirumittacode Panchayath
Annual Plan-2025-26 Poruvazhy GP Proj No. 120/25-26-Concreting of nediyapadam north canal road at ward 17
Annual Plan-EDATHALA GP 2025-2026 Project No 450/25-26 Kathapuram Canal Road Side Protection work in Ward-13
SO-73/27,Ward-18-Drain construction of peringottmugal road townhall road tarring and canal road interlock in ward 18
CPP-TMS-ACTION PLAN-2026- 27-Annual Maintenance Of Thembaramadakku Main Canal Between Ch 5/500km To Ch 9/600km
DEPOSITROAD WORKSKIPLBConcreting of Kuzhimathicadu Sree Krishna Swami Kshethram Canal Bund Road near Ch3900m of Pallimon DistributaryReach 1 General Civil Work
DEPOSIT Deposit work KIP LB Main canal road from Magistrate mukku to Havva Beach in Ezhukone Gramapanchayath General Civil Work
CIVIL WORKS
PyIP Clearing light jungle and Removal of floating bodies putting temporary cross bunds lubricating and controlling shutters etc during water distribution of Main Canal etcfrom ch5 080km to 15km Edakkad Branch canal
SDRF-CPP-MRBC-Rectification and Renovation of traditional ana and canal system of Korayar river in Kozhinjampara panchayath-Angarath system originating from Angarath checkdam chittur road to Karakarakkulam end middle reach
SDRF-CPP-MRBC-Rectification and Renovation of traditional ana and canal system of Korayar river in Kozhinjampara panchayath-Kalyanakrishnayyer system originating from Kakkarapathy checkdam from checkdam outlet to 1st road cross.
This estimate includes provisions for cutting trees and the estimate includes cutting of branches, felling tree below and above 240 cm girth,supplying and fixing earth filled empty cement bag, Hydraulic Excavator for silt removal and eng
Deposit work RWSS to Paipra Extension of pipe line from MC road to Ayyappan colony aquaduct canal bund bhagom road in ward No. 15 of Paipra Panchayath
GENERAL-PSM 2022-23 -Monsoon Preparedness - LBMC and branch canals - Removal of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition under Mannamangalam Section
GENERAL KyIP ACP(PLAN) 2025 26 Rectification of Karuvannur Distributary in b e t w e e n c h 0 2 7 0 0 t o 0 3 5 0 0 k m i n Naduvannur Grama PanchayathGeneral Civil Work
Construction of protection work in Mokavoor sub dty canal bw ch 1/850 and 1/900
Clearing Jungle and desilting of Maniyur branch canal between ch 3/000 km and ch6/000km
Clearing Jungle and desilting of Maniyur branch canal between ch 0/000 km and ch3/000km
GENERAL-MVIP-ACTION PLAN 2025-26- Annual maintenance of Mulakkulam branch canal ch 0m-ch 6770m for the year 2025-26- General Civil Work
MP-LADS-Steel Foot Bridge-Construction of Steel foot bridge in kazhuvettukunnel Chingoli Grama Panchayath, Ward no.1(Implementation through Irrigation Mechanical)
GENERAL_Pazhassi Irrigation Project _AMC for 62_5kVA Diesel Generator Set_Annual Maintenance contract for 62_5kVA DG set including general servicing at Pazhassi dam_General Electrical Work
DEPOSIT-Udhayarmannam Sreekrishna temple canal bund road - between Ch. 8-900 - 9-100 km and of Peringottukurissi Branch canal i n M a t h u r G r a m a P a n c h a y a t h i n Kuzhalmannam Block panchayath
GENERAL WP CSP NP Annual maintenance for 2025 2026 Clearing and Removing grass jungle and silt for Pudussery main canal in between ch 0 00km to 06 400 km Ramassery branch canal in between ch 0 00 km to 0 800 km and Pudussery minor Kurudikkad
GENERAL WP Annual maintenance for 2024 2025 Clearing and Removing grass jungle and silt for No 3 Distributory canal between ch 04 724 km to 12 036 km tail end and Kallepully branch canal in between ch 0 00 km to 01 950 km General Civil Work
GENERAL WP Annual maintenance for 2024 2025 Clearing and Removing grass jungle and silt for Tattan canal between ch 0 00 km to 03 500 km and Kovilakam canal in between ch 0 00 km to 0 800 km tail end 3654 2024 General Civil Work
Removal of block from Valakom branch canal and distributeries for the year 2025- 2026-General Civil Work
SDRF-CPP-MRBC-Rectification and Renovation of traditional ana and canal system of Korayar river in Kozhinjampara panchayath-between-Angarath system originating from Angarath checkdam chittur road to karakarakkulam end initial reach.