Loading…
Loading…
13,626 results • Best match
canal works
Canal maintenance
Canal works
Canal work
canal maintenance
Canal works
canal works
Canal maintenance
Canal work
canal maintenance
Canal Lining
canal work
Canal work
Canal Rectification
Canal Protection
Canal work
canal work
canal work
Canal maintenance
canal works
Canal work
canal work
Canal work
Canal work
Canal work
Works canal
canal rectification
Canal work
canal work
Canal maintenance
Canal Work
Canal work
canal work
Canal Work
canal Work
canal works
canal work
Canal work
Canal work
Canal work
GENERALCPPNP202627MLISmain canal
Canal deepening
Canal lining
Big rock was fallen from the right side bund of RBC main canal at Ch 6/200 km. Since the region was high cutting area, rock was only found during canal cleaning process.As the rock was huge and it will cause obstruction for water distributi
cutting of branches of trees, feeling down tress, placing of information board at canal road crossing at Punnala and Chekon distributory and at Chaliyakkara aqueduct
Breach-Urgent Rectification work to the collapsed right side wall at Ch 6/230 km and at Ch 7/100 km of Perumbavoor Branch canal
Removal of obstructions during water distribution and other works for RB Main Canal 10/000 to 20/000 km
A n n u a l P l a n - M A L A Y A T T O O R NEELEESWARAM GP 18/22-23 PROVIDING HANDRAILS FOR NEELESWARAM NO.2 CANAL AND SUBCANAL IN WARD 15
GENERAL-PVIP- 2024-25-Repairing of shutters at E - Point - Ch.0.000KM of Aluva branch canal, Ch.0.00km of Mudikkal SBC andCh.0.00KM of Marambilly MD-General Mechanical Work