Loading…
Loading…
13,631 results • Best match
GENERAL Deposit NIP Kulathoor G PConstruction of side protection wall on the left bund near ch 5668m of Karumanoor right branch canal in Puzhikunnu ward General Civil Work
Work Name GENERAL PSM 2023 24 Annual Maintenance of Mudikkode Branch Canal from Ch 0 000 to 6 700 km for the year 2023 24 General Civil Work
MP-LBC-SDRF-Urgent rectification and maintenance works to the Right vent of tail end field channel of Pazhambalakkode branch canal between ch. 0/00 to 0/130km
Annual Plan-265/2023-24-ALAPPUZHA JILLA PANCHAYATH 2023-24 BHARANIKKAVU DIVISIO NBHARANIKKAVU GRAMA PANCHAYATH CONSTRUCTION OF DRAIN AT KOCHAMBALAM JUNCTION PIP CANAL ,WARD 3-General Civil Work
GENERAL-ANNUAL PROJECT 2025-26- PROJECT NO 112/26 PALAKKAPPILLY THODU ROAD CANAL BUND ROAD THADATHIKKAVALA LIBRARY ROAD BLOCK OFFICE LINK ROAD IN WARD 3- General Civil Work
GENERAL-Plan Fund 2025-26-MP-2025-26- Renovation to the field bothie at off take ch 0/337 km of Manjallur branch canal (Kadaamkode)-General Civil Work
SDRF CPP MLBC Urgent rectification works to flood damages in Main Canal between Ch 20/550km to Ch 21/050km and Ch 21/180km to Ch 21/600km
Cheramangalam scheme 2020 21 Improvement and urgent rectification works in Cheramangalam scheme 2020 21 Improvement and urgent rectification works main canal ch 8 250 to 8 350 km
Vengad GPCMLRRP Phase 3 (Sl No 850)Vengad Metta Rayaroth Palam Canal Road Retarring from ch 0/000 to 0/110 km and 0/295 to 0/845km
GENERAL-ANNUAL PROJECT 2025-26- PROJECT NO 106/26 ELAVUMPARAMBU LINK ROAD RETARRING HARITHA NAGAR ROAD RETARRING MINIPPADY CANAL ROAD HANDRAIL FIXING IN WARD 7-General Civil Work
Repairs to MI Structures Urgent rectification and improvement works to Thenkara Branch Canal of Anamooli head diversion scheme near Valakkara Mootharukavu in Thenkara Grama Panchayath in Palakkad district
GENERAL CPP MLBC Annual maintenance for the year 2023 24 Jungle clearance uprooting and silt removal from Koduvayur branch canal between ch0/000 km to 2/700 km
GENERAL CPP MLBC Annual maintenance for the year 2023 24 Jungle clearance uprooting and silt removal from Olassery branch canal between Ch 4/250 to 8/500 km
GENERAL MP LBC PS ANNUAL MAINTENANCE 2022 23 MP LBC Urgent Rectification works of Edathara Branch canal between Ch 3 970Km to Ch 3 995Km General Civil Work
GENERAL Protection Works CSIND Protection works to the Right bank of TS Canal U/S of Channankara bridge near Ch.27.00Km in Kadinamkulam Grama Panchayath-General Civil Work
MIRPA- 2025 Tharammalkadavu LIS-Revamping and Rejuvenation of LI Schemes - Renovation Of Canal and Allied Works to Tharammalkadavu LI Scheme in Kodiyathur Panchayath Kozhikode Dt-General Civil Work
SPECIAL REPAIR TO RCC BRIDGE OVER 20 FEET CANAL AT MOK AND CERTAIN SNCTIONED WORKS OF AGE B R III AND AGE E M UNDER GE NW KOCHI
GENERAL Urgent Rectification work for Aqueduct Urgent Rectification work for the Aqueduct near ch 875 m of No 4 LIS Main Canal in Ramamangalam GP General Civil Work
GENERAL KyIP ACP NP 2025 26 Urgent works for Jungle Clearance and silt removal of Thuneri Branch Canal from ch 0 000km to Tail end General Civil Work
Annual maintenance Chelakara-Annual Maintenance of Pazhayannur LIS for the year 2022-23 RBC and main canal ch.0/000 m to 2/200 km.-General Civil Work
GENERAL-AP-2025-26- MP-AP-2025-2026- Urgent repair works to the Well drop at ch 4/400km of Kunissery no.1 branch canal.- General Civil Work
Annual Plan-Mangattidam GP 2022-23 Eruppachal kurumbukkal Vayal canal road tarring in ward 11 from Ch 0/000 to Ch 0/098-Proj No 173/22-23
GENERAL KyIP ACP NP 2025 26 Urgent Works for Jungle Clearance and silt removal of Azhiyur Branch Canal from Ch 12 500km to 17 100km General Civil Work
GENERAL CPP MLBC Annual maintanence for the year 2023 24 Jungle clearance and silt removal from Arampadam branch canal between Ch 0/000 km to 5/000 km
Annual Plan-Proj No 622-Annual plan-23-24-Deepening and cleaning of canal running from north side of the kuwait residency in railwastation ward-General Civil Work
GENERAL CPP MLBC Annual maintanence for the year 2023 24 Jungle clearance and silt removal from Arampadam branch canal between Ch 5/050 km to 10/000 km
Rehabilitation of LIS 2019-20- Urgent Reconstruction of Main canal near Ch. 4917 to 5000m tail end and Ch.1629 to 3123.7m of Thenampara LIS in Thrithala Panchayat
GENERAL-Chekuthankund LI Scheme-Urgent reconstruction work of LB CANAL from ch. 1150m of LIS Chekuthankundu in Thriprangod Grama Panchyath in Thavanur LAC, Malappuram District-General Civil Work
GENERAL KIP LB Rectification Urgent rectification of damaged canal b/w Ch. 450 to850m and b/w Ch1000 m to 1200 m of Attuvasery distributory General Civil Work
Annual Plan-2025-26/KDSY/PR. NO. 86/26 - MARAMKODE VALIYA CANAL BUND ROAD RETARRING IN WARD 5 - KODASSERY GP - Chalakudy BP-Retarring of Road-General Civil Work
GENERAL-MONSOON PREPAREDNESS 2026-27-MP LBC-PS-LB Main canal from 0/300 km to 20/200 km and its branches and field channels.-General Civil Work
GENERAL-Malayil thodu Padasekharam-KPFMP- Removal of accumulated earth and protection works of Malayil canal at Malayil thodu Padasekharam in Purakkad Panchayath in Ambalapuzha LAC-General Civil Work
GENERAL-Plan Fund 2025-26-MP-2025-26- Renovation to the field bothie at off take Ch 1/600km of Kuthanur no1 branch canal(Korangode)- General Civil Work
GENERAL KyIP ACP NP 2025 26 Urgent Works for Jungle Clearance and silt removal of Azhiyur Branch Canal from Ch 0 000km to 12 500km General Civil Work
Annual Plan-Thrissur Corporation 2023-24 project 661/24 Koorkanchery Zonal Division 33 Balance Renovation- of the canal side- Pattala Kinar concrete road balance portion - General Civil Work
GENERAL-CSM - 2026-27-Urgent Removal of obstructions in LBMC from Ch 29/300km to 40/900 Km and kondayoor branch canal including cutting trees-General Civil Work
GENERAL WP NON PLAN 2026 27 Annual Maintenance Including Clearing Jungle, Grass And Aquatic Weeds Along With Desilting Operation In Main Canal Between Ch 0 000 5 600
CIVIL WORK
Renovation of Tagore Colony Road and Canal Road left side and Right side constructin and Maitenance of Thomman lane Road Kalappurackal Road in Ward
Construct new canal of 179m and the repairs of existing canal
The work is proposed in KV Canal near Naduvile palam in Thottuvakkam for the removal of water hyacinth, unwanted grass, heap formation and silt in the remaining portion towards the vembanad kayal mouth for a length of 370m
GENERAL-HARITHAKERALAM-MI-PTA- Mundapally kulam and side protection- Improving irrigation facilities to Mundapally kulam and urgent protection works in ward no 3 Nedumbram Grama panchayth in Thiruvalla constituency -General Civil Work
clearing grass ,clearing jungle and earth work
TREE CUTTING
Tree cutting
Tree cutting
CONCRETE ROAD WORK
removal of floating bodies
CSIND Surveying and soil Investigation works for the Reconstruction of Edakadappuram foot bridge at chainage 345.878 in west coast canal in Tanur Municipality Malappuram District Investigation Work
Annual maintenance of Paravoor branch canal between Ch.0 km to 3.20 km including removal of floating bodies for 1 year