Loading…
Loading…
13,631 results • Best match
A n n u a l P l a n - M A L A Y A T T O O R NEELEESWARAM GP 18/22-23 PROVIDING HANDRAILS FOR NEELESWARAM NO.2 CANAL AND SUBCANAL IN WARD 15
GENERAL-PVIP- 2024-25-Repairing of shutters at E - Point - Ch.0.000KM of Aluva branch canal, Ch.0.00km of Mudikkal SBC andCh.0.00KM of Marambilly MD-General Mechanical Work
GENERAL KIP LB Monsoon Preparation works for canals under KIP LB Subdivision No 13 Kollam General Civil Work
Annual Plan-S0067/25-CHALAKUDY MUNICIPALITY-(2024-2025)-CLEANING OF PUBLIC CANALS BEFORE PRE MONSOON-General Civil Work
Action plan 2021-22 Mangalam project Dam Section Improvement of Kalavapadam distributory to the canal between ch 0 008 to 0 110 km and between ch 1 050 to 1 170 of LBMC
Urgent Works for Jungle Clearance and silt removal of-Velom BC from ch 0.000 to tail end and All fbs from this canal
Implementation of Artificial Recharge Schemes at 1. Office of AEE, Kutyadi Irrigation Project, Canal Sub Division, Puthuppanam 2. Kerala Khadhi and Village Industries Board, Khadi Production Centre, Angakalari, Naduvannur 3. Kakkur Police Station
deepening of thodu
SUPPLY OF PUMPSET AS PER THE SPECIFICATIONS IN NOTICE
POND CLEANING
construction of cut and cover
OBT- PHASE IV-Upgradation of Thevara Perandor Canal (Ch 0.000 to 2.500 Km) in Kochi Corporation , Ernakulam District under Operation Break Through Project Phase IV-Reach1
GENERAL-OBT- PHASE IV-Upgradation of Thevara Perandoor Canal (Ch 7.250 to 8.700 km ) in Kochi Corporation , Ernakulam District under Operation Break Through Project Phase IV
KyIP ACP NP 2024 25 Urgent works for jungle Clearance and silt removal of Right Bank Main Canal from ch 20 000 km to 27 000km
Rectification works to the damages of CADA Field Channel No.19 (LHS) between Ch 0/000km and 0/465km of Nallepilly branch canal at Ch 2/950km.
Rectification works to the damages of CADA Field Channel No.19 LHS between Ch 0/860km and 1/326km of Nallepilly branch canal at Ch 2/950km.
GENERAL-Urgent rectification work-KIP LB Urgent leak rectification of Oyoor Branch canal near Mottakkuzhy between ch 15700 m and 15806 m in Veliyam Grama panchayath. General Civil Work
75987 LAC-ADS-LAC ADS 2024-25 Chalakudy LA - Construction of National Highway-Anju Veedu Road North Main Canal Bund Road, Chalakudy Municipality, Ward 2-General Civil Work
Retender MLA ADF 2020-21 Construction of Protection wall for Kaicanal from Parol thazha to Nadakku thazha chorode canal in ward no. 12,13,14 of Vatakara Municipality-Phase I
GENERAL-OBT- PHASE IV-Upgradation of Thevara Perandoor Canal(Ch 8.700 to 9.950km ) in Kochi Corporation , Ernakulam District Under Operation BreakThrough Project PHASE IV -Reach4-General Civil Work
Annual Plan-2023-2024 Poomangalam Panchayath ,Vellangallur Block Panchayath-171/23-24 Construction Of Irish drain and Side protection at Shanmugham canal north bund road in ward 2
Dam safety-Overhauling and painting of canal sluice shutter, Emergency shutter, Gantry crane and painting of spillway hoisting bridge and accessories of of Chulliyar Dam in Palakkad District
Annual Plan-Koodali Gramapanchayath -2022-23- Tarring Works to Thattiyottambalam Keeruttimchal Canal road from Chainage 0/283 to 0/407 km-Project No.172/23--General Civil Work
Annual Plan-Pro No 325/25- 2024-25 OLK Zonal Div 18 Re taaring of pattalakunnu canal road ilanjikkulam road and road near royal enfield-General Civil Work
E1-6973/21 Side protection wall of Vanachira - Mullumpady road,constrcution of drain at AP varkey road and retarring o fKuzhikkala canal bund road in ward no.6
DEPOSIT-DEPOSIT 2025-26-Balussery Block Panchayath Annual Plan 2025-26 Chalilpoyil Canal Palam (Construction of RCC Bridge at ch 3/905 km of KBC)-General Civil Work
PSM 2022-23 -Annual maintenance of Puthur Branch canal from Ch.0/000 to Ch. 11/260 km and urgent maintenance to spouts for the year 2022-23
GENERAL KAYAMKULAM MUNICIPALITY 2025 26 Malayancanal Fencing Kayamkulam muncipality 2025 2026 Proj no 96 25-26 Fencing of Malayan canal in ward 18 and 19 General Civil Work
GENERAL-S7 GP 17 PETITION -KIP(O AND M)- Urgent Rectification work due to water overflow and canal leak proof work in in Konni distributry -General Civil Work
A n n u a l P l a n - D P P K D 2 0 2 4 - 25 and nbspMARUTHAROAD CANAL BUND ROAD SNEHARAMAM MARUTHAROAD GRAMAPANCHAYAT
GENERAL-PSM 2025-26 - Maintenance works-PSM - Annual Maintenance of Koottala branch canal 0/000 km to 6/150 km for the year 2025-2026-General Civil Wor
GENERALNON PLAN 202425 CPPMLBCAnnual maintenance for the year 202425Annual maintanence for jungle clearance and Silt removal from Arampadam Branch Canal between ch 5050km to 10000km General Civil Work
Cheerakuzhy Scheme- Flood damages Urgent removal of silt from the canal bed between o Ch. 6/050 km to Ch. 11/000 km for the year 2021 - 22
GENERAL-Budget Work 2023-2024-Side protection works to NC Canal from Akloth Nada VCB to Santhi smasanam in Vatakara Municipality, Vatakara LAC, Kozhikode District-General Civil Work
GENERAL-PM-Urgent repairs to BE canal of LI Scheme Irimbiliyam in Irimbiliyam Gramapanchayath Kottakkal LAC in Malappuram Dt Ch B/w 433.00 to 650.0M - General Civil Work
PyIP _ Rectification work of UT in Azheekkal branch canal near ch_12/950km and Desilting of UT in Valiyannur Distributory II near ch_ 0/120km for the year 2023_24
GENERAL AP 2024 25 3Mangalam project CS VDYClearing jungle and Removing silt in between Ch 10 800 to Ch 16 500 Km of RB Main Canal including Distributaries
GENERAL-MVIP ACTION PLAN 2025-26 Annual maintenance of Ettumanoor Branch Canal from ch 12000m to 18525m and its distributories for the year 2025-26-General Civil Work
GENERALAction Plan 2024 25 Annual maintenance of canal 2024 25 Jungle clearance and silt removal in Ulavukadu distributory from Ch 0 m to 1900 m General Civil Work
GENERAL CPP MLBC Annual maintanence for the year 2023 24 Clearing jungle in High level canal between Ch 0/000 km and 7/000 km and ERI Bund
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Vilayanchathannur branch canal between ch 0/000 km to 4/000 km
GENERAL-PVIP-Action plan 2025-26-Annual Maintenance of Perumbavoor Branch Canal from Ch 3.300km to tailend and its FCs for the year 2025-26-General Civil Work
GENERAL-NIP- Action plan-2025-26- Leak prevention near ch 32080m and earth protection face of cut ramp cover ch 32670m of LBC Main canal-General Civil Work
GENERAL KyIP ACP Plan 2025 26 Rectification of leaked portion of Azhiyur Branch Canal near 14 100km and Chorode dty near ch 3 000 km General Civil Work
Cheerakuzhy Scheme- Flood damages Urgent removal of silt from the canal bed between of Ch. 0/000 km to Ch. 6/000 km for the year 2021 - 22
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Kinassery branch canal between ch 0/000 km to 3/500 km
DEPOSIT- Other Deposit 2024-25-KIIDC - Replacement of pipe line to Moolathara Right bank Canal alignment-Distribution main and Pumping main replacement at Eruthenpathy Grama Panchayath-Pipeline Work
SDRF LBC Sub Division Malampuzha Project Palakkad Flood damages- Rectification works of field channel at Ch.5.500 km RHS of LB main canal between Ch 1.200km and 1.349km.
GENERAL NIP Action Plan 2024 25 Side Protection Works Near Ch 26290 m and Height Raising in Ch 25540 m of R B Main Canal-General Civil Work
E1-5895/20 Providing grill work for protection work at chennamveli colony and kuzhikkala canal bund roadand Pallathunjal road tile paving in ward no.6 of Thrikkakara Municipality