Loading…
Loading…
13,633 results • Best match
Annual maintenance
CPP MLBC Annual maintanence for the year 2022 23 Jungle clearance and silt removal from Arampadam branch canal between Ch10/050 km to 18/000km General Civil Work
Annual Plan-2025-26,Alappad Grama Panchayat, Proj. No.91,Construction of Road and Drain from Eerappurathu purayidam to TS canal ,Ward-2
rectification works
KKPSRectification works to Kunnamkattupathy main canal between Ch 17 000 Km to ch 17 100Km ch 17 700 Km to 17 820Km and ch 22 300Km
CIVIL WORK
Removal of water hyacinth
Construction of Thodu for Irrigation
OBT- PHASE IV-Upgradation of Thevara Perandoor Canal (ch 4.500 to 7.250 Km) in Kochi Corporation, Ernakulam District Under Operation Break Through Project Phase IV-Reach 2
Retender-MP -LADS-2024- 2025- Parakkodu BP Work Proposed by honorable MP- Sri. Kapil Sibal- Vrindavanpadi -KIP Canal Road Construction in ward no.12 ofPallikkal Grama Panchayat,PeringanadVillage
GENERAL MP LBC PS ANNUAL MAINTENANCE 2022 23 MP LBC Annual Maintenance of LB Main canal from Ch.0.300Km to 10.000Km for the year 2022 23 General Civil Work
Rayamangalam GP 234/2025-26- Maintenance of towerline link road periyarvalley canal iringolekaavu road towerline link edayal road iringolekaavu menonpadi road kalarickal road in WARD-20- General Civil Work
GENERAL-CSM 2024-25-Emergency monsoon preparedness- Cutting damaged and dangerous trees from the canal bund between the ch.22/950 Km to 40/900 Km - General Civil Work
Annual Plan-KURUMATHUR GP - PROVIDING RETARRING WORKS TO KUTTIKKOL PARADU CANAL ROADPROJECT NO. 51/2023-24 - (RETARRING CH IN BETWEEN 0/000 AND 0/800 KM)- General Civil Work
JJM-2021-22 5th SLSSC 3rd Phase- Koipuram Grama Panchayath.-Pipe Line Extension and Providing 140 Nos FHTCs in Mepurathu Kandam Colony and Canal Manakkala Colony in Ward 14.
R L I S Renovating the damaged portion of canal Pump house and providig delivery pipe line to motor No2 of L I scheme Chaliyar in Areakode Panchayath RETENDER
GENERAL PSM 2024 25 Improvement works to Kozhukkully branch canal between Ch 3 600 to 3 700 km and Ch 4 200 to 4 300 km General Civil Work
GENERAL-PSM 2023-24-Improvement works to Mudikkode Branch Canal between Ch. 0/800 to 0/950 km and Ch. 2/800 to 3/100 km-General Civil Work
GENERAL-PLAN CHERAMANGALAM SCHEME 2025-26-09 Improvements and urgent rectification work to Panampazhakadu cada ch0 000 to 0 200 km starting from main canal ch 0 700 km
LAC-ADS-Kyip-LAC ADS-2025-26- Construction of Bund road and Culvert near Ch.2/450 of Chorode Distributory canal in Vadakara Muncipality, Vadakara lac-General Civil Work
GENERAL CPP MLBC Annual maintenance for the year 2023 24 Jungle clearance uprooting and silt removal from Vilayanchathannur branch canal between ch 4/050 km to 9/500 km
IWT WORKS CSIND Surveying and soil Investigation works for the Reconstruction of Cheerankadappuram foot bridge at chainage 344.973 in west coast canal in Tanur Municipality Malappuram District Investigation Work
GENERAL-WP- CADA (2024-2025) Modernization of Field channal offtakes fromthe ch 0-330 km (LHS) of Koundan canal in between ch 0-250 km to 0-750 km
Sasthamcotta GP 2024-25,Proj no.47 24-25-PANAPPETTY KSHETHRAM FRONT ROAD CANAL TO BEHIND THE TEMPLE TILL WARD BOUNDARY ROAD RETARRING AND SIDE CONCRETING IN WARD 3
GENERAL-MP-LBC-PS- Chirakkad-Deposit Works-MP-LBC-PS-Urgent Rectification of Side Wall of Kodunthirapully Branch Canal Between the Ch 0.013Km to Ch 1.580Km- General Civil Work
GENERAL-MP - PLAN FUND 2024-25- Renovation-of Tail end field channel from Ch 0/650 - 0/900 km of Kalapetty No.1 branch canal (Mambillipadam)-General Civil Work
Annual Plan-WARD 9 2023-24-MOOKKANNUR GP PRO NO-108/24 AAZHAKAM BRANCH CANAL BUND ROAD MAINTENANCE WARD 9 ch from 0/000-0/692-General Civil Work
GENERAL Monsoon Preparedness 2022 23 Felling trees dangerously standing in the banks of KIP canal under jurisdiction of KIP O and M Section 2 1 Adoor General Civil Work
Plan cheramangalam scheme 2024 25Improvements and urgent rectification work to Main canal ch 7 940 8/010 km Pullode FB ch 0 490 0 530 km.-General Civil Work
GENERAL KyIP ACP NP 2025 26 Urgent Works for Jungle Clearance and silt removal of Right Bank Main Canal from Ch 27 000km to 34 270km General Civil Work
GENERAL-PVIP ACTION PLAN 2025-26- Annual Maintenance of Valakam Branch canal from Ch 8/000 km to 12/000 km for the year 2025-26 -General Civil Work
Annual maintenance Chelakara-Annual maintenance of Pazhayannur LIS for the year 2022-23- Maintenance works of pump house and rectification of main canal at damaged portion. -General Civil Work
GENERAL CPP Nurnee System CADA 2024 25 Modernization of field channel from the spout near at ch1 265 km LHS of Vilayodi branch canal Phase II General Civil Work
MLA-SDF-2024- 2025-Parakkodu Block Panchayat- Adoor LAWork Proposed by Sri. Chittayam Gopakumar MLA- Kulathinte Melethilppady Canal Palam Road Construction in ward no. 1 of Ezhamkulam Grama Panchayat
GENERAL CPP MLBC Annual maintenance for the year 2023 24 Jungle clearance uprooting and silt removal from Vilayanchathannur branch canal between ch 0/000 km to 4/000 km
Annual Plan-PDMNA 160/23-24 Re Tarring works of PVIP canal bund road in Ward -4 ( from Chemmenkuth Palam to Nadodi Palam )- Re Tarring works -General Civil Work
GENERAL KIP RB Annual Maintenance GENERAL KIP RB Annual Maintenance Jungle Clearance And Removal of Silt From The Canal Bed of Vallikunnam Distributory GENERAL Civil Work General Civil Work
KIP O and M Annual maintenance of jungle clearence removal of silt and floating bodies from RB Main canal from ch.44015m to 52000m for the year 2021 22
LAC-ADS-KSMART 309408-2025-MLA - ADS -AZHIKODE LAC -HAND RAIL AND FOOTPATH CONCRETE FROM ONDENPARAMBA CANAL ROAD TO ELAYAVOOR BOUNDARY IN KANNUR CORPORATION PUZHATHI ZONAL General Civil Work
SDRF CPP MLBC Urgent rectification work to flood damages in main canal between CH 17/680 KM TO 18/000 KM and CH 18190 TO CH 18/290 KM
GENERAL WP CSP NP Annual maintenance for 2025 2026 Clearing and Removing grass jungle and silt for Ponnanpilla Thekke pirivu and Vadake pirivu canal 2876 2025 General Civil Work
GENERAL-MVIP RBMC 2024-Clearing Bamboo plants along the sides of canal bund road at Ch 0m to 2000m and silt removing work at Ch 11500m -General Civil Work
DEPOSIT-Cleaning Work-Deposit Work- Engaging man mazdoor for clearing vegetation and removal of silt, debris, floating materials in field channels under MP Canal Section Koduvayur-General Civil Work
GENERAL-Action plan 2024-2025-PVIPAnnual maintenance of Kodanad West Branch canal from Ch 4 880 km to 5 620 km and Puzhukkad FC for the year 2024-25-
GENERAL MP LBC PS ANNUAL MAINTENANCE 2022 23 MP LBC Annual Maintenance of LB Main canal from Ch.10.000Km to 20.200Km for the year 2022 23 General Civil Work
Annual Plan-Vellilapongu road sde protection,Vellilapongu Tabore road pipe cutting restoration, Peechanikodu canal bund road, Parumala bava kurisu road in ward 30 of Ankamaly Municipality-AMP124/23-24
DEPOSIT-Ambad foot bridge-Construction of bridge between ch.0/550-0/600 km Odanur branch of Peringotukurissi canal in Mathur Panchayath in Kuzhalmannam block panchayath-General Civil Work
MP LBC Modernisation of Field Channels and Drains - Construction of field channel offtake Ch. 11.100 km of Kuthanur No.1 branch canal to Perumbathampadam Padasekhara Samithi in Kuthanur Panchayath
DEPOSIT-NIP - Parassala GP --Taring and retaring of Ippazhanji bund road on the left bund near ch 3730m of Chenkal major branch canal in Adumankadu ward-General Civil Work
GENERAL AP 2024 25 Mangalam project CS VDY Clearing jungle and Removing silt in between Ch 16 550 to Ch 21 515 Km of RB Main Canal including Distributaries