Loading…
Loading…
13,556 results • Best match
CHMD 2024-25 Irrigation canal road side protection Ward 13 Phase II-Project No 298/25
MLA SDF Relaying of 100mm MS Pipe along Irrigation canal near Asan Nagar under Kuriathy section.
Annual Plan-Kottiyoor G P 22/25-26-Improvements to Ambayathode irrigation canal-General Civil Work
E Tender P.No.310/26 - Annanadu irrigation canal bund road-ward 16-Road construction - Meloor GP
SMN 204/25-26-cover slab over varrikkattu irrigation canal Ward-16 in sreemoolanagaram G P
GENERAL-MP-LBC ES-Action Plan 2023-24- Annual Maintenance of Kurissi-Pampadi branch canal between Ch 0.000 km to 9.000 km and sub canals Kuzhalmannam no.3, Kuthanur no.3, Kuthanur no.4 for 2023-24 Second crop and 2024 first crop
Bldg construction (framed structure)
GENERAL-AP-2025-26-MP-Annual maintenance-2025-26-Silt Removal , Jungle Clearance for Erimayur branch canal and its sub canals(Kudallur, Kunisserry 4, Manjallur and Vemballur) and Pallavur no 1 branch canal-General Civil Work
GENERAL CPP Nurnee Alamkadavu Nurnee System Non plan 2024 25 Annual maintenance of Nurnee main canal from Ch 0 000 km to Ch 6 000 km and Vilayodi branch canal including field canals General Civil Work
GENERAL Annual Maintenance Contracts 2023 24 of various LI Schemes under Electrical Wing Minor Irrigation section Kalady Maintenance of LI Scheme 2023 24 Urgent repairs of defective and perished switch board at various LIS under Electrical wing
Improvements to Canal road with 40 mm cc
Strengthening both banks of Kolani thodu D/S of Perumthanam check dam in ward No 33 and 35 0f Thodupuzha Municipality
GENERAL-Site Investigation -Construction of check dam in Neyyar river near Erattinpuram in Neyyatinkara LA Constituency in Trivandrum district-Investigation Work
PM- Urgent protection works to the check dam across Nedumonkavu thodu near water supply scheme at Kalchira in Kareepra Grama Panchayath
Desiltation work in Poonoor puzha d/s of Undodi Kadavu check dam at Thodukayil in ward no.1 of Kunnamangalam Panchayth
Creation of 20 numbers of brush wood check dam in Varalipathy watershed of Walayar section under Walayar Range during 2024-25
GENERAL-Monsoon Preparedness 2025-26- Desilting works to Palakuli Check dam in Mananthavady Municipality -Mananthavady LAC-Wayanad Dist-General Civil Work
Removal of obstructions from poonoor Puzha at upstream of Puthoor kadavu check dam in ward no.21 of Kunnamangalam Grama Panchayath.
Annual Plan-Annual Plan-2024-25 Puthur Grama Panchayath Ward-6 Nayadichira check dam construction-Pro no159/PTR/-General Civil Work
Annual Plan-DPK-33 24-25-Bhrananganam division Kadanadu GP Kaithakkal Poothakuzhy drinking water scheme check dam rehabilitation General Civil Work
Re-Tender-State plan 2020-21- Construction of new RCC check dam adjacent to the cattle shed at base farm, kolahalamedu.
DEPOSIT-Construction of Mini Check dam - Across Vattakkundu thodu Ward no 10 in Ambalappara Panchayat of Palakkad District- General Civil Work
GENERAL-PVIP-Annual maintenance of check dam shutter, Chenkara regulator and Adiyody regulator for the year 2024-25- General Mechanical Work
Strengthening of Abutment and protection work on Both banks of Plachikkara Check dam in west Eleri Grama Panchayath in Kasragod District
Creation of 10 numbers of brush wood check dam in Poolampara watershed of Walayar section under Walayar Range during 2024-25
GENERAL-MONSOON PREPAREDNESS 2025-2026-De-silting of Makkiyad check dam in Thondernadu Panchayath, Mananthavadi LAC, Wayanad District-General Civil Work
Annual Plan- P.NO 227/24-25- Karoor GP Ward 7 Kavaramunda Check Dam Road Side Wall Construction-General Civil Work-1
LAC ADS Kumaranchira Minor Distributary 2024 25 KIP Canal bund road concreting work from East side of Cashew factory to Plavila Right bank of kumaranchira minor distributary from ch 2700m in ward no 13 of Sooranadu South Grama Panchayath
SDF MLA 2024-25 TB IRRIGATION ROAD
Clearing Jungle and desilting between ch 0/000km and tailend of Vellarkad distributarycanal, Kodakkad distributary canal and Kakkulam Field bothie
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
KIPO and MAnnual maintanence of canals 20242025Jungle clearence and removal of floating bodies during water distribution in Sasthamcotta branch Canal between ch7000m to 18650mGeneral Civil Work
GENERAL-MONSOON PREPAREDENESS 2026-Clearing Obstructions in Canals of LI Schemes and cutting branches of trees along canal bund and Poomala Dam area-General Civil Work
GENERAL-Renovation of canals - 2025-2026- Renovation works to canals of Pallippuram LIS in Ongallur panchayath of Palakkad district-General Civil Work
G E N E R A L A M C 2 0 2 4 2 5 F u l l y Comprehensive Annual Maintenance of Aikkaranad Kudumbanad and Keezmuri LIS Under Electrical Lift Irrigation Section Ramamangalam General Electrical Work
G E N E R A L A M C 2 0 2 4 2 5 F u l l y Comprehensive Annual Maintenance of Karukapilly, Kuryathodu, and Mekkadambu LIS Under Electrical Lift Irrigation Section Ramamangalam General Electrical Work
Annual Plan-KMBP-2024-25-175/25-KREPAKeerampara Grama Panchayat Ward 8 Perumannoor Nadukani Thodu Ambalam Pady Bhagam check Dam Completion-General Civil Work
GENERAL-KIP (LB)-Reconstruction of breached flume canal in Paravur distributary at Ch. 6000 m near upasana junction in Chathanoor Panchayath General Civil Work
GENERAL-KyIP ACP(PLAN) 2025-26 Rectification of cheruvannur muyipoth distributary canal between ch0 200 to 0 700km in Mepayyur Grama panchayath GeneralCivil Work
PyIP_Emergency repair of Man hole of Cut and Cover near Ch _ 11_000 Km of Panniyannur Distributary of Mahe Branch Canal for the year 2024_25
GENERAL-KyIP - ACP (NP) 2025-26- Clearing and desiltating of Cherandathur distributary canal between ch 0/000 km and tail end-General Civil Work
GENERAL-KyIP ACP PLAN 2025-26-Rectification works to Thiruvallur Distributary Canal in between Ch. 1/300 and 1/400 km- General Civil Work
GENERAL-KyIP ACP (NP) 2025-26-Clearing jungle and desilting of Thiruvallur Distributary Canal from Ch.5/000 to tail end-General Civil Work
GENERAL-KyIP ACP (NP) 2025-26-Clearing jungle and desilting of Thiruvallur Distributary Canal from Ch.0/000 to 5/000-General Civil Work
Rectification of Irrigation Canal
Rectification of Irrigation Canal