Loading…
Loading…
13,556 results • Best match
GENERAL-MP-MS-Monsoon Preparedness 2026-27-Peringottukurrissi Canal from ch 0/000-24/220 km and its sub canals, and all field channels-General Civil Work
CPP-TMS-ACTION PLAN-(2026- 2027)-Engaging Labour for removing Obstructions during water distribution for Main canal and all its Branches and Distributory Canals under Section1/1
GENERAL-CSM 2024-25-Urgent Removal of obstructions in LBMC from Ch 22/950 km to 29/300 Km and Killimangalam, Pynkulam, Panjal branch canals - General Civil Work
GENERAL-CSM- 2023-24-Urgent Removal of obstructions in LBMC from Ch 22/950 km to 29/300 Km and Killimangalam, Pynkulam, Panjal branch canals-General Civil Work
Thottumugham LIS-HT Upgradation of HT installation including supply, installation, testing and commissioning of additional transformer and allied works
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
GENERAL Main canal PyIP Clearing jungle in Main Canal between ch 6 200km and ch 15 000km and Desiltation of Cut and Cover near ch 9 500km for the year 2023 24 General Civil Work
CANAL CONSTRUCTION
CANAL CONSTRUCTION
Annual maintenance of Edappally branch canal between ch.11.00 km to 15.50 km , including pre water distribution cleaning, operating all shutters, and nets, proper watching of canals and canal bund,clearing siphons - well drops, clearing- For one year
Pothundy Project 2020-21 - Emergency works arising during water distribution at head works and all canals - Urgent rectification works to the partially breached left canal bund at ch 3/210km near Arimpoorpathy and to the canal of RBMC.
CLEANING OF WATER DRAINAGE AND CANALS
GENERAL-PVIP-ACTION PLAN 2024-25- Mechanical work-Repairs to main shutters of Mamala MD, Peringala MD, Kaninad MD canals for the year 2024-25-General Mechanical Work
Annual maintenance of canal
Annual maintenance of canal
Man Mazdoor for Canal cleaning Hydraulic excavator
G E N E R A L - A M C L I S 2 0 2 2 - 2 3 Kochukadavu, Eravathur, Vennuthura and Paramus Compound-Annual Maintenance (Electrical) estimate for the year 2022-23 under Minor Irrigation Division Thrissur
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation canal
Rectification of Irrigation Canal
Rectification of Irrigation canal
Rectification of Irrigation Canal
Rectification of Irrigation canal
Rectification of Irrigation Canal
Expression of Interest for Empanelling of Original System Manufactures for Micro Irrigation System component to the micro irrigation scheme implemented by Agriculture Development and Farmers Welfare Department
The proposed work is envisaged to construct a check dam on the upstream side of Malankara dam near Kanjar bridge and the renovation works of Kanjar water shed theme park.
GENERAL Annual maintenance Vallikodu Distributary KIP O M Annual Maintenance of Vallikodu distributary from Ch 0m to 8054m Vallikodu minor distributary from Ch 0m to 2285m Nariyapuram minor distributary from Ch 0m to 6800m and Thrippara minor disti
Pramadom LI scheme is located on the left bank of Achankovil river at Maroor near Paramadom in Pramadom Grama Panchayt in Konni Block, Pathanamthitta District.. Achenkovil river is the source of water for this scheme.
Rectification work of Irrigation canal and structure
Construction of canal in Pattanchery branch canal near Ch.0.700Km
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation Canal
GENERAL KIP O and M Annual Maintenance of Paranthal Distributary from ch 0m to 5150m Kadakkadu distributary from ch 0m to 6919m Keerukuzhi minor distributary from ch 0m to 2325m and Poozhikkadu distributary from ch 0m 4415m
GENERAL-CSM 2022-23-CSM-2022-23 Urgent Removal of obstructions in LBMC from Ch 29 300km to 40 900 Km and kondayoor branch canal-General Civil Work