Loading…
Loading…
13,559 results • Best match
repair of LI scheme
This investigation estimate is to included for conducting the preliminary survey at upstream and downstream of the proposed check dam location.
Deepening of Canals in Mulavukad GP(BP joint)
GENERAL_Pazhassi Irrigation _PyIP-Rectification and reformation of Mahe Branch Canal between ch_5_100km and ch_5_300km _Providing lining_General Civil Work
Puzhakkal Block Panchayat 2019-20 Jalasamridhi Construction of Irrigation Canal at Kottekkad Pallithazham Padasekharam (Proj No.156/19)
Annual Plan-E-COLONY IRRIGATION CANAL ROAD TARRING-WARD 18- PRO.392/25-Ward 18-General Civil Work
KZMD GP 220 2021 22 KUTTAMASERY MULLANKUZHY IRRIGATION CANAL RAOD TILE PAVING IN WARD 05 KEEZHMAD GRAMA PANCHAYATH
Annual Plan-Edathiruthy GP 2025-26 Irrigation Canal Road Maintenance -SO 244/26-General Civil Work-Ward 3
GENERAL-GPS -I-RBC-2025-2026-Annual Maintenance - Jungle clearance and silt removal of Canals-For R.B. Main Canal between Chainage 03/000 km and 06/000 km
GENERAL-GPS -I-RBC-2025-2026-Annual Maintenance - Jungle clearance and silt removal of Canals-For R.B. Main Canal between Chainage 0/000 km and 03/000 km
GENERAL-GPS -I-RBC-2025-2026-Annual Maintenance - Jungle clearance and silt removal of Canals-For R.B. Main Canal between Chainage 06/000 km and 09/000 km
GENERAL-GPS -I-RBC-2025-2026-Annual Maintenance - Jungle clearance and silt removal of Canals-For R.B. Main Canal between Chainage 12/000 km and 15/000 km
CPP MLIS Annual maintenance for the year 2022 23Emergency works in the canal,pump houses,transformers and engaging labour for removing obstructions in the canals during water distribution
GENERAL-GPS -I-RBC-2025-2026-Annual Maintenance - Jungle clearance and silt removal of Canals-For R.B. Main Canal between Chainage 09/000 km and 12/000 km
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC 3 Construction of Check Dam to the Downstream of Aruvippuram Bridge in Pullampara Grama Panchayath
Estimate for the cost of de-silting of Kappithottam Check Dam in 2004 TP at Elival section under Olavakkode Range during 2019-20
GENERAL-Annual maintenance work for 2025-26-Annual Maintenance to Check dam across Panathur river at Erinhilamkode in Panathady Panchayath-General Civil Work
State Plan 2022-23- Providing pre cast RCC Slabs for check dam and renovation works to the old Culvert at Base farm Kolahalamedu
Cost of Desilting of Check Dam at 4 Locations viz. Karappara-Anakkayam, Anamedu, Cheeramada- Kanthalam and Thoothamppara under Nelliyampathy Range during 2022-23
Estimate for the cost of de-silting of Onnamthodu Check Dam in 2001 TP at Elival section under Olavakkode Range during 2019-20
GENERAL-Annual Maintenance Work for 2023-24-Annual Maintenance of Check dam across Panathur river at Pookkayam in Kallar Panchayath-General Civil Work
GENERAL-Site Investigation -Construction of check dam and allied works in Chittar tributary of Neyyar river near Chilambara in Trivandrum district-Investigation Work
Rebuild Kerala Initiative-Flood damages 2018 -Restoration of a Check dam Across Poonjar River at Idathil parambu near Poonjar Palace in Poonjar Panchayath
GENERAL-Annual Maintenance work for 2024-25-Annual Maintenance of Check dam across Panathur river at Pookkayam in Kallar Panchayath-General Civil Work
GENERAL-Annual maintenance work for 2025-26-Annual Maintenance to Check dam across Panathur river at Balanthodu in Panathady Panchayath-General Civil Work
GENERAL-Annual maintenance work for 2025-26-Annual Maintenance of Check dam across Panathur river at Pookkayam in Kallar Panchayath-General Civil Work
Annual Plan-Karuvarakundu GP 2023-24 369/24 Dismantling work for Kundoda check dam-369/24-General Civil Work-1 (SO 359/25)
GENERAL-Monsoon preparedness-Mansoon preparedness- Emergency block removal near Kombankuzhy rubber check dam in vorkady panchayath of Manjeswaram LA Constituency-General Civil Work
GENERAL-Annual Maintenance Work for 2022-23-Annual Maintenance of Check dam across Panathur river at Pookkayam in Kallar Panchayath-General Civil Work
E Tender-Revision Project 2019-20 - 308/20 Kulappuram Poothakuzhi Thodu Samrekshanabhithi and Padappadi thodu Check Dam Samrekshanabhithi nirmanam in Kanjirappally Grama Panchayat.
Rentender - Annual Plan-Alathur Block Panchayath Annual Plan-2025-26-Check Dam Parakunnam Gramam Road Tarring-Proj No 86 in Alathur Grama Panchayath
Annual Maintenance 2025 Vallikodu Distributary KIP O and M Annual Maintenance of Vallikodu distributary from Ch 0m to 8054m Vallikodu minor distributary from Ch 0m to 2285m Nariyapuram minor distributary from Ch 0m to 6800m and Thrippara minor dist
Deepening and Desilting Canals.
Rectification work
Rectification of Irrigation canal and bund road
Rectification of Irrigation Canal
Rectification of Irrigation Canal
Rectification of Irrigation canal
Rectification of Irrigation canal
GENERAL CSM 2024-25 Annual maintenance of LBMC between CH 22/950KM to 25/000KM including clearing and silt removal of Killimangalam Pynkulam and Panjal branch canals-General Civil Work
GENERAL-BSP-Peral distributary-BSPConstruction of screw driven mechanical shutters for the Peral distributary-General Mechanical Work
Providing community Micro Irrigation. For further Description please refer tender documents
Compound wall work of Vazhapuzha Lift irrigation system pump house.
MLA-SDF-KIP (RB)-Concreting of canal road from Thoppilmukku to Kumbazhamukku of Chavara distributary between ch 8783m and 8838m in Mynagapally Gramapanchayath- General Civil Work
GENERAL-KyIP-CADA 2024-25-Renovation and mordernisation works to Vellarakkad distributary canal between ch 0/000 km and ch 1/300 km-General Civil Work
GENERAL KyIP Emergency maintenance SDRF 2025 26 Demolishing Aqueduct near ch 0 450km of Purameri distributary canal in Purameri Panchayath Kuttyadi LAC General Civil Work 1
KPIP Monsoon Preparedness work Urgent canal cleaning of Karumanamkurissi between Ch 1/200km to 1/550km and kulakkad distributary between ch 1/800km to 2/100km
Canal maintenance work
Annual Maintenance of Canals
GENERAL-MP-ES-Annual Maintenance 2025-26-Silt Removal , Jungle Clearance for Kurissi-Pampadi branch canal between Ch-0-000km to TD and its sub canals Estimate amount 13.50 lakhs