Loading…
Loading…
13,560 results • Best match
Construction of Leading Channel
Construction of pump house, suction pit, laying of DI pipe for LI Scheme
CIVIL
160mm PVC Pipe line extension
dwss
Refer tender document
Karyathodinu Kurukke Thadayana Nirmanam ward 17
Deepening And Cleaning Of Various Canals
P.N0.165/22 Protection works for various canals-Perumannaklari GP
Renovation works to the canals of Mandaram LI scheme
Annual Plan-CLEANING OF DIFFERENT CANALS IN ARPOOKARA GP
103/25 Side Wall for Natural Canals and ponds
Soil investigation
GENERAL MP LBC KS 2023 24 Annual maintenance of Ethanur branch canal from ch 0.000km to 2.650km, Kakkayur branch canal from ch0.000km to 1.938km, Koduvayur branch canal from ch0.000km to 2.939km and Pallavur1 branch canal from ch0.000km to
Cleaning obstructions in various canals
KyIP 2023-24 (Thodannur block Panchayat deposit work) Construction of bridge across Cherandathur distributary canal near ch 0/500km in Maniyur grama panchayat-General Civil Work
GENERALUrgent repair works to Irrigation office building-Maintenance work to Irrigation subdivision office building in Parappananagadi municipality in Malappuram district-General Civil Work
GENERAL Thenmala MS2 KIP RB Fabrication Painting and Erection of shutter and Hoisting mechanism (2Nos) at Chavara Distributary offtake Ch 22751M of Sashthamkotta Branch Canal (SBC) General Mechanical Wok
LAC ADS KIP RB 2025 26 Thevalakkara Grama Panchayath Ward 6 Concreting of canal bund road from Thoppilmukku to Gurumandiram on the left bank of Chavara Distributary canal Ward 5 PulimoottilKadavu Karamel Bhagam bund road concreting second reach on
DEPOSIT-Irrigation Project Circle-1 -LANInstallation of LAN-General Electronics Work
DEPOSITKPIP DEPOSIT 2024 25 Jungle clearance and silt removal for No 7 distributary and Vengassery distributary General Civil Work
GENERAL-KIP -Annual maintenance -KIP LB Annual maintanance of canals- LB Main canal from ch 13500 to 26129 ,Melila East distributory and jungle clearance of Nelipally campus-General Civil Work
GENERAL-Modernization of Canals- NENMARA LAC-2025-26-GPS-II-Chulliyar Main Canal Shutters of Nandankizhaya cross regulator shutters and Nenmeni Branch and cross shutters at Kollengode.-General Mechanical Work
Replacement of 18 nos canal shutters, maintenance of 9 nos shutters and 9 nos of gate valves at various chainages and field bothies in main canal of Pazhassi Irrigation Project.
Rectification to RB main canal
KIP LB Annual Maintenance of canals removal of floating bodies from various canals under KIP LB section 29 19 For the year 2020 21
GENERAL-MVIP-Urgent de siltation and cleaning work of MVIP canals to facilitate water distribution through canals for length of 26.765km -General Civil Work
pre monsoon activities cleaning of canals and waterbodies in kalpetta municipality
GENERAL-MP-LBC-Canal Section Mathur- Annual Maintenance of Peringottukurissi canal and its branches maintaining water distribution, urgent rectification works removal of garbages ,restoration of branches for maintaining water distribution
Rectification of Elattery distributary
The work is proposed for cleaning Ayilur, Nemmara, Paliyamangalam and Thiruvazhiyad branch canals of LBMC for water distribution.
The work is proposed for cleaning Ayilur, Nemmara, Paliyamangalam and Thiruvazhiyad branch canals before second crop water distribution.
GENERAL KIP O and M Annual Maintenance 2025 26 Payyanalloor distributary ch 0 m to 4680 Payyanalloor Minor distributary 0 m to 1310 m Peringanad distributary Ch 0 m to 3270 m and Ammakandakara distributary from ch 0 m to 2210 m General Civil W
GENERAL-AM 2025-26 Annual Maintenance of Arampulikkal Check dam cum Bridge in Chungathara GP of Nilambur Constituency in Malappuram Dt.-AM-General Civil Work
Cost of Maintenance of Thellikkal Vayal 10.05 Ha Thellikkal Check Dam Vayal 4.5 Ha Peruvarippallam Dam Vayal 4.10 Ha under Peruvari Section of Sungam Range
Monsoon preparedness-Emergency block removal near Kombankuzhy rubber check dam and Mudimar VCB cum bridge at Manjeswar river in Vorkady Gramapanchayath of Manjeswar LA Constituency
Estimate for the cost of Construction of Check Dam across Kuthilpara thodu at Irulkunnu area In Kanjirapuzha Forest Station Under Nilambur Range, During 2022- 23
Annual Plan-2023-24, MANGALAM GP CONSTRUCTION OF AVIPPUZHA CHECK DAM IN WARD 16 -PROJECT NO. 313/23-24 (214/24-25)-General Civil Work
Annual Plan 2023 24 Pala Municipality 89 23 24 Check dam road Kochidappadi Cheeramkuzhy kavala Cheruthikkandam Road Naveekaranam in Ward No 7 General Civil Work
Construction of chainlinked mesh fencing along the boundary of proposed sandal re generation plot at Kuppanoda Check dam bhagam in Marayoor Range during 2022-23
Construction of Retaining wall of height 1.20 m and Dry Rubble Check Dam in Vembayam Gramapanchayath of Nedumangad Block in Thiruvananthapuram district under RKVY RAFTAAR
GENERAL-Operation Vahini 2026-27-Removing the obstruction and Cleaning of Kaliyar river near Parambanchery check dam in Ayavana and Pothanicadu Gramapanchayath-General Civil Work
GENERAL-Investigation Estimate - Investigation for construction of Check Dam across Kabini River at Chekadi in Pulpally Panchayath, Sulthan Bathery LA, Wayanad Dist.-General Civil Work
Renovation of canals
Annual Maintenance of Canals
Rectification of Irrigation canal aqueduct
Rectification of Irrigation canal
GENERAL-KPIP-AM-KPIP-AM- Jungle clearance, Silt removal and canal cleaning works for Ottappalam distributary and its minor distributaries for the year 2024-25 General Civil Work
MLA SDF 2021 22 Formation of canal bund road from Ch 1400 to 1500m of KIP Chathanur Thazham minor distributary at Kalluvethamkuzhi ward No 14 of Chathanur Panchayath.
canal work